DP 17.05.23

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Electric Loco Shed, Southern Railway, ERODE. Locomotive Status As On 17.05.23 Wednesday At 09.

30Hrs
HOLDING TARGET ACTUAL INEFFECTIVE May 23 No.of Insp May 23 No.of O/H
Testing Status
WAP4-36
111 104.00 104.00
ICO IC IB & IB-1 IB-2 IA TOTAL IOH TOH 2023-24 OH done
7.00
WAP7-75 May 23 No.of Inspection 48 Due 46 25 14 31 116 2 3 12 - 28027
WAG7- 94 94 76.14 86.90 7.10 May 23 No.of PST done 29 Done 24 11 3 10 48 4
TOTAL 205 180.14 190.90 14.10 May 23 PST done in % 60.42% TOTAL - 04
A. UNDER OVERHAUL
S.No Loco No Last OH Date Last Insp Date Date In Target Activity Place WORK UNDER PROGRESS AND OTHER SPECIAL REMARKS IF ANY
® 24615 F TOH 24.01.22 IA 27.12.22 --- --- Off POH LW PER Trial over / Despatched
® 30379 TOH 21.09.20 IC 09.11.22 --- --- POH ELW BSL Dead by 22650 on 13.04.23 to ELW/BSL
® 24657F TOH 07.11.22 IB-1 14.03.23 05.05.23 *** POH LW PER MU with 27559 - Detached / Dead by 06846 on 04.05.23
® 24658 TOH 16.08.22 IC 27.03.23 14.05.23 *** POH LW PER MU with 28730- Detached at TS TVT on 13.05.23
1 22295 TOH 27.09.21 IC 27.01.23 08.04.23 19.04.23 TOH ELS ED RLC pending / Trial 08:30Hrs
2 27437 TOH 26.05.21 IB-1 09.01.23 06.05.23 15.05.23 IOH ELS ED FDCS conversion over
3 22298 TOH 04.09.21 IC 31.12.22 10.05.23 19.05.23 TOH ELS ED RLC pending
4 22256 TOH 27.10.21 IC 14.02.23 13.05.23 23.05.23 TOH ELS ED RLC pending
5 37036 TOH 29.03.21 IC 12.04.23 17.05.23 26.05.23 IOH ELS ED Equipments unloading & blowing /RLC pending
B. DESPATCHED
® 30714 IOH 07.01.23 IB 04.04.23 14.05.23 16231 *** TI+SplCC Wheel profile checked - WT over / OCR acted - Attended / Despatched for 16232
® 22602 TOH 19.11.22 IC 21.04.23 15.05.23 19567 *** TI done Despatched for 12688
C. UNDER INSPECTION
6 39232 ICO ED 18.02.23 --- --- 17.05.23 16231 *** IB Washing pending / 54735 kms
7 37436 TOH 16.02.23 --- --- 17.05.23 LE CBE *** IB PST not done
8 27651 MTR 01.04.22 IB-2 15.03.23 17.05.23 *** IC MU with 28020 / PST not done
MU
9 28020 TOH 04.08.22 IC 15.03.23 17.05.23 *** IA MU with 27651 / PST not done
D. UNDER SPECIAL ATTENTION / REPAIR : PASSENGER
10 30447 TOH 13.05.22 IC 15.05.23 13.05.23 LE CBE *** Off IC RLC & Washing over / OCB1 Attn / GC3 Attn / TFP leak Attn
11 22294 TOH 24.05.22 IC 15.05.23 15.05.23 16235 *** Off IC RLC & washing pending / All axles changing
12 30554 IOH 17.07.21 IB 16.05.23 15.05.23 22649 *** Off IB RLC over / Under WT / Software changing
13 37292 TOH 24.03.22 IC 28.03.23 14.05.23 CLE CBE *** TI+SplCC Profile Normal / PT2 provided / GC2 leak attended / CBC checked / Software changed / F1601P2 / For 16232
E. FREIGHT
14 24605F POH 05.10.22 IC 16.05.23 16.05.23 *** Off IC MU with 27652 / Slack Adjuster modification
MU
15 27652F MTR 06.08.22 IC 16.05.23 16.05.23 *** Off IC MU with 24605 / CBC2 lateral platy Attn over / CTF3 changing / Slack adjuster modifification
F. READY FOR SERVICE : PASSENGER
16 39230 ICO ED 10.02.23 IB 15.05.23 14.05.23 CLE CBE *** Off IB WT over / SR contactor Attn over / TFP Temp sensor changed
17 37306 TOH 03.06.22 IB 20.03.23 15.05.23 16322 *** TI TM6 isolated - Temp sensor changed / Software changed
18 37482 TOH 08.05.23 --- --- 15.05.23 06408 *** TI done Software changed
19 30449 TOH 05.05.22 IC 04.05.23 16.05.23 06845 *** GC done
