PAGE : 1 OF 45

15-Feb-2015

15-Feb-2015
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

REVISION RECORD
Originated Checked Approved
Rev. Date Description
by by by
A 15.02.15 Issued for Review/Approval GM/Vijay PN/SM SP

Page 2 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

1.0  INTRODUCTION ................................................................................................................................................... 6 
1.1  PURPOSE .................................................................................................................................................................. 6 
1.2  SCOPE ...................................................................................................................................................................... 6 
2.0  REFERENCES ........................................................................................................................................................ 6 
2.1  INTERNATIONAL CODES/STANDARDS ............................................................................................................................... 6 
3.0  DEFINITIONS ........................................................................................................................................................ 7 
3.1  GENERAL DEFINITIONS ................................................................................................................................................. 7 
4.0  SAFETY & ENVIRONMENTAL................................................................................................................................. 7 
5.0  QUALITY CONTROL PLAN ..................................................................................................................................... 7 
6.0  INSULATION TYPE & APPLICATION ....................................................................................................................... 9 
6.1  INSULATION TYPE AND APPLICATION ............................................................................................................................... 9 
7.0  MATERIAL REQUIREMENTS .................................................................................................................................. 9 
7.1  GENERAL .................................................................................................................................................................. 9 
7.2  MINERAL WOOL PIPE, SLAB AND MATTRESS INSULATION .................................................................................................. 10 
7.3  REMOVABLE INSULATION COVERS................................................................................................................................. 11 
7.4  FABRICATION ADHESIVES ............................................................................................................................................ 11 
7.5  FASTENERS AND MISCELLANEOUS INSULATION ACCESSORIES .............................................................................................. 11 
7.6  EXPANDED METAL GUARDS ........................................................................................................................................ 12 
7.7  ALUMINIZED STEEL JACKETING ..................................................................................................................................... 12 
7.8  METAL SEALANT ....................................................................................................................................................... 12 
7.9  MATERIAL SUBSTITUTIONS .......................................................................................................................................... 12 
8.0  INSTALLATION REQUIREMENTS .......................................................................................................................... 13 
8.1  GENERAL ................................................................................................................................................................ 13 
8.2  INSULATION MATERIAL SELECTION ................................................................................................................................ 14 
8.3  JACKETING MATERIAL SELECTION ................................................................................................................................. 14 
8.4  INSULATION LAYERING ............................................................................................................................................... 14 
8.5  INSULATION SYSTEM EXPANSION JOINTS ........................................................................................................................ 14 
8.6  PIPE INSULATION SUPPORTS ........................................................................................................................................ 14 
8.7  PIPING INSULATION ................................................................................................................................................... 15 
8.8  EQUIPMENT INSULATION ............................................................................................................................................ 16 
8.9  MACHINERY INSULATION ............................................................................................................................................ 17 
8.10  INSTRUMENT INSULATION ...................................................................................................................................... 17 
8.11  INSULATION FINISH ............................................................................................................................................... 17 
8.12  REQUIREMENTS FOR INSULATION TYPE PP ................................................................................................................. 18 
8.13  ADDITIONAL REQUIREMENTS FOR INSULATION TYPE ET ................................................................................................ 18 
8.14  REQUIREMENTS FOR COLD INSULATION ................................................................................................................... 18 
8.15  PROTECTION OF MATERIALS AND WORK ................................................................................................................... 19 
9.0  FIGURE .............................................................................................................................................................. 30 

Page 3 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE 1 ‐ TYPICAL BLOCK OR SLAB INSULATION  ON VERTICAL VESSELS WITH OUTSIDE  DIAMETERS OVER 750 MM .. 31 
FIGURE 2 ‐ TYPICAL PIPE & BLOCK OR SLAB  INSULATION ON VERTICAL VESSELS WITH  OUTSIDE DIA 750 MM & LESS .. 32 
FIGURE 3 ‐ BLOCK INSULATION ON HORIZONTAL VESSELS WITH OUTSIDE DIAMETERS OVER 750 MM ......................... 33 
FIGURE 4 ‐ PIPE COVERING AND BLOCK INSULATION ON DOUBLE PIPE HEAT EXCHANGERS ......................................... 34 
FIGURE 5 ‐ PIPE COVERING OR BEVELED LAGS ON SHELL AND TUBE HEAT EXCHANGERS .............................................. 35 
FIGURE 6 ‐ SECTIONAL OR SEGMENTAL PIPE INSULATION ............................................................................................ 36 
FIGURE 7 ‐ INSULATED LINES WITH PIPE SHOES ........................................................................................................... 37 
FIGURE 8 ‐ BUTT WELDING TEE ................................................................................................................................... 38 
FIGURE 9 ‐ WELDING CAP ............................................................................................................................................ 38 
FIGURE 10 ‐TYPICAL SUPPORT LOCATIONS  AT FLANGES .............................................................................................. 39 
FIGURE 11‐ TYPICAL SUPPORT LOCATIONS AT ELBOWS ............................................................................................... 40 
FIGURE 12‐ TYPICAL SUPPORT LOCATIONS AT BRANCH CONNECTIONS OR TEE OUTLETS.............................................. 40 
FIGURE ‐13 TYPICAL INSULATION COVER DESIGN ........................................................................................................ 45 

Page 4 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Name Abbreviation / Definition


