Document Tite: ‘TA Permit to Work Procedure
Document Numb MD-O4-MT-TAR-PD.036
Owner: TA Manager
Revision Number: cy
Effective Date: 18 November 2022
‘CONFIDENTIALITY
‘The nfrmaton contained in tis documents coniertal to Noh Son Refinery & Petochemical Liitod
LUnbity Company (NSRP) Acsorangl, copyright for this document i retained wih NSRP and. no
copying In any format of ths document fa permed wihout the writen permisson fom NSRP
Management
Prepared By
Reuiowea By
Reviewes by
Reviewes By
Reviews By
Reviewed By
Tar Jacaues be a
%, ‘Tilelbvsion Manager, HSSEBS Divison
‘Approved By. Akin —
Samet Le Nayen Quoc Vn
Tile: Retnery General Manager (RGM)
"These signatures apply tent document
Document No MDOLUT-TAR-PO-094 Te: TAParmitto Work Procedure
Date {sthnlovember 2022" ‘Rev.No00 age of 28NGHSON REFRIERY AND PETROCHEMICAL ULC
v CONG TY TMH LOC HOA PAUNGH SON
ste
AMENDMENT TABLE FORM
Rev. or Prepared | Reviewed | Approved
Ret | ate | Desert e Ke i
00 | 15.11.22 | Fist Release ‘leash T, [NH Due | Mr. Vinn
os
“TA Permit o Werk Provedure
Document No:a0-4aNT-TARPO.034 Te
Rev.No 00, age 20f28INGH SON REFWIERY AND PEIRCCHEMCALLLC
v CONG TV TNHH LOC HOA DAUNGHI SON
us
AMENDMENT REPORT FORM
Rev.
Hom Original Revised Reason
No.
a
“Tide: TA Permit to Work Prozedur
Effective Datet5" November 2022, Rev. No 00Nos EOH NERY AND PEROCHEICALLLC
v CONG TY WH LOC HOA DAU NGHISON
Contents
4. Introduction
2 Purpose.
3 Scope
3.1. Non-PTW required activites:
4°” Abbreviations and Definitions,
4.1 Abbreviations.
42. Definitions
5 Reference Docume:
6 Responsibilities
6.1. HSSE Division
6.1 TAHSSE Lead.
8.12 TAHSSE Officer.
6.2. Maintenance Division
621 TAManager
622 — TAExecution Manager.
62.3 TA Area Manager and Deputy Area Manager.
624 TADiscipline Lead Supervisor.
6.3. Operation Division.
6.3.1 Operation PTW Coordinator.
632 Authorized Gas Tester:
6.4. GMC Management.
64.1 GMC HSE Manager
642 PTWRequestor.
843 GMC PTW Coordinator
64.4 Task Supervisor
645 _ Foreman.
7_ PTWForms and Templates:
7.1 Safety Certificate
72 Isolation / De-solation Certificate
73 Electrical Cerificate / Electrical Permit.
74 Standard Control Sheets (SCS)
7.5 Job Safety Analysis (JSA)
78 LMRA
7.7 Safe Work Wethod Statement (SWMS).
78 Pro- Forma Amendment Sheet.
79 START Card,
7.10 Deviation Form
7.11 Gonfined Space Entry Certificate
712 Ventilation Plan
7.13. Rescue Plan
8 Guidelines for TA PTW Management.
8.1. TAPTWmanagement during normal operation condition Pre-TA and Post-TA)...
82 TAPTWmanagement during Turnaround execution:
9 Tumaround Permit to Work Clustering,
9.1 Type of PTW Clustering
9.1.1 Horizontal Clustering
9.12 Vertical Clustering
as
Document No:MO-oLT-TAR-PD434 Tile: TA Permit to Werk Procedure
Effective Date" November 2022, Rev. No. 00, Page 4 of28
6
8
6
8
7
7
8
8
9
9
8
9
8
9
9
9NSH SON FETNERY AND PEROCHOMCALLIC
) (CONG TY INHH|LOC HOA DAUNGHI SON
im
04.3 Hot Work Clustering
91.4 Blinding / De-binding Clustering
10. Workforce Ratio and Permit to Work...
40.1. Workforee ratio for Low and Medium Risk PTW.
40.2. Workforce Ratio for High-Risk PTW.
41 SIMOPS or Conflicting Activities
12. Permit to Work Proc
12.1. PTW Workflow and actions.
12.2 Permit Re-Validation Process
123 PTWLifetime.
124 Gas Testing
42.5 Work Suspension.
42.6 Permit Closure.
43. Other PTW Conditions:...
13.1. Permit Amendment
43.2. New discovery work or urgent work.
13.3 Transfer of Responsibility.
43.4 Lost PTW Damaged PTW.
135 Archive Permit.
14 PrwAudits
45 PTW Deviations
46 Forms:
Neen EEE
Document No:MOOLUT-AR-PO494 Tie: TA Permit to Work Procedure
Effective Date8" November 2022, Rev. No. 00, Page 5 of 20CONG TY TNHH LOC HOA DAUNGHI SON
ser
4) Introduetion
Permit To Work (PTV) System Is a formal written system used to control the Tumaround scope
‘of works which are not enclosed by normal operations Permit to Work System and Operation
Procedures. Permit To Work documents are a means of communication and written agreement
‘between PTW authors and execution parte.
