ACTION TAKEN REPORT

Name of S.Q.M. : Sh. D.L. Pahadia Executive Engineer PWD S.I. & Q.C. Chittorgarh Date of Inspection : 23.04.2023
If no in Col.6
Whether
Specify the date
Name of Block & Name of Observation Raised During Inspection by action is
S.No. Para wise action taken. in which the Remarks
Work SQM/EE (Q.C.)/ SE (Q.C.) complete
action will be
(Yes/No)
completed.
1 2 3 4 5 6 7
(i) No Referance Pillar casted and no marking (i) Referance Pillar has been casted and Photograph
of intial ground level. & various Level. Marking of Various level. Yes N.A
Enclosed
(ii) No information Board / Citizen Board (ii) Information / Citizen Board Has been Photograph
Block :- Begun Yes N.A
Installed at Site. installed at Site. Enclosed
Construction of Road
from NH-27 to (iii) at Ch. 0/500 CD Work Slab Casting work in (iii) N.A Photograph
1 N.A N.A
Chanwandiya via progress. Enclosed
Gopalpura,Hardevpura (iv) No Lab Established at Site. (iv) Lab Has been Estalished. Photograph
(including CD Works) Yes N.A
Enclosed
(v) Cube Casting of CD Work Slab at Ch. 0/500 (v) Cube Casting of CD Work Slab at Ch. 0/500 Photograph
Cubes Send to Distt. Lab After 7 days. Has been sent to Distt. Lab Chittorgarh. Yes N.A
Enclosed

1 The action as warranted by SQM/EE (Q.C.)/SE (Q.C.) Obersavation has been fully complied and has been got verified on ground.
The Corrective action in respect of SQM/EE (Q.c.)/SE (Q.C.) observation has been taken in the stretch and verified the same in adjoining section and duly
2
supported with relevant documents and photographs.
3 It is recommended for approval.

Assistant Engineer, Executive Engineer, Executive Engineer Superintending Engineer,


PWD Sub Dn. I Begun PWD Dn. Begun PWD S.I. & Q.C. Chittorgarh PWD, Circle Chittorgarh