Professional Documents
Culture Documents
FEN Mist System
FEN Mist System
BFP-039
BFP-040
BFP-041
EQUIPMENT SUBMITTAL FOR APPROVAL
Submittal No BFP-SMA2995-001
Sub.Date 27/1/2022
Supplier Brigit
Email deon@brigit.co.za
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Drawing Description Data Centre Phase 2- Block C & D Ground floor deluge Layout
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator N/A
(ii) Equipment checked for remote control or BMS interfacing compatibility N/A
(ii) Specified the allowed fault Level for the Electrical Controllers N/A
Sub.Date 27/1/2022
Manufacturer NDE
Supplier Brigit
Email deon@brigit.co.za
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Drawing Description Data Centre Phase 2- Block C & D Ground floor deluge Layout
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator N/A
(ii) Equipment checked for remote control or BMS interfacing compatibility N/A
(ii) Specified the allowed fault Level for the Electrical Controllers N/A
Sub.Date 27/1/2022
Manufacturer C-TEC
Supplier Brigit
Email deon@brigit.co.za
Company A Approved
Responsibil
B
Tel No Approved with Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Drawing Description Data Centre Phase 2- Block C & D Ground floor deluge Layout
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator N/A
(ii) Equipment checked for remote control or BMS interfacing compatibility N/A
(ii) Specified the allowed fault Level for the Electrical Controllers N/A
27/1/2022
MWP Eskom
us