EQUIPMENT SUBMITTAL FOR APPROVAL
Submittal No BFP-SMA2995-001
Sub.Date 18/1/2022
Manufacturer Carriers
Email victor.martins@carrier.com
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Author : JJ Havenga
Date : 07/21/2023 Page 3 of 63 Email :jhavengaj@tfmc.co.za
Contact : 082 4508497
System & Fuction Description Addressable Fire Control Panel - ZP3
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Author : JJ Havenga
Date : 07/21/2023 Page 4 of 63 Email :jhavengaj@tfmc.co.za
Contact : 082 4508497
(iii) MTTF & MTTR of Major Equipment To Follow
Drawings
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator Yes
(ii) Equipment checked for remote control or BMS interfacing compatibility To Follow
(ii) Specified the allowed fault Level for the Electrical Controllers Yes
Author : JJ Havenga
Date : 07/21/2023 Page 5 of 63 Email :jhavengaj@tfmc.co.za
Contact : 082 4508497
Author : JJ Havenga
Date : 07/21/2023 Page 6 of 63 Email :jhavengaj@tfmc.co.za
Contact : 082 4508497
EQUIPMENT SUBMITTAL FOR APPROVAL
Submittal No BFP-SMA2995-002
Sub.Date 1/22/2022
Manufacturer Carries
Email victor.martins@carrier.com
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Maintenance Instructions & Procedures
Drawings
(i) Equipment checked for adequate power supply an local electrical isolator Yes
(ii) Equipment checked for remote control or BMS interfacing compatibility To Follow
(ii) Specified the allowed fault Level for the Electrical Controllers Yes
Sub.Date 18/1/2022
Manufacturer Carries
Email victor.martins@carrier.com
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator Yes
(ii) Equipment checked for remote control or BMS interfacing compatibility To Follow
(ii) Specified the allowed fault Level for the Electrical Controllers Yes
Sub.Date 18/1/2022
Manufacturer Carries
Email victor.martins@carrier.com
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator Yes
(ii) Equipment checked for remote control or BMS interfacing compatibility To Follow
(ii) Specified the allowed fault Level for the Electrical Controllers Yes
Sub.Date 18/1/2022
Manufacturer Technoswith
Supplier Technoswitch
Email deon@technoswitch.co.za
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator Yes
(ii) Equipment checked for remote control or BMS interfacing compatibility To Follow
(ii) Specified the allowed fault Level for the Electrical Controllers Yes
Sub.Date 18/1/2022
Manufacturer Spectrex
Supplier Technoswitch
Email deon@technoswitch.co.za
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator Yes
(ii) Equipment checked for remote control or BMS interfacing compatibility To Follow
(ii) Specified the allowed fault Level for the Electrical Controllers Yes
Sub.Date 18/1/2022
Manufacturer Carries
Email victor.martins@carrier.com
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator Yes
(ii) Equipment checked for remote control or BMS interfacing compatibility To Follow
(ii) Specified the allowed fault Level for the Electrical Controllers Yes
Sub.Date 18/12/2022
Manufacturer Bosal
Email zain.adam@bosal.co.za
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator Yes
(ii) Equipment checked for remote control or BMS interfacing compatibility To Follow
(ii) Specified the allowed fault Level for the Electrical Controllers Yes
Sub.Date 18/1/2022
Manufacturer Carries
Email victor.martins@carrier.com
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator Yes
(ii) Equipment checked for remote control or BMS interfacing compatibility To Follow
(ii) Specified the allowed fault Level for the Electrical Controllers Yes
Sub.Date 18/1/2022
Manufacturer Carries
Email victor.martins@carrier.com
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator Yes
(ii) Equipment checked for remote control or BMS interfacing compatibility To Follow
(ii) Specified the allowed fault Level for the Electrical Controllers Yes
Sub.Date 18/1/2022
Manufacturer Carries
Email victor.martins@carrier.com
Company A Approved
Responsibility
B Approved with
Tel No Remarks
Manufactures Data
Descriptive Literature
(i) First, Second & Final Fix Quality Inspection sheet Yes
(viii) Proper operation of the installation shall be demonstrated to the Engineer Yes
Drawings
Equipment/Component Interface
(i) Equipment checked for adequate power supply an local electrical isolator Yes
(ii) Equipment checked for remote control or BMS interfacing compatibility To Follow
(ii) Specified the allowed fault Level for the Electrical Controllers Yes