“The Turnaround Perit to Work procedure Is legal and mandatory requirement to be complied
by all company and contractor employees curing the period of turnaround execution phase. PTW
procectre isnot act as a final baer, it helps to minimize / eliminate the risk and hazard during the
‘Th execution phase
‘All pates volved in the permit to work conditions have responsible to assuring the safety of
‘employee, environment, and assets during the implementation of the Turnaround PTW system.
2 Purpose
‘The cbjecve of this procedure ie to streamline the permiting process during Turarounds
without compromising the safely of our workforce and to improve efcancy as well s to provide the
‘guidance o assure the tunaround scope of works are commenced with compllance of TA Permit to
\iork requirements based on the approvals from authorized partes,
3 Scope
‘This Tumaround PTW Procedure applies tothe locations where the area Is declared under
tuaround execution phase
Normal Operation Permit to Work procedure MD-04-HSE-HS-PD-008 shall 9e applicable forthe
following work scopes
+ GAC work scape during the period of Pre and Post Turnaround
+ GMC Work activites in Operation Sections § and 6 with some PTW deviations
herein
+ GMC work in inter-connecting piping
1+ Non-TA activites ouside the plant ares,
+ TA work acites (Le: maintenance routine works; works by other contractors not relevant
to GMCs) in the TA-execution declared areas (TA Area Manager to be consulted and
fgree fo the activity by Intilng te wark inthe TA look sited pan),
3.4. Non-PTW required activites:
‘+ Any of the operational / maintenance actvty performed under approved standard
procedure or work instructions
‘+ Any of the emergency reepense actity performed under the insruction of On Scene
Commander (080)
Document No:atD-44arT-TAR.POo34
Effective Datet5 November 2022NGI SON FREY AND PEROCHEMICALLIC
v CONG TY INHH LOC HOA DAU NGHI SON
1+ Any of the visual inspection actly In the process unit (except Inside confined
space)
1+ Any of the vehicle's movement outside of the process area or tank area which
includes the transportation of materials, portable water supply and sewage collection
from a portable tlt, ete. However, permit to work shall be apalicable for loading /
offleading by means of iting equipment
+The Below listed activi: in at TA Execution declared areas (VC Free, compliance
with TA Gas Testing requirements:
Ay activity inthe site temporary offices and facies tke deaning, repair work
with hand fools, manual handling etc. However, PTW shall be applicable forthe
‘maintenance activi that requis power tools and ater equipment.
Ratios inside temporary workshops inside plant area during TA execution
phase, GNC to dovelop general safety guidelines and shall be approved by
Operations, TA, and HSE.
Nomintinsically safe mabilly equipment such es mobile phones, cameras,
thermal guns, clamp meter, llumination meter, noise met, wind speed meter
and others, whieh are nat directly n contact or coneced with any of the
process system or process equipment. Al non-iS mobity equipment shall
Fequre inspection stickers and other permissions as approved by NSRP.
Note: Non-intnsically mobilly equipment shall not be allowed where there is @
potential presence of hydrocarbons and flammable gases (BL of process unt;
Seaton & and Section 6 Areas). The use of non-lS equisment shall only be
Iited to GMC's, from Projet Managers down to Lead Supervisors evel
4. Abbroviations and Definitions.
41. Abbreviatons
[RSSEES | Health Safety Secariy Environment & Social
PW Pesto Work
TAPTW "Tumaround Permit to Work
xy “ob Satay Analysis
‘START ‘Salty Task Analysis Risk Talk
SIMOPS ‘Simultaneous Operations:
flora oe aa Tae Ou
“SwS ‘Safe Work Method Statement
CSE ‘Confined Space Entiy
PPE Personal Proteave Equipment
eee IEEE
Document No.uD-DLIT-TARPD.34 Tit: TA Permit to Work Procedure
Effective Date" November 2022, Rov. No. 00. Page 7 of 28‘CONG TY TNHH LOC HOA DAU NGHI SON
INGSEN EPR AND FERCCHEMICALLIC
>
P ‘Standard Procedure
SV ‘Operation Dison’s Shit Supervisor
ERT Emergency Response Tearh
TRA ast Minute isk Assessment al
CHE ‘General Mecharieal Contractor
42 Defnitons
Tew DEFINITION.
‘MC ‘An organization or individual hat provides @ sence to NSRP ih a contractual
‘tution with NSRP.
Hd Pot iol points are “reminds” to Task Supervisor or PTW Ravalidator regarding
‘mandatory safety checks in the SWMS following requirements of the PTW
prior or during execution of works.
Conkadior | An organization ornevidual that provides a service to NSRP in a contractual
‘uation with NSRP.
