Shaft-F: Ceiling Penetration

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES

Re-circulation Pipe To Below


DOMESTIC HOT WATER SUPPLY AND LEGEND
RETURN PIPE ( PPR- SDR 7.4 & PN 16 ) Pipe To Below Pipe from Below to be discuss where 1. THIS DRAWING IS TO BE READ WITH THE PROJECT
attached in drain WAFER TYPE LEVER BUTTERFLY VALVE SPECIFICATIONS AND ALL OTHER CONTRACT
Nominal External Internal Insulation
thickness Pipe To Below water Pipe To Below DOCUMENTATION.
Pipework continue at plant room WAFER TYPE GEAR BUTTERFLY VALVE
15 20 14.4 20mm IL +24.49m Pipe-work
20 25 18.0 20mm C AS High Level rising along with wall Water PipWork to Below Pipework continue at plant room BALL VALVE 2. EXACT LOCATION OF SANITARY WARE SHALL BE
25 32 23.2 30mm Shaft-E
NON-RETURN/CHECK VALVE COORDINATED WITH ARCHITECT.
32 40 29.0 30mm
MWT 2000 Ltr 2000 Ltr 2000 Ltr
500 Ltr
Water Tank BAV BAV
BAV Water Tank Water Tank Water Tank RUBBER EXPANSION BELLOW 3. ALL HOT WATER PIPEWORK SHALL BE INSULTED
CWT2 SCWT
BAV
PV PV
STR CWT1 WITH MINIMUM 25MM INSULATION CLOSED CELL
DOMESTIC COLD WATER ,SECOND CLASS WATER STR BAV
BAV BAV
STRAINER TYPE - CLASS 1 BS 476 Part1:1987.
P AND MAINS WATER PIPE ( PPR- SDR 11 & PN 10 ) STR
BAV
BAV STR
STR BAV
AUTOMATIC AIR VENT
Nominal External Internal 300mm wide 100mm wide
low Level along 4. ALL PIPEWORK SHALL BE PP-R SDR 7.4 TYPE AND
100mm wide Pipework Cable Pipework Cable tray with Finish floor RISER/DOWNDROP SIZES SHOWN ARE INTERNAL PP-R PIPE SIZES.
15 20 16.2
B Pipework Cable tray low Level along tray low Level along
with Finish floor with Finish floor
20 25 20.4 FLOW SWITCH
25 32 26.2 Float valve Float valve Float valve 5. INVERT LEVEL OF DUCTING PIPING AND ELECTRICAL
Rev 4 PRESSURE GAUGE
32 40 32.6 SERVICES MEASURED FROM FFL ONLY IN PLANT
O 40 50 40.8
TEMPERATURE GAUGE
ROOM L0. BUT ALL OTHER FLOORS LEVELS THE
50 63 51.4 INVERT LEVEL OF DUCTING PIPING AND ELECTRICAL
IL +24.49m
AS High Level CHANNEL SUPPORT SERVICES MEASURED FROM 0.00
A MEZZANINE FLOOR SCALE-1:75 PIPE HANGER

Component Brand
BALANCING VALVE
N Level Designation Model Size Capacity Scope
Designation Manufacturer
MW-P Makeup water pump Lowara ECOCIRC BASIC 32-6/180 L x W x H (180 x 104 x 141mm) DN 32Flow rate 0.5 m3/hr @ head 4 mtr Kencar SEA WATER PIPE WORK
MWT Mains water tank Top Roto - Cyprus 500 L L x W x H (1300 x 750 x 820mm) 500 Litre Kencar
AHU-B Air Handling Unit -B GMC AIR DHS-50 248-186 [3600 PHE CWC HWC DCM] L x W x H (4975 x 2730 x 4060mm) Cooling Coil: 363 kW & Heating Coil: 50 kW Kencar CHILLED WATER PIPE WORK
CWP Cold water pump Calpeda MXH 802/B Under Observation 239 x 203 x 190 Flow rate 8 m3/hr @ head 26.6 mtr CEI
LEVEL 2 SCWP Second calss water pump Calpeda MXH 802/B Under Observation 381 x 146 x 193 Flow rate 11 m3/hr @ head 30 mtr CEI
CONDENSER WATER PIPE WORK
SCWT Second class water tank Top Roto 2000 L L x W x H (1850 x 1180 x 1260mm) 2000 Liter CEI
HOT WATER PIPE WORK
M CWT1 Cold water tank 1 Top Roto 2000 L L x W x H (1850 x 1180 x 1260mm) 2000 Liter CEI
CWT2 Cold water tank 2 Top Roto 2000 L L x W x H (1850 x 1180 x 1260mm) 2000 Liter CEI
DOMESTIC COLD WATER PIPE WORK

