TONIKA CONSTRUCTION PVT.LTD.

Biratnagar,Morang,Nepal

संस्थाको नाम: ब्रहमाकु मारी राजयोग प्रशिक्षण के न्द्र


संस्थाको नाम: ब्रहमाकु मारी राजयोग प्रशिक्षण के न्द्र
कार्यान्वयन हुने स्थल: गढी गा.पा.,खनार मधेली

Abstract of cost
S.N DESCRIPTION OF WORK QUANTITY RATE UNIT AMOUNT REMARKS

A Civil Works
1 Site Clearance 2109.000 10.000 Sq.m 21090
2 Excavation Work 4039.973 317.000 Cu.m 1280671.441
3 Earth Backfilling Works 5748.693 500.000 Cu.m 2874346.5
4 Stone Soiling Work 587.859 4400.000 Cu.m 2586579.6
5 PCC Work(1:2:4) 192.087 8500.000 Cu.m 1632739.5
6 PCC For RCC Work 1535.022 14000.000 Cu.m 21490308
7 Form Work 9373.624 360.000 Sq.m 3374504.64
8 Steel Staging Work 5783.272 350.000 Sq.m 2024145.2
9 Total Reinforcement Work 121.934 110000.000 MT 13412740
10 Brick Work 483.513 13000.000 Cu.m 6285669
11 12.5 mm Thick Plastering 1519.018 450.000 Sq.m 683558.1
12 Total Punning Work 262.032 1000 Sq.m 262032
13 Outter arth filling work Cu.m 450000
B Electrification Work 3750000
Total 60128438.95