5 Reference Documents
‘+ MD-04-HSE-HS-PD-003: Permit to Work Procedure
7 MD-04-HSE-HS-PL-002: Workers Occupational Health and Safety Management
Plan
= MD-04-HSE-HS-PL-001: Hazardous Materials Management Plen
7 MD-O4-HSE-HS-PD.022: Hazard Identification, Risk Management & Control
Procedure
+ MD-D4-HSE-HS-PD.004: Job Safety Analysis & Safe Work Method Statement
Procedure
MD-04-HSE-HS-PD-008: START (Safety Task Analysis Risk Talk) Procedure
MD-04-HSE-HS-PD-015: HSSEBS Instructions to Contractors
MD-04-HSE-HS-PD-001: Personal Protective Equipment Management Procedure
MD-04-MT-PD-108: Excavation Procedures
MD-04-HSE-HS-PD-041: Working at Height Procedures.
MD-04-HSE-HS-PD-029: Confined Space Entry Procedure
MD-04-HSE-HS-PD-020: Radiography Procedure
MD-04-HSE-HS-PD.006: HSSE&S Training Procedure
MD-04-MIT-PD-104: iting & Rigging Operation HSE Procedure
MD-04-HSE-HS-PD-612: Lock-out and Tag-out Procedure
MD-04-HSE-HS-PD-042: Electrical Safety Procedure
MD-04-MT-PD-100: Scatfolding Procedure
MD-O4HSE-HS-PD-O19: Safely Signs, Barricades, Labals management
Procedure
MD-04-HSE-HS-PD-002: Tools and Portable Equipment Procedure
IMD-04-MT-PD-103: Work over Water Procedure
MD-04-MT-PD-101: Mobile Equipment & Heavy Equipment Procedure
MD-04-HSE-HS-PD.018: Hazardous gas safely management Procedure
ae”””'‘*k OSS Oo
Document No:MO-oLUT-AR-7O94 ‘Tile: TA Parmit fo Work Procedure
Effective Date" November 2022, Rev. No. 00, Page 8 of28‘CONG TY TNHH LOC HOA DAU NGHI SON
NGHSON RE RERY AND PEROCHEMCAL LIC
1+ MO-04-HSE-HS-PD-048: Hot Work Safety Procedure
+ MD-04-HSE-HS-PD-014: HSE Non-Compliance Control Procecure
+ MO-04-HSE-HS-PD-027: Safely Golden Rules
+ MD-04-HHR-RL-002: Disciplinary Regulations
5 Responsibilities
TA PTW shall follow the Normal Operations PTW Procedure Roles and
Roopencibiitise, Additional rolee are identified below that are involved in the TA PTW
system.
6.4 HSE Division
G44 TAHSSE Load
‘The TA HSSE Lead is responsible for,
* Reviewing this procedure,
+ Eneuree that routine PTW inspections and site audit is carried out and
recommends improvement (f required)
Ensures that this PTW Procedure is properly complied with
* Endorse High Risk PTW and JSA
* Assign Area Safely Personnel for PTW review, endorsement and support the PTW
process,
+ Coordinate wth TA management for addressing the PTW constraints.
64.2 TAHSSE officer
‘The TA HSSE Officer is assigned to each TA Area and responsibis for:
* Review and endorse Low and Medium Risk JSA.
* Ensures that routine PTW inspections and site auclt is carved out during TA
‘execution works and recommends improvement (i required).
+ Ensures that this PTW Procedure is properly complied with.
62. Maintenance Division
6.21 TAManager
* Reviewing this procedure,
+ Ensure plan and procedure are implemented
* To ensure euffcient and competent personnel to review the PTW documentations
USA, SWIMS, Cerificate, plans, checklist etc.) prepared by GMC.
62.2 TA Execution Manag
* Ensure plan and procedure are implemented
1 Ensure that the work execution is implomented safely.
+ Ensure sufficient and competent personnel for ste supervision.
6.2.3. TA Area Manager and Deputy Area Manager
* Organize team for reviewing and approving the SWMS and JSA
* Leadership to evaluate and accepting the necessary documents of the PTW.
* Review all PTWs assign under clustering strategy of PTW
a
Document No:MD-24AT-TAR-PD-024 Tile: TA Permit to Work Procedure
effective Dates" Novembor 2022, Rev. No. OD.
Page 9 of 2863
CONG TY TNHH LOC HOA DAUNGHI SON
NEMISON RFNERY AN PETROCHEMICAL UC
= Ensuring the PTW conditions are strictly complied for the TA scope execution.
+ Communicate the TA lookahead revalidation plan to execution sams,
7 Withdrawal or suspension of PTW due to actual conflicting works,
+ Acknowledge the update in the Pro forma Amendment sheet
1 Priotize and rearrange work where co-acivity clashes are a concern.
{Assign competent personnel to sign on the PTWas ‘Discipline Owner’.
6.24 TADiscipline Lead Supervisor
NORP TA Discipline Lead Suporvicorehall
+ Liaise with respective GMC PTW Coordinator or PTW Reques.or and ensure the
PTWie intended forthe identified work pack.
+ Ensure thatthe Risk Level of the PTW, SWMS and JSA are identified.
1 Enforcement of supervision and monitoring plan and schedule for TA execution
‘compliance.
Operation Division
63.4 Operation PTW Coordinator
'An Operations personnel who is appointed by the Operation Section Manat
te:
+ Check and ensure the completeness of the overall content of the PTW packages.
