PSVM
To define the equipment at the connection between seabed flexible jumper and subsea structure
[e.g. bending restrictor] the Tie-In configuration for the interface at each termination is required.
Flexible CONTRACTOR therefore requests the following:
* Nominal Elevation of Connection Above the Seabed (m)
* Tolerances within Elevation of Connection Above the Seabed (m)
For EACH END of the 6-in Gas Lift flexible jumpers.
Printed by: Tijn, van Dokkum. 15-Sep-2008 12:44, (ID=1874). Concept By Omega AS. Page 1 of 4
BP Requesting Party Interface Eng: Acknowledged Date: Acknowledged Date:
Doyle, Tom 16 Jul 2008
BP Additional BP Additional
Printed by: Tijn, van Dokkum. 15-Sep-2008 12:44, (ID=1874). Concept By Omega AS. Page 2 of 4
van Dokkum, Tijn (HM) 15 Sep 2008 03
+2.5m EL with a tolerance of +200mm -400mm depending on penetration of the mudmat and settlement.
The attached assembly drawing details the connection and its relative position on the FTA structures. The
drawings is only at internal review stage but this dimension will not change.
Please note, as has already been said, URF1 can only respond to part of this question in that we are not
responsible for the connection into the Gas Lift Manifold.
HMC WILL SUPPLY THE INFORMATION RELATED TO THE FTA END OF THE GAS LIFT
FLEXIBLE
Richard - HMC can only provide information relating to the FTA end of the gas lift flexible, a separate
interfacr will have to be raised with Cameron to provide information at the gas lift manifold end
To define the equipment at the connection between seabed flexible jumper and subsea structure
[e.g. bending restrictor] the Tie-In configuration for the interface at each termination is required.
Flexible CONTRACTOR therefore requests the following:
* Nominal Elevation of Connection Above the Seabed (m)
* Tolerances within Elevation of Connection Above the Seabed (m)
For EACH END of the 6-in Gas Lift flexible jumpers.
32095302-110602-DR-0693.pdf
Printed by: Tijn, van Dokkum. 15-Sep-2008 12:44, (ID=1874). Concept By Omega AS. Page 3 of 4
PART 5 - INTERFACE RESPONSE - FINAL INFORMATION
Printed by: Tijn, van Dokkum. 15-Sep-2008 12:44, (ID=1874). Concept By Omega AS. Page 4 of 4