20 22287 IOH 09.03.23 IA 11.05.23 16.05.23 16787 *** GC done
21 22617 TOH 02.03.23 IA 09.05.23 16.05.23 22649 *** TI done
22 22627 TOH 20.09.22 IC 13.05.23 17.05.23 17316 *** GC done
23 22220 TOH 26.02.22 IA 06.05.23 15.05.23 12687 *** GC For 12687
G. LINK SPARE
24 22249 TOH 01.11.22 IC 13.03.23 17.05.23 22649 *** For IA IA due on 12.05.23
25 37435 TOH 08.02.23 --- --- 17.05.23 LE CBE *** For IB IB due on 09.05.23
H. OUT STATION LOCOMOTIVES
26 30612 ELS LGD --- --- --- 14.05.23 CLE PGT *** TI done Flange wear - WT over / For 22650
27 37600 ELS RPM --- --- --- 17.05.23 CLE CBE *** TI Bogie 1 isolated
S.No Loco No Last OH Date Last Insp Date DOF POF Details of Failure
Avl At
1 30802 TOH 15.03.23 --- --- 10.05.23 PC RECH/SC Bogie 1 isolated / Main power off / Spl CC due
2 24602 POH 11.03.22 IB-1 25.03.23 25.04.23 DD yard ASN MU with 27653 / Brake not releasing
3 27555 TOH 26.07.22 IB-2 03.03.23 25.04.23 SVG BCT MU with 27488 / Tripping via QVRH - HVRH in 3
4 30748 TOH 17.04.22 IB 01.03.23 --- --- MS Spl CC due / Aux winding earth fault / CBC 2 movement more
5 27906 TOH 23.04.22 IB-2 05.05.23 MU with 27469 / QLM acted reported by crew - found normal
13.05.23 MYA GTL
6 27469 TOH 11.08.22 IC 08.05.23 MU with 27906 / QLM acted reported by crew - found normal
7 30555 IOH 22.02.22 IC 09.03.23 14.05.23 RYP NZM-RU Harmonic filter isolated
8 27492 TOH 19.03.22 IA 17.02.23 11.05.23 BPL BSL IB1 due on 18.04.23 / VCD isolation
9 22281 TOH 08.04.22 IC 30.03.23 11.05.23 VSKP DSL/WAT Derailment checking / Spl CC due
10 37435 TOH 08.02.23 --- --- 30.04.23 TVC TVC HOG not working / IB due on 09.05.23
(1). Nomination (2).Next day Insp Plan (3) OH Plan (4). OH Due On Multiple operation
Date Incoming Loco Train Loco No Insp Incoming Loco No Type Date In Target Trial Loco No OH Due On Inspection Due 1 27903 + 27460 - 04.03.22
14.05 16231 30714 16232 22249 IA Shed 22295 TOH 08.04.23 19.04.23 22268 IOH 19.05.23 IA-11.06.23 2 27458 + 27493 - 21.04.22
15.05 19567 22602 12688 37435 IB LE CBE 28021 TOH 18.04.23 28.04.23 04.05.23 28736 TOH3 25.05.23 IB1-02.05.23 3 27750 + 27491 - 07.10.22
14.05 CLE PGT 30612LGD 22650 37482 TOH 21.04.23 03.05.23 08.05.23 22340 TOH2 02.06.23 IA-23.05.23 4 27643 + 24659 - 21.10.22
14.05 CLE CBE 37292 16232 37494 TOH 26.04.23 06.05.23 12.05.23 22306 TOH2 10.06.23 IA-18.06.23 5 27495 + 27472 - 22.10.22
15.05 12687 22220 12687 28027 TOH 02.05.23 11.05.23 15.05.23 28023 TOH2 11.06.23 IC-10.06.23 6 24594 + 28612 - 06.12.22
27437 IOH 06.05.23 15.05.23 37037 IOH 11.06.23 IB-20.06.23 7 27391 + 27631 - 20.12.22
(5)HR Attention 22298 TOH 10.05.23 19.05.23 22360 TOH2 22.06.23 IC -01.05.23 8 24607 + 24611 - 21.12.22
22256 TOH 13.05.23 23.05.23 22358 TOH2 02.07.23 IC -08.05.23 9 28611 + 28609 - 28.12.22
24605, 27652 37036 IOH 17.05.23 26.05.23 10 28023 + 27632 - 29.12.22
11 24605 + 27652 - 13.01.23
12 28020 + 27651 - 18.01.23
(6a) RLC - 22295, 39232, 22294 13 28723 + 24601 - 20.01.23
(6b) Washing - 39232, 22294 Inspection Due 14 27479 + 27498 - 24.01.23
Sl.No Loco No Last Inspection Due Date 15 27757 + 27481 - 28.01.23
1 37435 TOH 08.02.23 IB 09.05.23 16 27487 + 24609 - 01.02.23
Passenger / Under Observation Non HOG
2 30423 IC 10.02.23 IB 11.05.23 17 28026 + 27466 - 01.02.23
37494: Off TOH - 06407/06408 30379 - POH
37297: OCR Acted - 06846/06845 3 22249 IC 13.03.23 IA 12.05.23 18 27471 + 27584 - 03.02.23