Maintains, updates, and’ register incoming PTWS in the PTW Register
(spreadsheet
+ Maintains the list_of NSRP. and Contractor PTW Requestors and Task
Supervisors. The list wil include specimen signatures,
= Coordinates the scheduling & priorities of turnaround tasks,
+ Liaise with GMC PTW coordinator during the stage of PTW submission and
approval
+ Coordinate PTW submission plan for operation section's review and approval
* Tlage with PTW Requestor and PTW Issuer for PTW clustering as per the
‘approved clustering strategy.
= Eneuring the Pro Forma Amendment sheet is attached with PTW and notified in
the PTW template comment box
+ Collect approved PTW trom PTW Issuer/ Approver
‘Maintain a ist clustered PTWs assigned for each Task Supervisor.
7 Arrange PTW at the field PTW office as per day-to-day revalidation schedule (TA
lookahead plan.
+ Confitm the yellow copy of the PTW is available in the Site PTW Office when a
PTW Is going out for revalidation.
+ Collect the pink copy of the PTW from the PTW Revalidator, keep the pink and
yellow copy together in the Site PTW Office.
+ Gummariee the numbor of PTW revalidated and display information in the Site
PTW office
+ Generate the day-to-day PTW revalidation, close out status report for
management reporting,
+ Store the closed out PTWS as per procedure requirement
6.2.2 Authorized Gas Tester
= Condut the required gas testing requlrements prior to validation and recording
(900 test resus on gas test record sheet.
Document No: MDQLMT-AR-PO-34 Tle: TA Permit to Work Procedure
Effective Dates November 2022, Rov. No. 00, Page 10 of 28CONG TY TNHH LOC HOA DAL NGHI SON
Gite Management
644 GMC HSE Manager
‘The GMC Health & Safety Manager is responsile to:
+ Ensure plans and procedures are implemented.
{Ensure that prior planned and scheduled PTW compliance evaluation; safety
‘campaign, safety ste supervision, site inspection, safety walkaround, PTW aut.
1 Enuoree Pigh sk JA
+ Make report for observations and audit finds to share to turnaround teams
* Identiy the root causes of repeated violation and follow up the recommendations:
6.4.2 PTWRequestor
‘A Contractor peronnel who is nominated by the GMC management
ho shall go through the competency assessment / interview by NSRP TA
‘Area Management.
= The PTW Requestor isthe person who iniates the permit-to-work preparation.
+ The PTW Requestor shall Be a person who represents the work controling group
(applicant group) and can be nominated from GMC staff or authorized
contractor's personnel,
= The PTW Requestor is responsible to visit and inspect the worksite at the
planning stage together with the respective tumaround person to identify worksite
hazards associates with completing the task as described on the PTW.
= Conduct hazard identification and risk assessment to de-ermine mitigation
measures and precautions required in preparation ofthe JSA.
= Eneure that the PTW have the required documents attached,
‘Ensure PTW screening completed by relevant GMC Manager & HSE Manager
before submission
* Prepare the supporting documentation and get approval from the respective
authorky.
+ PTW Requestor can also be the Task Supervisor.
6.43 GMC PTW Coordinator
‘A Contractor personnel who is nominated by the GMC management wh shall go
through the competency assessment interview by relevant NSRP TA Area
Management and HSSE.
olehe shal
#Be able to communicate, read and understand the English language.
+ Collect PTW package from the PTW Requestor.
1 Be able to identify the hazard and control measures-related tc the description of
work.
+ Be familar with the hazards of each activity in the PTW Certificate.
{Ensure the PTW preparation progress comply as per the TA PTW preparation
plan,
+ Conduct PTW quality check ofthe relevant documentation before registration.
SS
Document No:MO-D44T-TARPD06 Tit: TA Permit to Work Procedure
Effective Dates" November 2022, Rov. No: OD Page 11 of 286 CONG TY INHH LOC HOA DAU NGHI SON
+ Organize PTW package, ensuring the information is accurate in the TA PTW
register provided from NSRP.
‘+ Submit PTW to NSRP Operations PTW Coordinator for review and approval
Coordinate urgent / addtional support to the Task Supervisor ‘or additional PTW
requirement in agreement with Issuing / approving authority
= Communicate the changes in the PTW to the NSRP PTW Coordinator and give
Update to PTW Requestor.
GAA Task Supervisor
‘The Task Supervicor is a person nominated by the GMC management who shall go
through competency assessment / interview by NSRP TA Area Management.
Helshe Is permitted to accept more than one PTW at a time as per the Clustering
strategy as per Permit and TS workforce ratio.
‘The Task Supervisor shall
Be able to communicate, read and understand the English langage.
+ Have detailed knowledge of the activity being supervised and tre related hazards
& miigation from the. provided PTW conditions, SWMS, JSA, Pro forma
‘amendment sheet, SCS and LMRA and other relevant information like SDS,
‘suppliers instruction ot.
+ Conduct pre-revaldation checks with operations (Zero Energy, IDC confirmation,
LOTO keys are secured, et.)
+ Accept PTWs, conducts START meeting before the work commences, and
identfies any additional hazards and controls in the LMR.
+ Ensure that al personnel understand the hazards, mitigation, and their roles in
the safe execution & completion ofthe actviy.
