10 10

ramp upto basement 1


ramp 1:5

FFL -6.85M
bike parking=117

proposed fire hydrant


below staircase

9 1000 9
FH
up FH
lift
up

staircase 1
lift

800
electrical
riser
staircase 2
8 8

B C' D' E' G H K' L' M N P Q

DOOR/WINDOW SCHEDULE PLAN


DW-01 NTS BASEMENT 2

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

90
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR/WINDOW SCHEDULE PLAN DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS
APARTMENTS, RETAIL & BASEMENT
B. 28TH APRIL 2022 BASEMENT 2
COPYRIGHT OUTRÉ DESIGN C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-01
B C' D' E' G H K' L' M N P Q

RL+1315.71

RL+1315.92

guard
FFL -5.08M
guard
centry
centry

ramp 1:6.7

executive lift

10 10

ramp 1:5 ramp down to


basement 2

BOH FFL -3.85M

2000
lobby
RL+1317.15 office
24'-3"X19'-11"

dumb
drop-off electrical room
33'-3"X8;-11"

1000
waiter FH
9 1000 9
FH
up pipe for
lift fire hydrant

FFL -3.85M up FFL -2.65M


800

FFL -3.805M
3'-10"X5'-1" lift RL+1318.35
RL+1317.15 RL+1317.15 staircase 1
toilet structural slab lvl =-3.85

800
10003'-11"X7'-7" electrical
riser
800

staircase 2
8 8
FH

7 7

sump

basement
FFL -3.85M
car parking 113 nos
ramp down from
sump
ground floor
with double stack 200 nos RL+1317.15

6 6

ramp 1:7 ramp


up to
ground
floor
5 5

DOOR/WINDOW SCHEDULE PLAN


DW-02 NTS BASEMENT 1

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

91
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR/WINDOW SCHEDULE PLAN DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 BASEMENT 1
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-02
RL+1315.75
B C' D' E' G H K' L' M N

duct 600x275 duct 685x275

duct
10 1100 1100 1100 1100 1100 1100 1100 1100 1100 1100 1100
10
1100 1100 1100

duct

FFL-0.7M
kitchen/BOH
dumb
waiter 1000 1000
FH
9 9
800 FH
utility
pipe for
fire hydrant

duct up

1500
800
area up
(genset) gents store staircase 1

1000 1000
furniture
800 800 store 2000 2000

800
service corridor

800

2000
ladies 800
staircase 2 electrical

1125
1480 1160 2660
riser

435
duct

320
8 1000 8
1000
duct 950x320

2000

2000
2000 2000 2000
7 7

2400
2400
6
spillover area 6
67'-11" X 127'-6"
8176.52sq.ft. RL+1318.5
1317.75 spillover area
25'-6" X 89'-4" FFL+0.75M
2472.97sq.ft.
RL+1321.75
FFL+0.9M
RL+1321.9

5 5

2400
2000

2400
ballroom 1 ballroom 2 ballroom 3
45'-11" X 82'-0" 45'-11" X 82'-0" 45'-11" X 82'-0"
capacity=216 capacity=128 capacity=224
up
FH FH
2000 2000 4
4 1000 2000 2000
800 800 800
800
access to lift ladies
800

basement 12PAX

33'-7" X 14'-2"
staircase 3
1000
91'-9" X 29'-6" 1000

VIP room 3
FFL+1.05M

1000
28'-0" X 29'-8"
7695

1600 1000
RL+1322.05
1600
gents
ramp 1:7 800 17'-4" X 26'-0"
1600
800
3 2000 2000 3

800
1:12
VIP room 1
2000

2000
ramp 1:7

1400
20'-5" X 31'-11"
1000
4945

VIP room 2 FH
985

30'-0" X 21'-5"

600
up ramp up from
ramp down to basement
basement 3085 ramp
11240
up to
9070
spill over
RL+1320.046 ballroom drop off level
FFL±0.0M
RL+1320.5 RL+1321 FFL+0.0M FFL±0.0M
B C D E F I J K L M' O Q
DOOR/WINDOW SCHEDULE PLAN
DW-03 NTS GROUND FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

92
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR/WINDOW SCHEDULE PLAN DATE:
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE JUNE 2019 APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 GROUND FLOOR
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-03
B C' D' E' G H K' L' M N

