Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

RESUME

WORK EXPERIENCE

CUSTOMER ENGINEER
Schindler India Pvt. Ltd. Apr 2021 - Present

Perform technical inspections and repairs of elevator


equipment and systems to ensure conformity with
maintenance standards, recommending adjustments as
necessary to preserve equipment integrity or react to
changing operating conditions.
Conducts through hands-on investigations and inquiries
Akshay R. Barge into equipment or system failures, and problem
installations. analyzes the effectiveness of preventive
maintenance practices and suggest improvements in
Mechanical Engineer those practices.
Coordinates with supervisors and provides field training
for other activities.
akkyrbarge12@gmail.com Ability to troubleshooting.
9987669359 Ability to deal courteously with customers, coworkers &
contractors.
linkedin.com/in/akshayrbarge Maintain 70+ elevators(5500 Product) in NCP Lodha
Mumbai.
ABOUT ME Execute the periodic maintenance of the installations in
route as per agree time lines and considering the
I am Akshay Ravindra Barge From
Satara, Maharashtra and currently
Schindler Safety and Quality standards.
Working As Customer Engineer at Attend the call backs as and when received and
Schindler India Pvt. Ltd. I have complete the loop by providing feedback.
completed My BE (Mechanical Plans the jobs and provides supervision to the sub –
Engineering) in Pillai HOC college of contractors’ workers for timely completion of the
Engineering & Technology, Rasayani, service.
Khalapur Raigad.
Propose sale of spare parts as and when situation
demands.
SKILLS
Co-ordinate with the FSB for requirement of spares and
components.
AutoCAD 2D
Ability to read and understand electrical circuit diagram
Solid Works
.
AutoCAD 3D(Basic)
SAP PP
Ms Office
Project Management
PREVIOUSE WORK EXPERIENCE
Leadership
Problem Solving
Work Effectively Under PRODUCTION & QUALITY CONTROL ENGINEER
Pressure Cliffkumar Engineering Pvt. Ltd. Nov 2018 - Mar 2021
Knowledgeable of Fabrication
Process
To review datasheet & Drawings and prepare Bill of
Material, and change drawings with Autocad 2D if
Language required.
Production supervision.
English Prepare Quality procedures and Quality control plan.
Marathi Achieve monthly production targets.
Hindi Prepare all inspection reports.
providing guidance to team.
Complete all daily tasks and special assignments with
an efficient and quality driven approach.
RESUME
EDUCATION HISTORY Preparing All Inspection reports.
Inward material visual, dimension check.
B.E in Jun 2014 -Jul 2018 Responsible for in process Inspection of product.
Conducting Welder Qualification test, and preparing
Mechanical Engineering
related documents.
Mumbai University Inspection of liquid penetrate testing on Welding joints.
-Passed with 6.52 CGPI Follow-up in surface preparation of raw steel including
sand blasting& painting.
Painting Checking Primer, intermediate, final caot. (DFT
HSC in Jun 2012 -May 2014
& WFT)
Inspecting and testing the products at various stages in
Science (12Th)
the production
Maharashtra State Board process.
-Passed with 68.46% Final TPI inspection and documentation.

PROJECTS IN CLIFFKUMAR ENGINEERING PVT. LTD.


SSC in (10Th) Jun 2002 -May 2012
1) L&T IKEA Turbhe (Doing shop
Maharashtra State Board Fabrication)
2) JSW Dolvi (Doing shop
-Passed with 82.18% Fabrication)

Personal Detail Internship


Name-Akshay Ravindra Barge . Completed In Plant Training
Father’s Name- Ravindra Jaysingh Barge for 15 days date 26/12/2017 to 10/01/2018
Nationality- Indian At ST workshop kalwa , MSRTC Thane., Maharashtra
Date of Birth- 17th July 1996
·
Hobbies- Travelling, Cycling,
Trekking, Listening Music Industrial Training
Sex- Male For 15 days date 28/6/2017 to 12/07/2017
Marital Status- Single At Sanpada carshed CENTRAL RAILWAY NAVI MUMBAI 400705
Passport No.- S6841076
Place Of Issue- Mumbai
Date Of Issue- 10/08/2018 Academic project
Date Of Expiry- 09/08/2028
Title- Simple Pendulum Based Power Generator
Abstract- The pendulum setup has been made, that is
whenever it has been kicked off the kinetic energy of
ball makes the pendulum to oscillate, generates the
electrical energy .We can implement the pendulum based
power generation system in real time application wherever
the vibration produced. We can implement a
pendulum based power generation system in such dynamic
application we can generate power from it.

Declaration
I, Akshay R Barge , hereby declare that the information contained
herein is true and correct to the best of my knowledge and belief.

___________________________
Akshay Ravindra Barge

You might also like