+ Ensure that all requirements in the PTW are complied with prior to starting the
\work and that they ave maintained throughout the duration of the activity
‘Stop work when conditions change or in the event of an emergency.
Display the PTW in a prominent position at the work location.
‘Suspend the PTW at the end of shit and reports the status ofthe activity to the
PTW Re-Valiator.
‘Suspend and sign off the PTW when DFT required and resume the job ifthe PTW
's revalidated again.
+ Revaldate the PTW after an emergency.
Assigns and manage approved Foremen for clustered PTW management and
Clustering different aiscipline's work scope
1 Ensure the assigned foremen effectively and safely managing the work.
Foreman Delegation
"The Task Supervisor is allowed to nominate an approved Foreman from the work.
party once initial sign-on in the PTW and LMRA has been carried out. The
fominated Foreman must have received ihe PTW Training and must be accepted
by the NSRP TA Area Management. The nominated Foreman is then responsible
10 be present at the work location to supervise job execution under a particular
pormit‘or clustered work diselpline work activity. The maximum workforce allowed
Under Foreman ie 12.
6.4.5 Foreman
= Responsible for 100% presence at work site and supervision of the work crew.
Nee EE
Document No:NO- & 1D.
10 Workforce Ratio and Permit to Work
“Tis Isto ensure effective supervision of task supervisor's and task foremen wrkload within
the limitation of physleal montering and presents at work location,
410.1 Workforce ratio for Low and Medium-Risk PTW
+ One Task Superisoris permitted to accept § PTW ata time.
* Task Supervisor can assign a Foreman at each work location with maximum number
of 12 workforce,
oo
No:wD-a4AIT-TARPO.094 Tile: TA Permit to Work Procedure
jS* Noverber2022° Rev. Nox 00,
Page 17 of 28v CONG TY TH LOC HOA DAUNGHI SON
‘The folowing conditions must apply to this rule.
+All actives must be geographically located in the proximity of 50 meters in all
rection within one process area,
Each activity under a PTW must always have a Foreman present zt the location.
'+ Work must be stopped when Foreman leaves the work location.
1 Activites can be cari out on different systems (e.g, 2 NRV's ina steam system +
INRVS na process system).
10.2. Workforce Ratio for High-Risk PTW
+ One Task Supervisors permitted to accept 2 PTW at atime witha combination of 1
High-Risk and 1 Low or Medium-Risk activity.
‘+ Task Supervisor shall be present at the High-Risk work location with @ maximum
‘numberof 12 workforce,
‘Task Supervisor must assign a Foreman at Low or Medium-Risk work location with
‘a maximum numberof 12 workforce,
“The following conditions must apply to this rule:
+ All activities must be geographically located in the proximity of 60 meters in all
‘ection within one process area.
+ Task Supervisor must transfer the responsibilty to another suponisor ofthe same
dscipina when helshe leaves the High-Risk activity work location, The outgoing
‘Task Supervisor wil sign-off Inthe PTW (Suspend the work). The Incoming Task
Supervisor shall folow the PTW Revalidation process (including START Meeting)
before continuing the work activity
"Assigned Foreman shall be always present atthe Low / Medium ~Risk location,
‘+ Task Supervisor shall assign another Foreman of the same ditciptine when the
current Foreman leaves the work location.
+ Work must be stopped when Foreman leaves the work location unsupervised.
414. SIMOPS oF Conflicting Activities
For conficting actviies during Tumaround phase, the Area Manager shall identity the
‘confitng activites and the work is planned in the TA look-abead plan, and PTW to be
Issued inthe specie date an time.
+ For identified conflicting activites, a jalnt ste check to be conducted by Task
Stperisar and Permit Revaliator othe respective scope of work
+ TA Discialine Lead Supervisor, PTW Revaldator and Task Supervisor to evaluate
the status ofthe PTW revaidated at that conficing activity location.
Discuss and confirm the co-actvty by TA Area Manager, Panner and PTW
Coordinator
+ The Last-Minute Risk Assessment to be conducted by PTW Revalidator and Task
‘Supervisr forthe conflicting activities atthe work location.
+ PTW Revaldator and Task Supervisor Is responsible in ensuring the mitigation plan
Document No:MO-ALAT-TARPO434 Title: TA Porm to Work Procedure
Effective Dates" Novembar2022, Rov. No. OD. Pago 18 of 8CONG TY TWH L9C HOA DAU NGHI SON
ar
|sn place forthe safe execution ofthe confitng activites,
CCo- signature shal be obtained from the other affected Area Owners when required,
42 Permit to Work Process
+ PTWpreparations willbe based on the approved work packs inthe Roser System.