16160
32065

executive lift
duct duct

10 10
meeting diverted
meeting room 3 meeting duct
room 4 store 2 duct
18'10"X18'9" 18'11"X18'9"
room 5 19'-10"X18'-8"
23'7"X18'9"
office 1
63'-4"X46'-0"
2655.25sq.ft. diverted
diverted ducts ducts
from 1ST floor FFL+5.05 M
13940

13940
ceiling

FH
9 1000
9

1000
FH
duct up
office/meeting staircase 2
up
lift
pipe for
room 2 fire hydrant

1000
lift
20'3"X46'8"
store 1 lobby staircase 1
8'9"X21'2" office/meeting room 1 1000

33'3"X26'8" ladies lift

duct electrical

800
diverted
riser
ducts
gents duct
8 8
media room
1000
11'6"X5'2"

B C' D' E' G H K' L' M N

DOOR/WINDOW SCHEDULE PLAN


DW-04 1:150 FIRST FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

93
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR/WINDOW SCHEDULE PLAN DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 FIRST FLOOR
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-04
B C' D' E' G H K' L' M N

214
265 0 265 45
120 65 245 27
25 272 executive lift 245 265
90 0 246 40 5 5400 50 272
5 0 215
0
14 7
AC outdoor unit
12 17
9 0
1510 680 2025 15 895 60
AC outdoor unit
162
0 14
3090 2925 8

1185
2215 1375 1145

480
1280

duct
balcony duct
1430

duct duct 385


3090

1950
office 2
1072.77sq.ft.
4275

office 1
2959.96sq.ft.

1650
proposed
duct
fire hydrant
1000
FH

1000
duct up
1700

pipe for duct


staircase 2 gents duct lift
up fire hydrant
lift
lobby office 3
1000 staircase 1
1214.48sq.ft.
lift

3680
3650

duct ladies

800
electrical
1765 riser duct
duct 5300 duct
6140 4900 1365 2085
170
5 balcony balcony 5
0 259
0
975 164 224
5
235 279
0

110Ø Rain water 110Ø Rain water

B C' D' E' G H K' L' M N

DOOR/WINDOW SCHEDULE PLAN


DW-05 1:150 SECOND FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

94
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR/WINDOW SCHEDULE PLAN DATE:
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE JUNE 2019 APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 SECOND FLOOR
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-05
B C' D' E' G H K' L' M N

226
5
5 AC outdoor unit AC outdoor unit
AC outdoor unit 6
25 268 executive lift 25 272
246 40 0 5 215
0 15 5450 14 895 162
0
0
680 1145
2215 1375

200
1280
10 duct
1430

balcony duct
3090

1950
duct
4275

office 1 office 2
3086.72sq.ft. 2327.49sq.ft.

1650
proposed fire
hydrant duct
1000
FH
9

1000
FH
duct pipe for duct
up
1700

lift fire hydrant


staircase 2 800 gents
800 duct
up

lift
1000 lift lobby
staircase 1

3680
ladies
3650

1000 800
duct electrical
duct riser
1765
5300 duct
8
duct
2985 1000 750 4900 1365
170
5 balcony 0 balcony 5
5 259
0 284 975 164 224
5
248 AC outdoor unit
AC outdoor unit AC outdoor unit 110Ø Rain water
110Ø Rain water

B C' D' E' G H K' L' M N

DOOR/WINDOW SCHEDULE PLAN


DW-06 1:150 THIRD FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

95
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR/WINDOW SCHEDULE PLAN DATE:
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE JUNE 2019 APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 THIRD FLOOR
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-06
B C' D' E' G H K' L' M N

226
5
65
25 268 executive lift 272
246 40 0 5400 45 5 215
0
0 15 14 895 162
680 0
2215 1375 1145
1280
10 10
1430

balcony
3090

1950
office
4275

5972.12sq.ft.

