Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

TOSEEF IQBAL

HEAD PLANT OPERATOR

Objective
To use my knowledge of chemical processes to contribute to the
success of a company as a head chemical plant operator.
+92-3334106959 Seeking an opportunity to work where I can utilize my skills in
operating and maintaining.
tauseeff@gmail.com
Professional profile
Fatima Fertilizer
Company Township, Having 16 years of experience of Erection & Commissioning and routine
sadaqabad. Pakistan. operation in utilities section in Fatima Fertilizer limited Pakistan, (With the
objective of setting-up a fully integrated fertilizer complex, capable of
producing two. Intermediate products i.e., Ammonia and Nitric acid, Nitro
Education
Phosphate (NP), Calcium Ammonium Nitrate (CAN) and Urea) and Olympia
DAE (Mech) Chemical.
2001 TO 2004.
METRICLATION (SCIENCE)
Work Experience
1999 TO 2001.
Head Plant Operator
Fatima Fertilizer Limited Sadiq Abad
Technical Education 2009 TO TILL NOW (13 Years)

Apprenticeship training as Plant


Operator at Olympia Chemical Area Of Expertise in Fatima Fertilizer
Ltd. Khushaab, Pakistan.
Currently I am working in Fatima Fertilizer, Where I have perfumed duty on
Boiler Engineering Competency following posts.
Class “C ” ➢ Two Gas turbine Generator (26 MW each) Mark Vi
Technical Skills ➢ Utility Steam Generator 75 ton/hr
➢ Steam turbine Generator (5 MW) Back Pressure
▪ ➢ Heat Recovery Steam Generator 75 ton/hr
Ensuring compliance with
health safety and ➢ Waste Gas Boiler 90 ton/hr
environmental regulation.
➢ IA/PA Compressor
▪ Incorporating safety ➢ Emergency Diesel Engine
procedure for working with ➢ Deaerator
dangerous chemicals.
▪ Monitoring and optimizing the Experience of Erection & Commissioning
performance of production
Erection and Commissioning of Dual Fire (Waste gas + Natural Gas) Boiler
processes.
Natural circulation with capacity 90 ton/ hr steam.
▪ Use trial and error to find a
workable solution. ➢ Hydro Test of Boiler and lines.
➢ PSSR (Pre Start Up And Safety Review.
➢ Chemical cleaning of lines and Equipment.
➢ Steam blowing and Air blowing.
➢ Safe Start up and shut down.
➢ Boil Out and Passivation
PERSONEL DETAILS
➢ interlocks Stroke checking
DATE OF BIRTH
➢ Solo Run and Test Run.
24-10-1985
Current Job Responsibilities
NATIONALITY

PAKISANI ➢ Responsible for Safe Startup and Shutdown as control room


DCS operator.
MARITAL STATUS
➢ Direct and guide the area operators under his supervision to
MARRIED assist operations of the plant.
➢ Responsible to safe operation, Startup / shutdown of GAS
LANGUAGES
TURBINES , HRSG and STEAM TURBINE on DCS.
▪ URDU(NATIVE) ➢ Responsible emergency power line up in case of total
power failure.
▪ ENGLISH
➢ Responsible to operate and monitor the smooth operation of
all process Units / equipments.
SPECIAL ACHIEVMENTS
➢ Follow and maintain all operational instruction given by shift
▪ BEST FIRE WARDON ➢ Coordinator/shift engineer in day-to-day activities and
▪ SPOT AWARD WINNER coordinate all emergencies/operational activities with other
▪ FIRE WATER
duty operators.
➢ Participate in start up and shutdown of all related
EMERGENCY HANDLING
section/equipment.
▪ RO PLANT ➢ During normal operation keep logging record of two hourly
INSTALLATION AND process Parameters on DCS.
COMMISIONIG FOR ➢ Follow LOTOTO procedure of electrical motors
DRINKING PURPOSE
Olympia Chemical Ltd. 2006 to 2007)

Skills & Training


I worked on coal fired Steam Generation unit This Section Has a
▪ Engineering Drawing “Combustion Engineering” water tube Boiler having Balance draft
▪ Fire Fighting furnace.
▪ PTW
▪ Breathing Apparatus Premier Industrial Chemical Ltd. (2007 to 2009)
▪ PPEs
Commissioning of coil fired boilers & Steam Turbine in Premier
▪ Confined space rescue Industrial Chemicals Ltd.
▪ PSM ➢ 06 MW Back Pressure Steam Turbine Generator Operating
▪ EMS pressure of 60 kg/cm2 steam.
➢ 2.8 MW Emergency Diesel Generator for Backup and Emergency
Load incase of black out.
➢ Steam turbine inlet pressure 60 kg/cm 2 and outlet steam pressure
18 kg/cm2.

Shutdown & Turnarounds

I am fully aware of the plant site jobs handing over for


maintenance and taking back after maintenance according to
standard work permit procedure (WPP or PTW) during normal
operation and annual turnaround/shutdowns.

You might also like