+ AIPTWs forthe TA execution shall be prepared in advanced prior to TA Execution
Phaze flowing the agroed milestone plan,
= TAPTWe for dlscovery work shal flow the "urgent PTW" process
121 PTW Workflow and actions
‘Qu rw Regantor tom work xeon ten sa
2. Calc PW reat canes rom GMC Hang team for oer
Sete
2. Gide centro pe
eine Completeness {HCPT conrahtortat
‘rma 1. Up nomatian nthe TAFT ane rate
aa 2. Checeampiturese! he FI la
Soi re forts 2 ern reed rn PT Reuse covet
‘Sib ingen onendorsemet yA? Ae Cpe ent
‘hendovement —
rventen a 1S iS oAs eino
eeepc apg Oe ape
eo nun iw wrt is rh wars.
ee Fear roe 1 ian wsGMCTW Cora arecton
soanens fr ene Operation rv Corto e-TA/ TA Boar / PORTAL
eee 2 trae cer stags we ahowed
4 limite rr tonthoraed sro lant Operon Seton
‘feted MW 9 GM PTW ornare.
ee
TA Pormitto Work Procedure
Rev, No: OD. age 19 of 28INGE SON TE NERY AND FERECHEMCALLIC
v CONC TY mH L9¢ Hok DAUNGH SON
as
“Laevew PW page
ra 2 enya ted a mig,
{Lrg ro anaftnwltan areste (2)
4 Eee ition pos atest oy
Etre sen improement ecard eer upitee by PT.
Tegutor nthe ares arena set sh.
{enna Ptr apple arene
a Sea eee
Rew prove Pw opener
" Enure at core /stpurs alton ete ue owing
2. bee il pprorf tne 1 lage
“Chena rn Mae rein ewan
ss Handbackapprved it Opens PW Co dtr
‘pean PH aor (eA)
conc spree TM orn PT pie
pani
erie) (REESE wom npr
Patios reat, ne a
mma) (rome aeenne )
2. nye einen pcs ead
net the il as tases pln aid oot
oan yaa vrata er eter pn
nay meer
A See ee
saan (RA) "crc a ton
rts be acordeaoy
A
Doumeatagecnranrasy fasta hte Won rexaue
pamemnamtnanrnas Rach a(CONG TY TNHH LOC HOA DAUNGHI SON
:
1 "canara ate che together wth PW eat
eadand understand he 1 conn arsed AS, 4
‘enya poten hs conta manne
‘afm he lton neering eemertton
Operatnsaopy ersona dock ant LTO bo, where ene
‘townie codon nd ign one rset, Ses
sre hoon caer
‘Sigur an eqred 4a pra elation lan
‘pate hanover
‘Gincou stat nating th eestor ad freak
{Ere hound carton bebe PW le
Ee ra pas Toa
very hob compen an hoses at
2 conte Destin reeset fom)
2 hep ote trot PW coo
2th Pate Oe,
Sl cine the
[i
42.2 Permit Re-Validation Process
‘= PTWrevalidation shall be coquired before start of each work shit and fllowing
noemal operations PTW Procedure, MD-04-HSE-HS-PD-003: Permit to Work
Procedure
+ PTWRe-vaidation for Radiography Works.
‘+ For radiography works during break ime, PTW shall be revadated a least
‘hour to give way to sie preparation works. Upon competion of the RT
Shooting. the PTW shall be slgned-of a8 suspended to clve way for the
resumption of other activites.
“+ For radlography works during working time, prior to revaldatng the RT PTW,
‘al other actuties within the exclusion zane shal be put on hold to give way
fo the RT shooting, The affected activites that were put on hald can resume
fer completion of RT actives. (PTW Revalldator Shall keep Ure PTW of
“on-hold" acviios during RT shooting)
423 PTW Lifetime
'+ The PTW ifm for al type of work extends up to the completion of the work
(apalies to all Operation Sections during TA Execution)
+ The Safety Certificate validity coincides withthe PTW valy
Document No:MDOLT-TAR-POGD4 ‘Tile: TA Permit to Work Procodue
fective Date18" November 2022, Rev. No. 00 age 24 of 26CONG TY TNHH LOC HOA DAU NGHI SON
NOMS ENE AND PETROCHEMICAL UC
ar
‘+ PTW revalidation extension sheet shal be utlzed after the revalidation column
in the main PTW form Is exhausted
‘+ The PTW Revaldator and Task Supervisor shall ensure that al safety controls
are ailn place & thatthe actvty ean be continued safely.
124 Gas Testing
Gas testing Is required for:
+ Work invohing naked flame e.c., welding, grinding. heat stink blowers or
lect eile n hazardous areas
Work involving spark potential Le., dry git blasting, opening lve electrical
Junetion boxes ln hazardous areas.
Confined space enty.
* Where identified as @ special precaution inthe JSA,
Note:
1 Gas testing Is not required for cold wotk, unless specified In the PTW andlor
Safety Cerificate,
The PTW Issuer specifies:
When Gas is test required
1 The Gases to be measured. (Use Additional Requirementsifermation Section
ofthe PTW)
The Frequency of testing. (Use Addtlonal Requirements/iformation Section of
the PTW)
When continuous gas monitoring is required at the worksite
Note:
Only Authorized Gas Testers (AGTs) may conduct gas tests
= Gas test result to be recorded inthe Gas Test Result Sheot & atached to PTW,
425 Work Suspension
+ To follow procedure. MID-04-HSE-HS-PD-003: Perit to Work Procedure
126 PermitClosure
"To follow procedure, MD-04-HSE-HS-PD-003: Perit to Werk Procedure
43. Other PTW Conditions:
434. Permit Amendment
+ Ifthe approved PTW is not rewaldated on the scheduled star dato, the PTW
Revalidator can amend the new start date and time with tsi her counter
signature
+ The only amendment allowed in the PTW template is the changes on the start
date. The PTW Revalidator ean amend by his! her counter signature.
