SEPTIC TANK SIZING

(COMPUTATION BASED ON DOH AO2019-0047) & PUMBING CODE


3

DESIGN PARAMETERS
P (NUMBER OF OCCUPANTS) = 10 PERSONS 5.) OVERALL DESIGN CAPACITY
q (WASTEWATER FLOW) = 75 gal/person/day
= 284 l/per/capita/day V(total) = V(sed) + V(sl) + V(d) + V(sc)
V(total) = 1.30cu.m + 0.17cu.m + 3.0cu.m + 1.2cu.m
1.) SEDIMENTATION ZONE
-3 V(total) = 5.67cu.m
V(sed) = 10 (P x q x th) , th = 1.5 - 0.3 log(p x q)
-3 th = 1.5 - 0.3 log(10 x 284) 6.) COMPARTMENTALIZATION
V(sed) = 10 (10x 284 x 0.46) th = 0.46
A B C D E F G V(sed) = 1.30cu.m V(1) = 2/3 x V(total)
V(1) = 2/3 x 5.67 , 0.3m
2.) SLUDGE DIGESTION ZONE V(1) = 3.78cu.m 1.2m V(1) V(2)
-3 35-T
100mm DS 100mm DS 100mm DS , td = 30 x 1.035 35-30
V(sl) = 10 (P x q.sl x td) 3.78 ELEVATION
T/B 75mm DP 75mm DP RD T/B -3 td = 30 x 1.035 L(1) =
100mm DS 100mm DS V(sl) = 10 (10x 0.5 x 35.63) 1.2 x 2.0 L(1) L(2)
RD RD td = 35.63
T/B, F/A T/B, F/A RD L(1) = 1.575m
50mm VP V(sl) = 0.17cu.m V(1) V(2)

11
, T = @ 30deg.celsius 2.0m
100mm DS
40 40

q.sl = 0.5 2/3 1/3


T/B, F/A 3.) DIGESTED SLUDGE STORAGE ZONE

75mm DP
ASCATNO
ASCOLOR
ASNAME
MFR
DESCRIPTION

75mm DP
MFR

100mm SP LAV
WC LAV V(2) = 1/3 x V(total) PLAN
WC
V(d) = r x P x n , n = 3 - 5years V(2) = 1/3 x 5.67

1600
COLOR
DESCRIPTION
MFR

V(d) = 0.06 x 10 x 5 n < 5 , r = 0.06cu.m V(2) = 1.89cu.m


V(d) = 3.0cu.m 1.89
100mm SP
50mm VP

L(2) =
1.2 x 2.0
4.) SCUM STORAGE

100mm SP
L(2) = 0.78m

10
RD V(sc) = 40% x V(d)
RD TOTAL LENGTH = 1.575 m + 0.78m = 2.36m
V(sc) = 40% x 3

50mm VP
V(sc) = 1.2cu.m , SAY 3.0m
7.) RECOMMENDATIONS
, USE SEPTIC TANK DIMENSIONS L(3.0m) x W(2.0m) x H(1.5m)

WC LAV
75mm VSTR 75mm VSTR
T/B, F/A T/B, F/A
WC
LAV LAV 100mm DS
WC 100mm DS 100mm DS
T/B T/B 6'' THICK CHB WALLS WITH 10mmdia. RSB @ EVERY
100mm DS T/B, F/A
RD RD
T/B, F/A 0.40m O.C BETWEEN HORIZONTAL & VERTICAL

9
W14
100mm SP

CONCRETE BEAM WITH 4PCS 12mmdia. RSB


50mm VP

75mm VSTR 75mm VSTR


T/B, F/A T/B, F/A
TENSION BARS, 4PCS-12mmdia. RSB COMPRESSION BARS

8
@ EVERY 10mmdia. RSB TIES @ EVERY 0.15m O.C
LAV
WC 150mm SS
T/B
AIR SPACE AIR SPACE
100mm DS 100mm DS
100mm DS 100mm DS
T/B T/B
IN
T/B, F/A T/B, F/A
RD RD
2400
50mm VP

150mm SS
100mm SP

T/B
7

LAV

WC
6

RD RD
SECTION

OUT
75mm DP
75mm DP

100mm DS LAV 100mm SP


5

T/B, F/A OUT


LAV
CO MANHOLE
3 4

WC WC
100mm DS 100mm DS 100mm DS
T/B, F/A T/B T/B
RD RD RD 75mm DP
2

75mm DP 100mm DS MANHOLE MANHOLE


75mm DP T/B RD
100mm DS

IN
RD CO CO
T/B, F/A RD 75mm DP RD
1

PLAN

PL ROOF LEVEL: DOWNSPOUT/VSTR LAYOUT PL SEPTIC TANK SIZING


PL SECOND FLOOR: SANITARY LAYOUT 3 SCALE: NTS
3 SCALE: 1:100M 3 SCALE: 1:100M

MASTER PLUMBER PROJECT TITLE OWNER SHEET CONTENTS REVISION HISTORY SHEET NO.
DESIGNED BY: DESIGNER
. COPYRIGHT: THE OWNER reserves all rights to these drawings,
NO. DESCRIPTION REVISED BY APPROVED BY DATE
design and/or any other data contained herein. No part of the drawings,
designs and/or other data contained herein may be reproduced, DRAWN BY:
PROPOSED 2 STORY DUPLEX -- -- -- --
modified, transmitted or used in any form by any means for any purpose G/F & 2/F: SANITARY LAYOUT
without the prior written consent of THE OWNER other than for the sole
ENGR. JEZREEL M. MENDOZA BRIAN LISIA DEE DATE DRAWN:
purpose for which such drawings, design and/or other data are provided.

. DIMENSIONS: Contractors shall work from figured dimensions only. REG NO. 14323 TIN NO. 448 776 978 000 LOCATION CHECKED BY:
PL3
Contractors must check all dimensions on site. Discrepancies must be
PTR NO. 371 6557 DATE 1/3/23
reported immediately to the architect for clarification before proceeding 22 CANOPUS ST., BEL AIR, MAKATI CITY APPROVED BY:
on relevant work. PLACE ISSUED. QUEZON CITY