RESPONSIBILITY MATRIX

Item Description Client MFGC


Documents & Drawings
Project Specification & Drawing 
Master Project Schedule 
Detailed Time Schedule 
Method Statement & Materials Submittal 
Temporary Facilities
Common Fence & Guard House around laydown area-if required 
Compacted land for temporary facilities area if required 
Jobsite office for subconbtractor 
Store for all material supplied by MFGC 
Suitable source of Power (220V, 380V) 
Drinking water for MFGC personnel use 
Construction water at points of work if required 
Site toilets and its services 
First Aid and medical facilities 
Lighting for night work if required 
Field Expenses
Food, accomodation & transport services for MFGC workers 
Handling of equipment & materials 
Mobilization (One time) 
De-Mobilization (One time) 
Scope of Materials Supply
Supply and apply all required materials 
Tools & consumables 
Inspection & Control of supplied materials 
Shipment & transportation of all materials to site 
Loading & Unloading of equipment at site 
HSE & QC
Standard safety & PPE 
Provide safety induction training if required 
Work permit, safety officers, fire watch, safety managers,… 
Calibration of equipment & devices if required 
Equipment, Tools & Consumables
Equipment, tools & consumables required for site activities 
Scaffolding if required 
Scope of Construction works
Processing of gate passes for MFGC personnel, vehicles & equipment 
Releasing the work (without obstacles) as per time schedule 
Provide the qualified staff to properly perform the work 
Deliver the concrete surface clear of any leftovers or any other stocked
materials over the surface that might hinder the work progress 
Repair & replacement work due to damage after inspection 
House Keeping 
Final Inspection  
Waste Disposal 