OK TO START - LCS( For BOF Converter)

LD#3, PSM, 10 mtr Floor, SHIFT


SITE TSL/LD#3 Location BOF#

Revision No:

IMPORTANT Sl No. What to check Sense Status Action

5S 1 Machine cleanliness

2 Machine Tool box

3 ON/OFF Switch -key

4 Software

5 Battery

Head sheild -up and down,


6
side wise

7 Wheel - by pushing/up/down

8 Protection- Heat/crane/floor

9 Inclinometer

10 Reflector

11 Heat/Campaign No

12 Walkie talky

Remarks:
Shift Engg.

Name

Signature

Date
OK TO START - LCS( For BOF Converter)

LD#3, PSM, 10 mtr Floor, SHIFT


SITE TSL/LD#3 Location BOF#

Revision No:

IMPORTANT Sl No. What to check Sense Status Action

5S 1 Machine cleanliness

2 Machine Tool box

3 ON/OFF Switch -key

4 Software

5 Battery

Head sheild -up and down,


6
side wise

7 Wheel - by pushing/up/down

8 Protection- Heat/crane/floor

9 Inclinometer

10 Reflector

11 Heat/Campaign No

12 Walkie talky

Remarks:
Shift Engg.

Name

Signature

Date