04-21-23

AQUA BOO
VAL. CITY

SEPTEC VAULT OVERFLOW CHAMBER CONSTRUCTION AND ADDITIONAL WATER CLOSET

BILL OF MATERIALS AND CHARGES;


100 PCS CHB #4 1,350
18 BAGS CEMENT 6,210
35 SACKS SCREEN SAND 1,575
14 SACKS FINE SAND 910
17 LENGTHS DEF .BAR #10 4,012
1 KL. TIE WIRE 70
1 PC PLYWOOD ¼ 380
10 PCS WOOD LUMBER 2X2X6 1,100
½ KL.COM.NAIL #1 45
1 LENGTH PPR PIPE 20MM 380
1 PC FEMALE ELBOW 20X1/2 150
1 PC GI TEE ½ 28
1 PC NIPPLE 1/2X1 78
1 PC MALE ADAPTER 20X1/2 150
3 PCS EQUAL ELBOW 20MM 51
2 PCS SANITARY TEE 4” 356
1 PC CLEAN-OUT 4” 85
1 LENGTH PVC PIPE 4” S-1000 768
1 CAN SOLVENT 200CC 110
2 PCS PVC ELBOW 4X90 440
1 PC BOWL WAX/TOX/SCREW 350
1 PC SELECON CLEAR 250
18,848
CHARGE:
EXCAVATION/ CONSTRUCTION/INSTALLATION 24,000
42,848

RANULFO C. CAPISTRANO
INSTALLER
09061384580/09075919536