Annex A Financial Offer Form - Bills of Quantities For Base and Rubhal Nakivale
Annex A Financial Offer Form - Bills of Quantities For Base and Rubhal Nakivale
Annex A Financial Offer Form - Bills of Quantities For Base and Rubhal Nakivale
3 Ditto but to aprons 400mm wide; n.e 600mm deep CM 34.4 7,000 240,800
4 Extra over excavations : breaking up rock met with the excavations CM 1.0 45,000 45,000
SURFACE TREATMENTS
7 Sides & Surfaces of blinded hardcore and splash appron SM 288.0 1,500 432,000
FILLINGS
9 150mm Hardcore bed: in broken stone blinded with and including 20mm
SM 243.0 12,000 2,916,000
layer of aproved blinding; under floor bed.
REINFORCEMENT
Well burnt clay bricks bedded and jointed in cement and sand (1:3)
mortar with hoop iron 25mm at every alternate 2 courses:
1000 Gauge polythene sheet damp proof membrane with 300mm side
and end laps :
FINISHING
ERECTION OF RUBALL
31 Erect Rubhall complete with all its fittings and accessories ready for use Item 1.0 4,800,000 4,800,000
Page 1 6,714,600
Page 2 25,015,000
Page 3 19,163,800
3 Ditto but to aprons 400mm wide; n.e 600mm deep CM 34.4 7,000 240,800
4 Extra over excavations : breaking up rock met with the excavations CM 1.0 50,000 50,000
SURFACE TREATMENTS
7 Sides & Surfaces of blinded hardcore and splash appron SM 238.7 1,000 238,700
FILLINGS
9 150mm Hardcore bed: in broken stone blinded with and including 20mm
SM
layer of aproved blinding; under floor bed. 238.7 12,000 2,864,400
REINFORCEMENT
Well burnt clay bricks bedded and jointed in cement and sand (1:3)
mortar with hoop iron 25mm at every alternate 2 courses:
1000 Gauge polythene sheet damp proof membrane with 300mm side
and end laps :
FINISHING
ERECTION OF RUBALL
31 Erect Rubhall complete with all its fittings and accessories ready for use Item 1.0 4,200,000 4,200,000
Page 1 6,373,200
Page 2 25,546,000
Page 3 19,328,800
ERECTION OF RUBALL
31 Provide for labour to Erect "wiik Hall" Rubhall complete with all its
fittings and accessories ready for use in accordance with instruction Item 1.0 5,000,000 5,000,000
manual provided
32 Import black organic matter rich soil, spread and level around site and SM 72.0 25,000 1,800,000
Plant approved passpalum and water until established
Total Carried to summary: 28,353,000
SUMMARY
Ground Preparation 22,586,400
Concrete Works 31,945,000
Walling and Finishes 28,353,000
TOTAL 82,884,400