Method of Measurements Box Culvert

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
Technical Specification for the Davao City Part G Bypass Construction Project, Package 1-2, Sta. 0~000 0 Sta. 12+800 Drainage and Slope Protection Structures 500.3 50.3.6 500.4 Construction Requirements Add the following at the start of this section: The Contractor shall prepare and submit shop/working drawings and method of statement based on the as-staked survey, including dewatering and temporary diversion of waterways if required, for approval of the Engineer at least 14 days before starting, the construction, Backfilling Add the following at the end of this sub-section: ‘The Contractor shall stockpile suitable material for backfilling of culverts from the roadway and/or structure excavation, ‘Method of Measurement Modify the fourth paragraph of this Sub-Section, to read as follows: No separate payment shall be made for Class B bedding material placed and approved but deemed to be included in the pipe culvert payment. Add the following at the end of this Sub-Section: ay T c works of box culverts accepted by the Engineer shall be measured for payment cordance with shop/working drawings, as follows: ‘Structure excavation in cubic meter ‘+ Foundation fill in cubic meter. + Concrete in cubic meter. ‘+ Backfill: Selected materials from roadway and/or structure excavation shall be measured and paid as a part of the embankment. Reinforcing steel in kilogram. Structural Concrete in cubic meter. Lean Conerete in cubie meter Gabions in cubie meter Water stop in meter Joint Materials in square meter ‘+ Granular backfill in cubic meter as approved in the shop drawings. No separate payment shall be made for dewatering and/or temporary diversion of waterways which may be required for the box culvert construction and deemed to be included in relevant pay items in this section. Clearing and grubbing and removal of tress shall be measured and paid under Item 100- Earthwork. Unsuitable or surplus materials not acceptable for use of the backfill ot embankment shall be disposed to the approved disposal areas. Transport of these materials exceeding free haul distance shall be measured and paid under Item 107- Overhaul DPWH G2

You might also like