Professional Documents
Culture Documents
Enerwise - DeHeus Utility Monitoring Project - 032023
Enerwise - DeHeus Utility Monitoring Project - 032023
DEHEUS UTILITY
MONITORING
SYSTEM
Project Proposal
1|Page
PT. Intek Sinergi Global CONFIDENTIAL
Project Description:
Network Architecture
2|Page
PT. Intek Sinergi Global CONFIDENTIAL
3|Page
PT. Intek Sinergi Global CONFIDENTIAL
List of Instruments
No. Pabrik Gas Steam Power Meter
Existing Add on Existing Add on Existing 50A 100A 250A 400A 500A 600A 630A 800A 1000A 1500A 2000A 4000A Jumlah
1 Mojokerto 0 2 0 2 5 0 0 0 0 0 1 0 1 0 1 1 0 4
2 Bekasi 2 2 4 12 1 2 0 0 0 1 1 1 1 2 0 2 1 11
3 Cibinong 0 1 0 0 1 0 2 2 0 0 0 1 0 0 0 0 0 5
Total: 2 5 4 14 7 20
Mojokerto Plant:
Cibinong Plant:
4|Page
PT. Intek Sinergi Global CONFIDENTIAL
4 New 250 A ELECNOVA POWER ROOM wired
Bekasi Plant:
5|Page
PT. Intek Sinergi Global CONFIDENTIAL
CONTROL
3 Existing ABB DRIER & BOILER ROOM wireless
ROOM
CONTROL
4 Existing ABB DRIER & BOILER ROOM wireless
ROOM
FLANGE CONTROL wireless
5 New DN125 AE VORTEX FACTORY
PN16 ROOM
FLANGE CONTROL wireless
6 New DN80 AE VORTEX FACTORY
PN16 ROOM
FLANGE CONTROL wireless
7 New DN100 AE VORTEX FACTORY
PN16 ROOM
FLANGE CONTROL wireless
8 New DN40 AE VORTEX FACTORY
PN16 ROOM
FLANGE CONTROL wireless
9 New DN50 AE VORTEX FACTORY
PN16 ROOM
FLANGE CONTROL wireless
10 New DN80 AE VORTEX FACTORY
PN16 ROOM
FLANGE CONTROL wireless
11 New DN100 AE VORTEX FACTORY
PN16 ROOM
FLANGE CONTROL wireless
12 New DN50 AE VORTEX FACTORY
PN16 ROOM
FLANGE CONTROL wireless
13 New DN100 AE VORTEX FACTORY
PN16 ROOM
FLANGE CONTROL wireless
14 New DN100 AE VORTEX FACTORY
PN16 ROOM
FLANGE CONTROL wireless
15 New DN50 AE VORTEX FACTORY
PN16 ROOM
FLANGE CONTROL wireless
16 New DN80 AE VORTEX FACTORY
PN16 ROOM
6|Page
PT. Intek Sinergi Global CONFIDENTIAL
Commercial Proposal
7|Page
PT. Intek Sinergi Global CONFIDENTIAL
Site: Bekasi Plant
1. Prices above do not include PPN 11% for Products, and PPh23 2% for Engineering Services.
2. Project Lead time: 8 – 12 weeks.
3. Warranty 6 months after commissioning.
4. Payment terms: 50% down payment, 50% after commissioning.
5. Quotation can be issued separately as required.
6. Proposal is valid for 3 months.
8|Page
PT. Intek Sinergi Global CONFIDENTIAL
Engineering Scope of work
A. Operational Training
Operational training will be delivered for the operator on agreed time and date.
B. Technical Support
Enerwise provides 6 months technical support after the completion of the project.
Julian Azwar
Director
31 March 2023
9|Page
PT. Intek Sinergi Global CONFIDENTIAL