Request No.

:
…..../PMAS/RFI/VII/2023
REQUEST FOR INSPECTION Date : 21 July 2023

No. of pages:
QA/QC DEPARTMENT TO CLIENT
Project : GROUND IMPROVEMENT WEST PANGKAH PROJECT
Client : SAKA INDONESIA PANGKAH LIMITED

1. MATERIAL INSPECTION 6. DIMENSIONAL INSPECTION (AFTER)

2. DIMENSIONAL INSPECTION (BEFORE) 7. COMPRESSIVE STRENGTH TEST

3. PRECAST INSPECTION √ 8. ELECTRICAL

4. POURING CONCRETE 9. INSTRUMENT

5. N.D.T - ( RT/UT/MT/PT) 10. SOIL TEST

11. OTHER ………………………………….

Responsible person : QC Engineer

ITEM FOR INSPECTION

Pre-Cast CAM Pre-Mobilization Inspection IF APPLICABLE


- Rencana Precast CAM yang diinspeksi = 55 unit Mill Certificate
> Tanggal 21 Juni 2023 = 20 unit Manufacture Data Report
> Tanggal 22 Juni 2023 = 35 unit Ref. Drawing No.
Shop Drawing √
Cutting Plan
- Inspeksi yang dilakukan adalah pengecekan dimensi dan visual
Data Sheet
precast CAM

We wish to advise that the above item will be ready for inspection P.O

On Time Location Company Spec.


22 July 2023 14.30 Workshop Paciran

Comments : Results of Inspection :

Accept

Reject

# After completion of inspection, QC inspector must handover a copy to responsible person from fabrication.
Requested by Inspected by

Sign : Anton Prastowo Sign :


Date : 21 July 2023 Date :

QC INSPECTOR CLIENT REP.