Survey Space Rack & Power

15 Februari 2023
PHE JAMBI MERANG

JAMBI AREA

PT. Mora Telematika Indonesia


Grha 9 6th floor
Jl. Penataran No.9, Proklamasi
Jakarta Pusat 10320, Indonesia

SURVEY REPORT
To : Lifromi
CC : Infrastructure Divison
Site Area : PHE MERANG JAMBI
Dated : 15 02 2023

PROJECT Survey space Rack & Power

 PENGECEKAN DAN PENGUKURAN

NO Ruang REMARK
1 Com tower Done
2 ICT Done
3 Maintenance Done
4 Warehouse Done
5 Fire Station Done
6 Klinik Done
7 VIP Done
8 PDC Rec hall Done
9 Acom A Done
10 PFO Done
11 Project Done
13 Laboratorium Done
14 PG Done
15 Scurity Done
16 IBS Bayung Lencir Tidak ada suplay power
17 IBS Pande Arang Tidak ada suplay power

*NOTED
Shelter IBS tidak ada suply Sistem power

Kebutuhan Material Instalasi


Cable Power NYM 3X2/ 20mtr
PDU 8 HOLE 16 unit
Rack Walmound 6 unit
UPS 1KVA 16 Unit
Cantilever 16 Unit
Dak Cable 15mm 6 batang
Dinabold 12mm 14pcs

.Shelter Telkomsel

Proposed Power Proposer Rack

Ruang ICT

Proposed Rack Proposed Power

Ruang Maintenance
Proposed Rack Proposed Power

Ruang Warehouse

Proposed Rack Proposed Power

Fire Fighter

Proposed Penempatan Rack Walmound Proposed Power


Jalur Cable power Melewati Plafond

Ruang Klinik

Proposed Rack Walmound Proposed Power

Ruang VIP

Proposed Penempatan Rack Walmound Proposed Power


Jalur Cable Melewati Plafound

Ruang PDC Rechoule

Penempatan Rack Walmound Proposed Powe

Ruang Acom A

Proposed Rack Proposed Power

Ruang PFO
Proposed Rack Walmound Proposed power

Ruang Project

Proposed penempatan rack walmound Proposed power

Ruang Labotorium

Proposed Penempatan rack walmound Proposed power

Ruang PG
Proposed Rack Proposed Power

IBS Bayung Lencir

Shelter Kosong Tidak Ada suplay power PLN sudah di putus

Tampak depan shelter

IBS Pande arang


Shelter Kosong sudah d dismantle Tidak ada Suplay power PLN sudah di putus