Shaft-D
PV Pressure Vessel tank Challenger GCB-300LV D x H (530x 1510mm) 300 Litre CEI

DOMESTIC HOT WATER PIPE WORK

Piping Rising Level 1


DOMESTIC HOT WATER RECIRCULATION
FFL +19.90
to Level 4
PIPE WORK
L
LEVEL 2
MAINS WATER SUPPLY PIPING
STL +19.20
LEVEL 2
SECOND CALSS WATER PIPING
MAKEUP WATER PIPING

BAV BALL VALVE

K 600
Shaft-A
600
Shaft-B
NRV NON RETURN VALVE

STR STRAINER

Ceiling Penetration
Supply to Plant Room Area (T/B)

FC RUBBER FLEXIBLE BELOW


Plant Room Area (T/B)
Water PipWork (T/B) PV PRESSURE VESSEL
J
to WC Area (F/B)
MW MAKE UP WATER
Pipe Work ( T/B)
form Ahu-B(T/B)
SCW SECOND CLASS WATER
SHAFT Return from WC Area T/B
Supply to Ahu-B (F/B)
2000x1800mm HW-R HOT WATER RE-CIRCULATION

supply to Ahu-B (F/B) HW-S HOT WATER SUPPLY


I Shaft-C HC-S/R HEATING COIL SUPPLY & RETURN
Return from Ahu-B (T/B)
Cooling Water to VRF-2 (F/B)
CW-S/R CONDENSER WATER SUPPLY & RETURN KEY PLAN
Condenser Cooling
Water from VRF-2 (T/B) CHW-S CHILLED WATER SUPPLY
05 26.09.22 UPDATED SHAFT F UR RC
Under Raised Floor
Under Raised Floor
CHW-R CHILLED WATER RETURN
H IL +19.30m
IL +19.615m
04 16.08.22 COMMENTS COMPILED UR RC
HC-S HEATING COIL SUPPLY
03 16.03.22 COMMENTS COMPILED UR RC
HC-R HEATING COIL RETURN
IL +19.615m
02 07.09.21 COMMENTS COMPILED UR RC
CW-S CONDENSER WATER SUPPLY
01 26.07.21 COORDINATION DESIGN UR RC

SHAFT-F
CW-S CONDENSER WATER RETURN
G 00 10.05.20 DETAIL DESIGN UR RC
REV DATE REVISION DETAILS BY CKD
Under Raised Floor Under Raised Floor
IL +19.30m
G
0929-08-F Under Raised Floor Under Raised Floor
IL +19.615m IL +19.615m
F
Under Raised Floor
Under Raised Floor IL +19.615m
IL +19.615m
Rising up after
Under Raised Floor
cross to pipe
IL +19.615m
E +19.90 FFL Under Raised Floor
LEVEL 2
IL +19.615m Under Raised Floor
+19.20 STL Water PipWork IL +19.615m
Cooling Water from VRF-2 (F/A) LEVEL 2 drop from above soffit Under Raised Floor
Rev 3
+18.70 BFL drop down chased in wall Pipe Work drop from A' IL +19.615m Pipes Drop A' Under raised floor
LEVEL 2 above mezzanine 0929-08-F1 Down 0929-08-F1

