Professional Documents
Culture Documents
01 - Lift Details-2
01 - Lift Details-2
6" 6"
6" 6"
1'
1'
9"
9"
P1 P1
1'
6" 6"
9"
1'
P1
9"
FC1
EB1 RB1
EB2
RB1
RB1
EB1
FC
EB2
12'-9"
6" 6#12Y
LIFT-2 6#12Y
17'
C.S OF P1
C.S OF C1/FC1
T3
2'-3" DETAILS OF ROD ANCHOR (1'0" DIA)
(0'9"X0'9")
6'-3"
(15' DEPTH)
D6 D6
3#12Y
MD
26'-6"
D1 16'-11" 4'
BEAM : 25 mm
REV. DESCRIPTION DATE BY CHD. PROPOSED HOSPITAL BUILDING
FOOTING : 50 mm AMENDMENT
SLAB : 20 mm VIRUTHUNAGAR
CLIENT: DRAWING TITLE: Ar.BR.Gowresankar,M.Arch(I.A)
6. WHEREAS ' Y ' DENOTES YIELD STEEL BAR
7. ANY MISMATCH BETWEEN SITE CONDITIONS AND
A NEOWAY GROUP OF HOSPITAL LIFT DETAILS-2 4th floor ,Bread & Brown building ,
ISSUED STRUCTURAL DRAWINGS IS TO BE BROUGHT AMAZE PROPERTIES
TO THE NOTICE OF THE STRUCTURAL ENGINEER.
INDIA LIMITED Bye pass road, Madurai-16. CONSULTING ENGINEERSONSULTING ENGINEERS
Build your Dreams
8. APPROVAL SHALL BE MADE WITH STRUCTURAL
ENGINEER BEFORE CONCRETING.
SIGNATURE......................................................
R0
DRAWING NO:
cb-2018-01-028
A3-01 Er.S.NAVANEETHAKRISHNAN ME(Structures)
LIFT DETAILS-2