BLK31-NE-BP-IM-IMR-0052

PSVM

IDSNo='BLK31-NE-BP-IM-IMR-0052' AND Revision='03'

Updated 15 Sep 2008 11:25 CET Updated By van Dokkum, Tijn


Preliminary Status
IR Title
Preliminary Request Accepted
Seabed Flexible Jumper Tie in Configuration Final Status

IR No Rev No Date Originated


BLK31-NE-BP-IM-IMR-0052 03 12 Jul 2008 14:10 CET

Originating Person Originating Company Responding Company


James, Richard BP Prog URF1 (HMC)

PART 1 - RAISE INTERFACE REQUEST (IR)


Requesting Party Interface Description:
Level 1 (Package) * SURF (Flex)
Level 2 (System) * Flexibles
Level 3 (Schedule Reference)
Interface ID

Interface Data Required: *


James, Richard 16 Jul 2008 01

To define the equipment at the connection between seabed flexible jumper and subsea structure 
[e.g. bending restrictor] the Tie-In configuration for the interface at each termination is required.

Flexible CONTRACTOR therefore requests the following:

* Nominal Elevation of Connection Above the Seabed (m)
* Tolerances within Elevation of Connection Above the Seabed (m) 

For EACH END of the 6-in Gas Lift flexible jumpers.

Schedule Preliminary Info * Final Info


Required By Dates: 28-Jul-08

Requesting Party Initiator Date Date

James, Richard 16 Jul 2008

PART 2 - ACCEPTANCE OF INTERFACE REQUEST


Requesting Party Interface Eng: Accepted Date: Accepted Date:
Doyle, Tom 16 Jul 2008

BP Requesting Party Delivery Lead: Acknowledged Date: Acknowledged Date:


James, Richard 16 Jul 2008

Printed by: Tijn, van Dokkum. 15-Sep-2008 12:44, (ID=1874). Concept By Omega AS. Page 1 of 4
BP Requesting Party Interface Eng: Acknowledged Date: Acknowledged Date:
Doyle, Tom 16 Jul 2008

Responding Party Interface Eng: Accepted Date: Accepted Date:


VerDult, Cor 28 Jul 2008

Nominated Responder: Nominated Responder:


Klaassen, Folkert
BP Responding Party Interface Eng: Accepted Date: Accepted Date:
Hawthorn, Phil 22 Jul 2008
BP Responding Party Delivery Lead: BP Responding Party Delivery Lead:
Crawford, Michael
Acknowledged Date: Acknowledged Date:
22 Jul 2008

BP Additional BP Additional

Acknowledged Date: Acknowledged Date:

PART 3 - INTERFACE RESPONSE - PRELIMINARY INFORMATION

Printed by: Tijn, van Dokkum. 15-Sep-2008 12:44, (ID=1874). Concept By Omega AS. Page 2 of 4
van Dokkum, Tijn (HM) 15 Sep 2008 03

+2.5m EL with a tolerance of +200mm -400mm depending on penetration of the mudmat and settlement.

The attached assembly drawing details the connection and its relative position on the FTA structures.  The 
drawings is only at internal review stage but this dimension will not change.

Please note, as has already been said, URF1 can only respond to part of this question in that we are not 
responsible for the connection into the Gas Lift Manifold.

VerDult, Cor (HM) 07 Aug 2008 02

HMC WILL SUPPLY THE INFORMATION RELATED TO THE FTA END OF THE GAS LIFT 
FLEXIBLE

Crawford, Michael (BP) 22 Jul 2008 01

Richard - HMC can only provide information relating to the FTA end of the gas lift flexible, a separate 
interfacr will have to be raised with Cameron to provide information at the gas lift manifold end

James, Richard (TF) 12 Jul 2008 NN

To define the equipment at the connection between seabed flexible jumper and subsea structure 
[e.g. bending restrictor] the Tie-In configuration for the interface at each termination is required.

Flexible CONTRACTOR therefore requests the following:
* Nominal Elevation of Connection Above the Seabed (m)
* Tolerances within Elevation of Connection Above the Seabed (m)
 
For EACH END of the 6-in Gas Lift flexible jumpers.
 
32095302-110602-DR-0693.pdf

PART 4 - ACCEPTANCE OF PRELIMINARY INTERFACE RESPONSE


Responding Party Interface Eng: Accepted: Date:
VerDult, Cor
BP Responding Party Delivery Lead: Acknowledged: Date:
Crawford, Michael

BP Requesting Party Delivery Lead: Acknowledged: Date:


James, Richard
Requesting Party Interface Eng: Accepted: Date:
Doyle, Tom
Requesting Party Initiator: Accepted: Date:
James, Richard
BP Additional: Acknowledged: Date:

Preliminary Response Rejected/Comment:


Acceptor: Add comment to explain rejection or proposed change
Acknowledger: Add comment or see Interface team (Note: Acknowledger cannot reject)

Printed by: Tijn, van Dokkum. 15-Sep-2008 12:44, (ID=1874). Concept By Omega AS. Page 3 of 4
PART 5 - INTERFACE RESPONSE - FINAL INFORMATION

PART 6 - ACCEPTANCE OF FINAL INTERFACE RESPONSE


Responding Party Interface Eng: Accepted: Date:
VerDult, Cor
BP Responding Party Delivery Lead: Acknowledged: Date:

BP Requesting Party Delivery Lead: Acknowledged: Date:


James, Richard
Requesting Party Interface Eng: Accepted: Date:
Doyle, Tom
Requesting Party Initiator: Accepted: Date:
James, Richard
BP Additional: Acknowledged: Date:

Final Response Rejected/Comment:


Acceptor: Add comment to explain rejection or proposed change
Acknowledger: Add comment or see Interface team (Note: Acknowledger cannot reject)