BRIDGE DESIGN
CREEP EFFECTS ON
PHASED
CONSTRUCTION
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
0 1 2 3 4
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
8 Creep effects on phased construction 3/19
0.3m
6m 0.4m 2.4m
1 85m
1.85
0.25m
6.8m
A = 0.3
0 3 ⋅12 + 2 ⋅ 0.4
0 4 ⋅1.85
1 85 + 0.25
0 25 ⋅ 6.8
6 8 = 3.6
3 6 + 1.48
1 48 + 1.7
1 7 = 6.78
6 78m 2
u = 2 ⋅ (12 + 2.4 ) + (1.85 + 6 ) = 28.8 + 7.85 = 36.7 m
2 Ac 2 ⋅ 6.78
6 78 g = γ ⋅ Ac = 25 ⋅ 6.78 = 170kN / m
= = 0.369m = 369mm
u 36.7
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
Construction phases
1 t=0d
1. t 0d Sim ltaneo s conc
Simultaneous concreting
eting of the fo
four spans
2. t=28d Scaffolding removal – self weight action on simply
supported beam scheme
3. t=30d Concreting of key 1
4. t=45d Concreting of key 2
5. t=60d Concreting of key 3
0 1 2 3 4
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
8 Creep effects on phased construction 5/19
Scheme 1 30d<t<45d
0 1 2 3 4
Scheme 2 45d<t<60d
0 1 2 3 4
Scheme 3 60d<t
0 1 2 3 4
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
Calculation procedure
1 Sol
1. Solve
e each of the schemes seen abo
above
e elasticall
elastically and e
evaluate
al ate
continuity bending moments.
2. Evaluate the functions α j ( z) that show the influence of the restraint j
on the previous i:1,j-1.
3. Evaluate the functions ξ (t , t1 , t0 ) with respect to section dimensions,
relative humidity and time (e.g.
(e g they are given in graphical form in
CEB fib bulletins)
4. Apply 5th principle of linear viscoelasticity
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
8 Creep effects on phased construction 7/19
0 1 2 3 4
Scheme 1
gl 2
M el (1)
1 =− M 2el (1) = 0 M 3el (1) = 0
8
0 1 2 3 4
Scheme 2 gl 2 gl 2
M el (2)
1 =− M el (2)
2 =− M 3el (2) = 0
10 10
0 1 2 3 4
Scheme 3
3gl 2 2 gl 2 3 gl 2
M el (3)
1 =− M el (3)
2 =− M el (3)
3 =−
28 28 28
0 1 2 3 4
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
8 Creep effects on phased construction 9/19
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
2 Evaluation of functions α j ( z )
2.
The functions α j ( z) are the internal actions (for us only bending moment for sake
of simplicity) calculated on the static scheme j-1 (the one previous to the
introduction of the delayed restraint j) by the effect of the reaction given by the
delayed restraint j set equal to unit.
Our restraint are hinges that becomes full restraints so the “reactions” are
bending moments.
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
8 Creep effects on phased construction 11/19
Evaluation of functions α j ( z )
Restraint 1 on scheme 0
0 1 M1 = 1 2 3 4
1 α1 ( z ) α1,1 = 1
Restraint 2 on scheme 1
0 1 2 M2 =1 3 4
−1
4 α 2 ( z) 1
α1,2 = − 1 4 α 2,2 = 1
Restraint 3 on scheme 2
0 1 1 2 3 M3 = 1 4
15
−4
15 α3 ( z) 1
α1,3 =1
15
α 2,3 =−4
15
α 3,3 = 1
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
t
3 Evaluation of functions
3. ξ (t , t1 , t0 ) = ∫ R(t ,τ )dJ (τ , t0 )
t1
RH % = 50 f ck = 40 MPa t0 = 28 days
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
8 Creep effects on phased construction 13/19
t
Evaluation of functions ξ (t , t1 , t0 ) = ∫ t R(t ,τ )dJ (τ , t0 )
1
RH % = 50 f ck = 40 MPa t0 = 28 days
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
Phase 1 M =0 ∀z
3 gl 2
M3 = M el (3)
3 ⋅ ξ (∞, 60, 28) = − ⋅ 0.63
28
M 2 = M 2el (2) ⋅ ξ (∞, 45, 28) + α 2,3 ⋅ M 3el (3) ⋅ ξ (∞, 60, 28) =
gl 2 4 3 gl 2
=− ⋅ 0.68 + ⋅ ⋅ 0.63
10 15 28
M 1 = M 1el (1) ⋅ ξ (∞,30, 28) + α1,2 ⋅ M 2el (2) ⋅ ξ (∞, 45, 28) + α1,3 ⋅ M 3el (3) ⋅ ξ (∞, 60, 28) =
gl 2 1 gl 2 1 3 gl 2
=− ⋅ 0.76 + ⋅ ⋅ 0.68 − ⋅ ⋅ 0.63
8 4 10 15 28
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
8 Creep effects on phased construction 17/19
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”
8 Creep effects on phased construction 19/19
Politecnico di Torino
Department of structural and geotechnical engineering
“Bridge design”