Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GENERAL SAFETY

GC11 Mobile plant – Periodic inspection and checks


Plant checked by operator/user. If defective, remove from service and complete a plant defect report

Company name Project title

Location Contract no.

Date of Plant/equipment description and reference, Outcome of inspection Name (print) and signature of person Defect Plant removed
inspection including rated capacity (safe working load) (If defective, remove from service inspecting plant reported from service
and complete plant defect report)

© Construction Industry Training Board 2019 Construction site safety (GE700) publication

You might also like