The responsibility matrix outlines responsibilities for project items between the client and MFGC. The client is responsible for documents and drawings, temporary facilities, and field expenses. MFGC is responsible for the detailed time schedule, method statements and materials submittals, jobsite office, material storage, power and water, toilets and medical facilities, and lighting if needed. MFGC is also responsible for transporting workers, handling equipment and materials, mobilization and demobilization, supplying and inspecting materials, safety procedures, equipment and tools, performing construction works, housekeeping, and joint final inspections with the client.
The responsibility matrix outlines responsibilities for project items between the client and MFGC. The client is responsible for documents and drawings, temporary facilities, and field expenses. MFGC is responsible for the detailed time schedule, method statements and materials submittals, jobsite office, material storage, power and water, toilets and medical facilities, and lighting if needed. MFGC is also responsible for transporting workers, handling equipment and materials, mobilization and demobilization, supplying and inspecting materials, safety procedures, equipment and tools, performing construction works, housekeeping, and joint final inspections with the client.
The responsibility matrix outlines responsibilities for project items between the client and MFGC. The client is responsible for documents and drawings, temporary facilities, and field expenses. MFGC is responsible for the detailed time schedule, method statements and materials submittals, jobsite office, material storage, power and water, toilets and medical facilities, and lighting if needed. MFGC is also responsible for transporting workers, handling equipment and materials, mobilization and demobilization, supplying and inspecting materials, safety procedures, equipment and tools, performing construction works, housekeeping, and joint final inspections with the client.
The responsibility matrix outlines responsibilities for project items between the client and MFGC. The client is responsible for documents and drawings, temporary facilities, and field expenses. MFGC is responsible for the detailed time schedule, method statements and materials submittals, jobsite office, material storage, power and water, toilets and medical facilities, and lighting if needed. MFGC is also responsible for transporting workers, handling equipment and materials, mobilization and demobilization, supplying and inspecting materials, safety procedures, equipment and tools, performing construction works, housekeeping, and joint final inspections with the client.
Documents & Drawings Project Specification & Drawing Master Project Schedule Detailed Time Schedule Method Statement & Materials Submittal Temporary Facilities Common Fence & Guard House around laydown area-if required Compacted land for temporary facilities area if required Jobsite office for subconbtractor Store for all material supplied by MFGC Suitable source of Power (220V, 380V) Drinking water for MFGC personnel use Construction water at points of work if required Site toilets and its services First Aid and medical facilities Lighting for night work if required Field Expenses Food, accomodation & transport services for MFGC workers Handling of equipment & materials Mobilization (One time) De-Mobilization (One time) Scope of Materials Supply Supply and apply all required materials Tools & consumables Inspection & Control of supplied materials Shipment & transportation of all materials to site Loading & Unloading of equipment at site HSE & QC Standard safety & PPE Provide safety induction training if required Work permit, safety officers, fire watch, safety managers,… Calibration of equipment & devices if required Equipment, Tools & Consumables Equipment, tools & consumables required for site activities Scaffolding if required Scope of Construction works Processing of gate passes for MFGC personnel, vehicles & equipment Releasing the work (without obstacles) as per time schedule Provide the qualified staff to properly perform the work Deliver the concrete surface clear of any leftovers or any other stocked materials over the surface that might hinder the work progress Repair & replacement work due to damage after inspection House Keeping Final Inspection Waste Disposal