Professional Documents
Culture Documents
Mapping Injeksi Balok SF (19 July 23)
Mapping Injeksi Balok SF (19 July 23)
Mapping Injeksi Balok SF (19 July 23)
13800
4000 380
1275 10000 2525
C
B STR 202
STR 201
14000
Reinforcement Concrete Wall
2335 With Water Proofing Layer Thk.100mm
4002
Double Ø10-150, Ø8-150
2550
B3 B3 490 B3 B3 100
E
BALCONY SUITE 5 GARDEN SUITE 5
B2 B2 FL + 7.450 B2 FL + 7.800 B6 MEP
1275 B2 SHAFT B3
C4
C8
D
BRC M8
BRC M8
B2 C1 BC1
B1 B1 B1
BATHROOM SUITE 5
B3 B4 B2
FL + 7.450 B7
B3 B1
STR 200
SL=+7.050mm
B7
A
BRC M8 B2 BRC M8 DOUBLE LAYER C8
5625 GARDEN SUITE 5 BRC M8 SUITE 5 SLAB=
FL + 7.800 FL + 7.450 BRC M8 B7
Reinforcement Concrete Wall THK.150mm
BRC M8
Double Ø10-150, Ø8-150 B4 SL=+7.400mm FL + 7.450
B3
B3 B2 B2 B3
13800 B3 FFL=+7.450mm B1
C4 SLAB=THK.120mm C4
14000C OU 14000
AC B3 B1
B2 B1 B5
B3 Reinforcement Concrete Wall
B2 B2
B3 B3 B3 With Water Proofing Layer Thk.150mm
B1 Double Ø10-150, Ø8-150
B3 B3 B3JANITOR B3
5625 GARDEN SUITE 6 B4 SUITE 6 B7 FL + 7.450
FL + 7.800 FL + 7.450 SL=+7.050mm
SLAB= B3
BRC M8 THK.150mm BATHROOM SUITE 6
FL + 7.450
B3
BRC M8 DOUBLE LAYER B1
BRC M8 B2 BOARD DISPLAY
C4 B2 BRC M8 FL + 7.450
B4 B4 B4 B3
C3
B
B4 B5
1275 B2BALCONY SUITE 6
B2 GARDEN SUITE 6 B2
B4 FL + 7.450 FL + 7.800
A B3
B3 B3 B3
Reinforcement Concrete Wall
With Water Proofing Layer Thk.100mm
Double Ø10-150, Ø8-150 2850
BUILD
ING C
ODE S
ETBAC
K ALL
OWAN
CE
BOUN
DARY
550 14000 LINE 380
CANA
L UND
ERGR
OUND