1650
1000
FH
9 9

1000
1700

staircase 2 gents duct


up
up

lift lobby

ladies

3680
3650

staircase 1
1765

800
8 8
5300 6140 4900 1365
5
170 0 0 164
5 5
24 8
5 259 balcony 284 975 balcony 224

DOOR/WINDOW SCHEDULE PLAN


DW-07 1:150 FOURTH FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

96
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR/WINDOW SCHEDULE PLAN DATE:
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE JUNE 2019 APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 FOURTH FLOOR
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-07
B C' D' E' G H K' L' M N

226
5
65
25 268 executive lift 25
246 40 0 272 215
0 15 14 5
600 895 162 0
680 0
2215 1375 1145
1280
10 10
1430

balcony
3090

1950
office
5904.55sq.ft.
4275

1650
1000 FH
9 9
1700

staircase 2 gents duct


up
up

lift lobby

ladies

3680
3650

staircase 1
1765
8 8
2985 4900 1365
5
170 0 0 164
5 5
248
5 259 balcony 284 balcony 224

B C' D' E' G H K' L' M N

DOOR/WINDOW SCHEDULE PLAN


DW-08 1:150 FIFTH FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

97
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR/WINDOW SCHEDULE PLAN DATE:
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE JUNE 2019 APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 FIFTH FLOOR
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-08
B C' D' E' G H K' L' M N

226
5
65
25 268 executive lift 25
2 46 40 0 272 215
0 15 14 5 895 162 0
680 1145 0
2215
1280 1375
10 10
1430

balcony
3090

1950
4275

office
5904.55sq.ft.

1650
1000 FH
9 9
1700

staircase 2 gents duct


up
up

lift lobby

ladies

3680
3650

staircase 1
5300
1765
8 8
2985 4900 1365
5
170 0 0 164
5 5
2 48
5 259 balcony 284 975 balcony 224

B C' D' E' G H K' L' M N

DOOR/WINDOW SCHEDULE PLAN


DW-09 1:150 SIXTH FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

98
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR/WINDOW SCHEDULE PLAN DATE:
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE JUNE 2019 APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 SIXTH FLOOR
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-09
executive lift 12365
26100

duct
6110

Restaurant
Area=4621.05sq.ft.

outdoor seating
Area=771.66sq.ft.

12745
1000 FH
FH
duct

1000
15290
lift
staircase 2 up

lift

duct

800
electrical staircase 1
riser

40950

DOOR/WINDOW SCHEDULE PLAN


DW-10 1:150 SEVENTH FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

99
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR/WINDOW SCHEDULE PLAN DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 SEVENTH FLOOR
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-10
WINDOW SCHEDULE 1

4945 3085 9070 985


60 930 60 930 60 930 60 930 60 930 990 60 990 60 990 955 60 955 60 955 60 955 60 955 60 955 60 955 60 955 60 955 925 60
60
1980
3100

60
1000

FL

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM
S NO DATE

100
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK COMMERCIAL COMPLEX WITH WINDOW SCHEDULE
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL A. 4TH FEB. 2022 DATE: JUNE 2019 APPROVED BY: SS
CONFERENCE HALL, SERVICE
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-11
WINDOW SCHEDULE 2

11240 1400
60 960 60 960 60 960 60 960 60 960 60 960 60 960 60 960 60 960 60 960 60 960 640 60 640 60
600
60

50 500 50

50
725
1980

50
3100

725
50
60

1100
1000

FL FL

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

101
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-12
WINDOW SCHEDULE 3

1100
50 1000 50 50 7695

60 1030 60 1030 60 1030 60 1030 60 1030 60 1030 60 1035 60

60
900

1500 1125
50 675 50 675 50 50 490 50 490 50
50

50

1980
900

900

3100
50

50
2400

2400

2400

60
1400

1400

1000
FL FL FL FL

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM
COMMERCIAL COMPLEX WITH S NO DATE
WINDOW SCHEDULE
102
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL A. 4TH FEB. 2022 DATE: JUNE 2019 APPROVED BY: SS
CONFERENCE HALL, SERVICE
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-13
WINDOW SCHEDULE 4