ss
“Tio: TA Permit to Work Procedure
Rov. No. 00. Page 220128‘CONG TV TNHH LOC HOA DAUNGHI SON
=
‘Any changes in the SWMS and JSA can be added using the Pro-forma
‘amendment sheet which shall be prepared by PTW Rewuestor without
‘modivng the approved SWMIS and JSA. ISA can also be updated using LMRA
before PTW revalidation
When there is an unexpected/unavoidable change inthe actly or method, the
[PTW must be suspended fist, make amendments then infiate the PTW review
‘approval process. (Same as new PTW application).
1 The PTW Review Process is when changes & corectons can be made. No
change Is allowed afer PTWis approved.
+ Unauthorized PTW amendment automatically inva
fates the PTW.
18.2 New discovery work or urgent work
Fer any new activity not identified in the TA lookahead PTW, below are ist of actions to
be taken
1 PTW Requestor to inte the PTW package preparation.
+ PTWtobe endorsed by Turnaround team
PTW Requestor to personally meet the PTW Issuer and Approve for PTW
‘approv
"+ The Operation PTW Coordinator can add the actly in TA lookahead plan
‘agreed by TA Area Management
412.3 Transfer of Responsibility,
‘+ Transfer of Responsibility To follow normal operations PTW Procedure,
MD-04-HSE-HS-PD-003: Permit to Work Procedure
4134 Lost PTW/ Damaged PTW
In case missing or damaged PTW documentation happensd during TA
execution, a replacement PTW shall be applied by execution party as an
‘urgent permit the PTW Requestor shall submit the PTW for approval
43.5 Archive Permit
“The archiving period of closed hard copy of the PTW stored fer 90 days and
soft copy inthe Roser system shall be stored until the next turnaround.
14 PTW Audits
HSSES, Operation Maintenance and Tumaround shall have schedale and plan for
‘conducting daily PTW aude for ensuring the effectiveness of the PTW system in
teach Area and make recommendations fo improvement fan.
PTW audit evaluation are estegorized into three groups based on th level of PTW
‘compliance as described in the Normal Operations PTW Procedure,
48. PTW Deviations
Below information ae PTW deviations as agread by Operatons, TA and HSSE.
Neen ee EEE
Document No:MO-OLUT-AR-PD34 Tie: TA Permit to Work Procedure
ttctive Date18" November 2022 Rev. No. 00, Page 23 of 28¢
CONG TY INHH LOC HOA DAU NCH SON
=
Ne] DeserntonT nya Deviation astra | tenis | Sometionene
7] cero] Sige Vatve Sra witoa | Opwato |. Ra 1 Cad Work ate
reauemen | to re | Secon | tr opto a
tor cal ectina [tune | pete ne
‘Works ‘TAGs to be paostied te al) 4 (hydrocarbon the BL shall require
fn ‘pote an ot (ova lel ores
ered ne ‘elon oe
corto 2. Ponte | Saaton post The
Note: Va shut, and tap ae | ee a
‘are not required to be mae oe eae
a Cae eee
wae: ia
cay leon ewe teaser | ae a
avo ahh” tngghgce ae ce
todo me dees eae mare
eae = hon ae
an renal TA
Sige on a let tad of pa lake,
Stuer cnte oper TRGRING wb
van arto up Pa intr elon
oh reauroment
that be ly come oe
must include the valve 2 Cal Vink oy
‘number out of total valves ‘on Live System (PA;
(le: 1/10 ; 2/10; ---10/10) LPN; LPS) single
fod and TAGENG
— pit
for PSV remo! ob
‘tout ton lene
aime be common BCL
Uy elton x he means
of ester The coset
I
port thal be cone
at mmealer teas
Wert, “Tagpng” 8 Seo
tory chet cn be ave
Povo
2 | totaiontor| Seige Vane Sha wr Opewto |. Ful] Shale va
fat Wort | LOO cee | cortaminator | laton and LOTO
Ta se te teanay | 220% |S im | boson
Maamorarunemant Tia TA fame Work Proce
Perenasaameeanmnenas an Pee hottCONG TY TNHH LOC HOA DAUNGHI SON
str
Flame) | shall be conducted in| 1-4 | (hydrocarbon | 2. Venting location
‘accordance with | PTW free) shall be minimum 15,
requirements (JSA) meters away from
2. Positive | Hot Work locations.
Isolation at BL
for norutity | Note:
= HW that would result
3, Poste | to yarotet activity —
isolation for |- Posiive isolaion
preservation | shall be required,
systems are ir | and standard binds
place. shall be sed.
Isolation for | Apply closest valve ieolation | Operatio | Only apply for | Confim zero eneray
Hot Work | and LOTO Is requied A roroxio gas | and demonstrated to
Waked ‘Sections | and non: | Task Suparisor by
flame) for 586 | flammable Operations by
usiity 1 services. opening nearest
Non- drain vale and
hazardous pening vets.
service
(Steam,
Water,
Plant Air,
1, N2}.