+18.80 drop down chased in wall for crossing


Rev 2 Cooling Water to VRF-2 (T/A) EL Water Supply drop from
LEVEL 2 Between
above mezzanine IL +19.615m TH IS DRAWING IS T HE S OLE PR OPER TY O F T HE UNDERSIGNED A ND AN Y
D Return from WC
drop from above mezzanine
Pipes
IL +19.20m
INFORMATION SHOWN ON THIS DRAWING IS CONSIDERED CONFIDENTIAL. ANY
UNAUTHORISED USE, COPIES, OR DISCLOSURE BY ANY MEANS TO THIRD PARTIES
(T/A) L3 Water drop from IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT OF THE UNDERSIGNED
above mezzanine Pipe rising IL +19.20m SHALL NOT BE PERMITTED. DIMENSIONS SHOULD NOT BE SCALED DIRECTLY BUT
Under Raised Floor Pipe work rising to high level
AS along the wall Under Raised Floor SHOULD BE VERIFIED ON SITE, AND ANY OMMISSIONS OR INCONSISTENCIES
IL +19.615m to be connect with reservoir
(T/A) L3 Under Raised Floor Under Raised Floor Under Raised Floor & inside IL +19.615m
Above soffit to mezzanine IL +19.615m IL +19.38m SHOUL D BE R EPORTED IMMEDIAT ELY TO THE ENGINEER IN CHARGE. THIS
IL +19.615m IL +19.615m Cladding /Municipality Main line
Pipe work rising to high level DRAWING SHOULD BE READ TOGETHER WITH THE RELEVANT SPECIFICATIONS
Rising Up to Soffit Level
AS IL 22.49 IL 22.49 IL 22.49 IL 22.49 IL 22.49 IL 22.49
DATE:- DRAWN BY:- CHECKED BY:-
AS IL 22.49 AS IL 22.49 IL 22.49 AS IL 22.49 AS IL 22.49 AS
Rev 3 to be connect with
C
IL 22.49AS Rising Up to Soffit Level
(T/A) L3 IL 22.49 IL 22.49 IL 22.49 IL 22.36 Municipality Main line
26.09.2022 UR RC
IL 22.49 IL 22.49 IL 22.49
Ceiling Penetration
IL 22.49 IL 22.49
SHAFT-F IL 22.49 AS IL 22.49 IL 22.36
AS AS AS
500 IL 22.36 AS
AS
AS AS IL 22.36 IL 22.42 IL 22.42 IL 22.49
IL 22.42 IL 22.37
IL 22.49
IL 22.37 IL 19.38 IL 22.42 IL 22.37 IL 22.37
IL 22.49 IL +23.71m IL +24.56m PROJECT NUMBER:- REV:- SIZE:-
AS
IL 19.38 IL 22.42 AS AS
IL 24.60m Shaft-D under floor IL 22.36 IL 22.37
AS AS
AS High Level
Rev 5
IL 22.36
AS
IL 22.49
IL 22.49 IL 22.36
IL +23.77m IL +24.50m AHU-B 0929 05 A1
26.09.22 IL 22.49
Pipework Rising up
BDD DRAWING NUMBER:- SCALE:-
B IL +24.49m
IL 24.60m
BAV
IL 24.60m
AS High Level iv
0929-08-C 1:100
+19.90 FFL IL +22.63 IL +22.63 IL +22.63
LEVEL 2 Pipework continue at mezzanine floor IL +22.68m IL +22.68
DRAWING STATUS:-
IL +24.49m Pipework continue at mezzanine floor
AS High Level IL +24.49m
AS High Level

A Piping Rising Up Towards to


Slab due Crossing Between Ducting WORKING DRAWING
Supply to Ahu-B Water supply to Ahu-B Air Handling Unit
(F/A) L4 Reference: AHU-B
G STL +19.20
LEVEL 2 Manufacturer: GMC Air
Water (T/A) L4 Outside Area 0929-08-F return form Ahu-B Return from Ahu-B Model: DHS-50 248-186 [3600 PHE CWC HWC DCM]

Shaft-C
(T/A) L4 BFL +18.40 Size: L x W x H (4975 x 2730 x 4060mm) PROJECT NAME:-
LEVEL 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
A
(T/A) L4 0929-08-F EL +18.30
LEVEL 2 MALTA INTERNATIONAL CONTEMPORARY
Water (T/A) L4
ART SPACE - MICAS
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
DRAWING TITLE:-
54.00
0 1 2 3 4 5 6 7 8 9 10m
0.5

PLUMBING PLAN LEVEL 2


Scale 1:100

You might also like