13940 48225 13910


60 900 900 60
60
60
700

640
60
1700

1640
3400

60
1000

880

FL
60

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

103
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-14
WINDOW SCHEDULE 5

6140
60 955 60 955 60 955 60 955 60 955 60 955 60
60 480 60

3680
60 1150 60 1145 60 1150 60 3680

60
60 1150 60 1145 60 1150 60

60
8MM THK 8MM THK
8MM THK TEMPERED TEMPERED
2000

1940
TEMPERED GLASS GLASS
3600

1540
GLASS

3000

2600
60

60

60
10 MM THK
10 MM THK TEMPERED
10 MM THK
880

880

880
TEMPERED GLASS
TEMPERED
GLASS
GLASS
FL FL FL
60

60

60
REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

104
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-15
WINDOW SCHEDULE 6

1650 1950
60 885 60 885 60
60 735 60 735 60
1650
1950
60

60
60 735 60 735 60 60 885 60 885 60

60

60
8MM THK TEMPERED 8MM THK TEMPERED 8MM THK TEMPERED 8MM THK TEMPERED

2000
1940

1940
GLASS GLASS GLASS GLASS

1600

1540
1540
3000

3000
2600

2600
60

60
60

60
10 MM THK 10 MM THK 10 MM THK 10 MM THK

1000

1000
TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS TEMPERED GLASS
880

880

880

880
FL FL FL FL
60

60

60

60
REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

105
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-16
WINDOW SCHEDULE 7

5400
1145
50 1045 50 60 1010 60 1010 60 1010 60 1010 60 1010 60
1145
50

60
50 1045 50

50
2000

1950

1940
1600

1550
3000

3000
2600
50

50
1000

1000

940
FL FL FL

60

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

106
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-17
WINDOW SCHEDULE 8

4275 3090 1430


1280
50 590 590 50 60 1010 60 1010 60 1010 60 1010 60 1460 50 1460 60 1370 60
1280
50

60
50 590 590 50

50
8MM THK
TEMPERED
2000

1900

1940
GLASS

1600

1500
3000

3000
2600
50

50
10 MM THK
TEMPERED
1000

1000

1000
GLASS

FL FL FL

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

107
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-18
WINDOW SCHEDULE 9

1700
60 760 60 760 60 4275 3090 1430
1700
60

60 760 60 760 60 60 1010 60 1010 60 1010 60 1010 60 1460 50 1460 60 1370 60

60

60

60
8MM THK
1940

TEMPERED

1540

1540

1540
GLASS
3000

2600

2600

2600
60

60
10 MM THK
TEMPERED

1000

1000
880

880
GLASS

FL FL FL
60

60

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

108
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-19
WINDOW SCHEDULE 10

3650

60 1145 60 1115 60 1145 60


3650
60

1145 60 1115 60 1145 60

60
8MM THK 8MM THK
1940

TEMPERED TEMPERED

1540
GLASS GLASS
3000

2600
60

60
10 MM THK 10 MM THK
TEMPERED TEMPERED
880

880
GLASS GLASS

FL FL FL
60

60

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

109
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-20
WINDOW SCHEDULE 11

26100 12365
60
60 900 60 900 60 60 900 60 355 630 60 900 60 900 60 900 60 60 900 60 900 60 900 60 900 60 60 900

60

60
1800
3580
3700

3580

4500
2700
60

60
800

800
FL FL

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

109
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-20
WINDOW SCHEDULE 12

6110
12745
60 1150 60 1150 60 1150 60 1150 60 1150 60
60 1095 60 1095 60 1095 60 1095 60 1095 60 1095 60 1095 60 1095 60 1095 60 1095 1095 60

60

60
1680
1800

1800
1740
60

60
4500

4500
2640
2700

2580
2700
FL FL

60

60
REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

109
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-20
WINDOW SCHEDULE 13

60

1800
1740
60

4500
1780

2700
60
800
FL

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

109
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-20
1765
duct 5300

5 balcony
170 0
235
0 259 279
0

110Ø Rain water

OVERALL PLAN
DW-22 1:100 SECOND TO SEVENTH FLOOR

STRUCTURAL GLAZING
60X120X2.8 MM
130 90 265 135 540 85 570
1025 2350 955 1705 1010 1525 1450 2590 5300 700 1765 1225 1555 2840
seventh floor
WINDOW SCHEDULE 14 lvl +25850

60
1540
3200

60
940
sixth floor
60 60

480
lvl +22650
1600
3200

60
940

fifth floor
60 60

480

lvl +19450
1600
3200
16200

60
940

fourth floor
60 60

lvl +16250
480
2000
3600

60
940

third floor
60 60

lvl +12650
480
2000
3600

60
880

second floor
60

lvl +9050
600

STRETCH SOUTH ELEVATION


DW-22 1:100 SECOND TO SEVENTH FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