Witness for | Ste inspection of PTW] All For Operation | 1. Winess for
Hot Work | Approver prior to Hot Work | Operatio | Sections 1-4: | commencement for
(Naked | shall not be required for Hot | n Apply tem #2. | HW PTW shall be
flame work) | Work Naked Flame Sections verifed by LFO
For Operation | (aq Fa
Sections 586; | Operator Issuer or
femal Higher.
Operations
Isolation 2, Full time witness
requirement for | (Field Operator)
hazardous | shall not be required
services ane | from Operators.
fontacriowe | 2) Aue
ae ‘walkerounds shall be
caried out by OPT /
TAI HSE to check
compiances of Hot
Werk actives.
Document No:Moa4arr-TARPOas6
Effective Datet5 November 2022,
“Te: TA Permit to Work Procedure
Rev. No: 00.
Page 25 of 28‘CONG TY TNHH LOC HOA DAU NGH! SON
“4. Comply with SCS
requirements,
First Line | Fist Line Break Checkist | Al
Breaking | shall not be required
Checklist | Section 1-4
for | Operatio
Sections
For Operations
Sections 1-4:
‘Fu
decontamination
of unt
(rydrocartoon
free)
2 Positive
isolation at BL
for non-ulty
streams
3. Positive
Isolation fo
preservation
systems are in
piace.
4.Normal
Zero. energy check
‘hall be conducted
‘and demonstrated to
“Task Supervisor one
by one.
First Line Broak
shall be replaced
by the Standard
Control Sheet
(SCS) for first line
break requirements
In Section 588
Operation
Isolation
requirement
applies.
Teolation | One PTW with multiple | All “Turnaround | Isolations for IR Test
‘and De- | isolation cerficates at | Operato | Window oF Cold Werk in one
isolation on | different locations which has | n process area shall
oc the same work method | Sections | (Feed-out 0 | sow multiple
‘statement and JSA such as erat isolation cartificates:
IR test, Cold Work Is IR Test and | to be canted out in
‘and desolation can
conducted one by
‘and do not require to ch
(corticate by certificate or
isolated location by isolated
location). It means that do
ot require to do isolate all
points before revalidation
be
fone PTW in which
Isolation and de
isolation canbe
caried out one by
Operations can
isolate multiple
Points at the same
Document No:Mpa4arT-AR P0036
Bective Date:t8" November 2022,
“Tide: TA Permit to Work Procedue
Rev. No: 00
age 26 of 28v CONG TY WHHLLOC HOA DAUNGHISON
PTW by contractor before time, normal practice
devisolation can be applied.
Using PSV | PSVs can bo used for Cold | Operatio | 1 Ful | Pre-conditons shall
without | Work isolations if isolation | n decontamination | be folowed.
Isolation | valves arenot avaiable. | Sections | of unt
valve 14 | (hydrocarbon
(oithout fr00)
deviation
foal 2 Postve
Isolation at BL
for nomutity
steams excont
flare header.
3. Positive
Isolaton for
preservation
systems. are in
place.
Teolation for | Apply double valve if there | Operatio | Zero energy | 1.Standard Control
Cold Work | is no bleed, ® confirmation a | Sheots (SCS) to
for Hot, Sections | nearest arain | be applied
titty tke | APPIY single valve isolation | 5.5 | valve and vent
Condensate | there is only single block fae 2.Do not stand inthe
eBRW and | valve. line of fre when
breaking
containment.
3.Use face shld
when breaking
containment.
‘Authorized | PTW Revalidator / Verifier /| All Tumaround | List of approved
Isolator! | Ieolator shall be a | Operato | Window PTW Revalidators;
Verifier | competent Operation | n Isolation Verifies
PTW personnel endorsed by | Sections | (Feed-out 0 | ang Authorized
Revalldator | Section Managers and Product ou) | jgolators shall be
‘minimum | approved by Operation DM. approved by
‘experience. ‘Operations Division
Manager.
FFT stand | Standby Rescuers not | All TTumaround | Contractor
byforcse | required in CSE actviies | Operatio | Execution Emergency Rescue
n Team to be
es
Document No.uD-ouMT-TAR-PD-O TA Permit o Work rocedtre
Effective Dates¥8" Novembor2022° Rev. No. 00
ye 27 of 28¢
(CONG TY TNHH LOC HOA DAU NGHI SON
Sections | Window strategically located
in the field uring
”
11, [Hot work | Hot work certificate not | Operatio | Tumaround | PTW revalidation
PTW for | required for vehicle entry | n Execution prior to vehicle entry
vehicle | into process area Sections | Window Into the process
‘entry Into 14 rea
{he process | NO_gas test required on
area. Pw
46. Forms:
Wo Code Name
MO-OHSEHS-PO-00G ADOT
MO-O&HSE-HS-PO-005-ADOZ
WOOF SEHE-PODIDIAKOOT
Turnaround PTW Pro Forma Amendment Shest
HOOF HSEHS-POD03-A008
“Turnaround Revalidation Extension Form
Document No:stQ-a4-NT-TAR-PDa34
Effective Dates9® November2022° Rev. No. 00.
“Tl: TA Permit to Work Procedure
Page 28 of 28