4 37379 IB 13.02.23 IC 14.05.23 19 24656 + 27654 - 09.02.23
5 39231 ICO 15.02.23 IB 16.04.23 20 27392 + 27489 - 14.02.23
(7) Wheel Turning - 30554, 22249, 6 22370 IC 18.03.23 IA 17.05.23 MTR PLAN for 2023-2024 21 27756 + 27578 - 28.02.23
22294. 7 30349 IB 16.02.23 IC 17.05.23 NIL 22 27494 + 28613 - 05.03.23
8 30749 IC 18.02.23 IB 19.05.23 23 27555 + 27488 - 05.03.23
Locos Attended Outside ELS-ED Earlier And In Transit/Service 9 37387 IB 18.02.23 IC 19.05.23 POH PLAN for 2023-2024 24 27459 + 27480 - 07.03.23
SNo Loco No Failure Date Place Details 10 37463 TOH 18.02.23 IB 19.05.23 24659 21.07.23 25 28736 + 24617 - 14.03.23
1 27459 13.03.23 SBC MU with 27480 / SPM not working- Now working 28609 21.08.23 26 28028 + 27452 - 23.03.23
2 39125 29.03.23 KYJ PT2 isolated - Attned at TS ERS on 30.03.23 28611 29.08.23 27 28647 + 27473 - 26.03.23
3 28723 13.04.23 DMM MU with 24601 / Both loco WT done @ DSL KJM on 17.04.23 / MU formed at TS/SGT 28613 06.09.23 28 27497 + 27633 - 26.03.23
4 27633 19.04.23 BAY MU with 27497 / All wheel scratch mark / WT done @ ELS GTL on 01.05.23 1 27903 IB-2 09.02.23 IC 10.04.23 28612 13.09.23 29 24602 + 27653 - 27.03.23
5 30555 02.05.23 MAS Wheel skid - WT done at ELS AJJ 2 27460 IB-1 09.02.23 IB-2 10.04.23 30394 15.09.23 30 27490 + 27902 - 28.03.23
6 27486 23.04.23 SNF-HSJ MU with 28025 / Wheel no.3 skid - WT done at LGD on 03.05.23 3 27392 IA 10.02.23 IB-1 11.04.23 28647 06.03.24 31 27905 + 27776 - 30.03.23
7 28025 23.04.23 SNF-HSJ MU with 27486 / Smoke from axle 3 - Axle changed at LGD on 03.05.23 4 27489 IA 13.02.23 IB-1 14.04.23 32 24652 + 27644 - 02.04.23
8 39206 08.05.23 SUR FL2 not working - Attended at TS TVC on 09.05.23 5 27492 IA 17.02.23 IB-1 18.04.23 33 24616 + 28024 - 04.04.23
6 24594 IA 20.02.23 IB-1 21.04.23 34 28025 + 27486 - 07.04.23
7 28612 IA 20.02.23 IB-1 21.04.23 35 27751 + 27467 - 08.04.23
WAP4 with 3 CPs 8 27459 IB-2 03.03.23 IC 02.05.23 36 27560 + 27393 - 19.04.23
22217, 218, 219, 220, 9 27480 IC 06.03.23 IA 05.05.23 37 27496 + 24653 - 26.04.23
221, 222, 232, 249, 256 10 27488 IB-1 03.03.23 IB-2 02.05.23 38 27777 + 27436 - 30.04.23
= 09 Locos
11 27555 IB-2 03.03.23 IC 02.05.23 39 27904 + 27470 - 04.05.23
RR20100 CP 22261,
268, 270, 281, 287, 295, 12 28736 IA 03.03.23 IB-1/TOH 02.05.23 40 27559 + 28021 - 05.05.23
306, 340, 341, 357, 359, 13 24617 IB-1 13.03.23 IB-2 12.05.23 41 27435 + 27752 - 06.05.23
360, 370, 381, 388 = 15 14 27750 IB-2 14.03.23 IC 13.05.23 42 27469 + 27906 - 08.05.23
MTR Done locos 15 27491 IC 14.03.23 IA 13.05.23 43 27468 + 27482 - 11.05.23
S.No Loco No MTR At Received ICO ICO At 16 27495 IB-2 15.03.23 IC 14.05.23 44 27394 + 28027 - 16.05.23
17 27472 IC 15.03.23 IA 14.05.23
POH Done 2x130KVA SIV 27394, 18 27643 IC 17.03.23 IA 16.05.23
S.No Loco No POH At ELS-ED In ICO Done ICO At 27776, 27777, 28028 19 24659 IB-1 17.03.23 IB-2 16.05.23 WAG7 Single
High reach panto 20 28028 TOH 18.03.23 IA 17.05.23 27492- Service 24657 POH
Dual 27486, 28027, 27460,
21 27452 IB-1 20.03.23 IB-2 19.05.23 28730 - Service 24615 POH
27491, 27471, 27492
Ineffective WAP-4/7 WAG-7 22 27437 FDCS/IOH
Avg % ODS for May 23 4.43 16.20 Transfered to DSL on 21.02.23 23 24658 POH
No.of ODS on date 3 15 1.22250, 2.22258, 3.22259,
4.22380, 5.22572
% of ODS on date 2.70% 15.96%

You might also like