111
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 SOUTH STRETCH ELEVATION
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-22
riser duct
duct
6140 4900 1365 2085
balcony 5
975 164 224
5

110Ø Rain water

OVERALL PLAN
DW-24 1:100 SECOND TO SEVENTH FLOOR

STRUCTURAL GLAZING
60X120X2.8 MM
260
570 140 365 145 135 230
1195 975 6140 700 4900 700 1365 2085 1010 1645 1500 2245 2645
seventh floor
WINDOW SCHEDULE 15 lvl +25850

600
485 500 1170 1000 700

2600
1240 500 2115 sixth floor
lvl +22650

500

3200
300 600 1200
600 600
2655

fifth floor
985 1170 1700 lvl +19450

3200
2650 500
705

16200
1850

385
fourth floor
300 lvl +16250
1000 650 750 1155

3600
2450

third floor
lvl +12650

3600
second floor
lvl +9050

600
STRETCH SOUTH ELEVATION
DW-24 1:100 SECOND TO SEVENTH FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

113
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 SOUTH STRETCH ELEVATION
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-24
1950
duct
385
duct
162 1145 2925

480
0 0 895
215
0 70 86 272
5 50
14 245
AC outdoor unit
14
265 executive lift
45 265
27

OVERALL PLAN
DW-21 1:100 SECOND TO SEVENTH FLOOR

STRUCTURAL GLAZING
60X120X2.8 MM

165 265 325 265 480 230


2745 2150 1470 1620 895 1145 2925 2725 1450 1315 1725
seventh floor
WINDOW SCHEDULE 16

60 60
lvl +25850

500
1580
3200

3200
60
940
sixth floor
60 60
500

lvl +22650
3200

3200
2000
60 60 60
500 520

fifth floor
lvl +19450
3200

3200
2000
60 60 60
500 520

fourth floor
lvl +16250
2000
3600

3600
60
920

third floor
60 60

lvl +12650
500
2000
3520

3600
60
780

second floor
60

lvl +9050

600
STRETCH NORTH ELEVATION
DW-21 1:100 SECOND TO SEVENTH FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY:SM

110
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS
APARTMENTS, RETAIL & BASEMENT
B. 28TH APRIL 2022 NORTH STRETCH ELEVATION
COPYRIGHT OUTRÉ DESIGN C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-21
DOOR SCHEDULE 1

800
1000 2000
75 850 75 75 925 925 75 75 650 75
75

75

75
TIMBER TIMBER TIMBER FRAME

2175
2400

2400

2400
2325

2325
FRAME FRAME

TEAK VANEER IN TEAK VANEER IN TEAK VANEER


VARNISH FINISH VARNISH FINISH IN VARNISH FINISH

FL FL FL

170
DOOR SCHEDULE
DW-30 NTS
REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

119
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-30
DOOR SCHEDULE 2

2400 2000
75 1125 1125 75 75 950 925 75
75

75
TIMBER 1600
TIMBER 1000
FRAME 75 550 900 75 FRAME 75 850 75
TEAK VANEER IN TEAK VANEER IN

75
75
VARNISH FINISH VARNISH FINISH
4000

4000
3900

3900
TIMBER FRAME TIMBER

2400
2400

2325
2325
FRAME

TEAK VANEER TEAK VANEER IN


IN VARNISH FINISH VARNISH FINISH

FL FL FL FL

DOOR SCHEDULE
DW-31 NTS
REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

120
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-31
INSIDE ROOM
SOLID SISAU IN VARNISH
110 FINISH

70 8 45 15 15 45 8 70

10
10 25

41

41
15
75

125
40MM THK HOLLOW

84

84
80 CORE TIMBER DOOR IN 15
10 VANEER FINISH
10
12

12
75X125MM THK SOLID
TIMBER FRAME IN
57 8 8 60 NATURAL VARNISH FINISH 60 8 80
15
8X10MM GROOVE LINE
ALL AROUND THE FRAME

SOLID SISAU IN VARNISH


FINISH

OUTSIDE ROOM

DOOR DETAIL
DW-32 NTS
REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

127
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
DOOR DETAIL DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-32

You might also like