API American Petroleum Institute
ASCC Alkaline Stress Corrosion Cracking
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
CRA Corrosion Resistant Alloy
CS Carbon Steel
CSCC Chloride Stress Corrosion Cracking
DBB Double Block & Bleed
DM De-Mineralized
ESD Emergency Shutdown
GPF Gas Processing Facility
HAZ Heat Affected Zone
IA Instrument Air
IG Insulating Gasket
IGC Inter Granular Corrosion
ISO International Organization for Standardization
LP Low Pressure
LTCS Low Temperature Carbon Steel
MOC Material of Construction
NACE National Association of Corrosion Engineers
PCV Pressure Control Valve
PFD Process Flow Diagram
ppm Parts per million
PREN Pitting Resistant Equivalent Number
P&ID Piping & Instrument Diagram
QCP Quality Control Plan
SCC Stress Corrosion Cracking
SS Stainless Steel
SSC Sulphide Stress Corrosion
UNS Unified Numbering System
WPQR Welding Procedure Qualification Record

Page 5 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

1.0 INTRODUCTION
1.1 Purpose
The purpose of this document is to describe the Hot and Cold insulation material requirements,
installation guidelines applicable for Gambat South Gas Processing Facility Train-I (GPF -II).
This document covers the material and field application requirements for insulation on the external
surfaces of piping and equipment.

1.2 Scope
This specification should be applicable equipment/piping insulation works whether the insulation
works are carrying out at Vendor shop or Site.

2.0 REFERENCES
2.1 International Codes/Standards
CODE/ STANDARD /
Document/Article Title REFERENCE
Thermal Insulation for Use on Contact Austenitic Stainless ASTM C795
Steel
Chemical Analysis of Thermal Insulation Materials for
ASTM C871
Leachable Chloride, Fluoride, Silicate, and Sodium Ions
Measuring Non-Fibrous Content of Man-Made Rock and Slag
ASTM C1335
Mineral Fiber Insulation
Standard Test Method for Evaluating the Influence of Thermal
Insulations on External Stress Corrosion Cracking Tendency of ASTM C692
Austenitic Stainless Steel
Standard Specification for Mineral Fiber Pipe Insulation ASTM C547
Thermal insulating materials specification for bonded man-
BS 3958-5
made mineral fibre slabs
Standard Specification for Chromium and Chromium-Nickel
Stainless Steel Plate, Sheet, and Strip for Pressure Vessels ASTM A240
and for General Applications
Standard Specification for Stainless Steel Spring Wire ASTM A313

Page 6 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

3.0 DEFINITIONS
3.1 General Definitions

Table 3-1: General Definitions applicable for this document


Name Definition
Presson Descon International Ltd.(PDIL)
COMPANY

CONTRACTOR Exterran Eastern Hemisphere FZE

Any person or persons, firm, partnership, corporation or combination


SUB CONTRACTOR thereof , including vendors to whom any part of the works has been
subcontracted by CONTRACTOR.
The party who supplies the item to the CONTRACTOR
VENDOR /SUBCONTRACTOR. The CONTRACTOR will select the VENDOR as
per COMPANY approvals if any.
The word ‘shall’ indicates a requirement
SHALL

SHOULD The word ‘should’ indicates a recommendation.

4.0 SAFETY & ENVIRONMENTAL

The CONTRACTOR’s equipment/system shall meet the local regulations and if not met any
regulations then local Authority approval shall be taken, keeping the COMPANY informed.

The CONTRACTOR/SUBCONTRACTOR shall be responsible for ensuring that the


equipment/system supplied meets all applicable regulations on health, safety and environment. It
shall be designed to operate safely and satisfactorily at all expected combinations of process,
utilities and site conditions which include those at start-up, operation, shutdown and emergency
cases while retaining the overall system security, reliability and availability.

5.0 QUALITY CONTROL PLAN

Contractor shall have a quality control plan (QCP) that includes quality assurance, quality control
and inspection criteria for all aspects of the work. The QCP shall provide verifiable evidence that all
aspects of quality, including, site material acceptance, storage and handling, selection of proper
materials for application and installation, are acceptable. The QCP shall require inspection hold
points as necessary to assure work can be properly inspected before any additional work is
performed that could obscure defective materials or installation.

Page 7 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

The QCP shall assure the following material handling practices are observed:

a) All materials are accepted only after receipt in good condition and are packaged in a
manner that protects them from rain prior to undercover site storage.
b) Materials are stored in a manner that prevents contamination by water or chemicals
and physical damage.
c) Materials supplies are in strict accordance with the specifications, except where
otherwise agreed in writing by the PURCHASER.
d) Any material samples required for testing are obtained and processed as required by
the QCP.

The QCP shall include, but not be limited to, checks to verify the following insulation practices are
followed as a minimum:

a) Insulation shall not commence until all required testing is complete and systems are
released for insulation by the Purchaser.
b) The surfaces to be insulated are clean and dry.
c) The surfaces to be insulated are painted if required and released for insulation by the
Purchaser.
d) Heat tracing (if applicable) is installed, inspected and released for insulation by the
Purchaser.
e) Existing installed insulation is protected from damage.
f) Installed insulation is the correct thickness and the correct number of layers.
g) All joints are correctly staggered.
h) Insulation is properly secured.
i) Insulation supports are installed and expansion joints in vertical pipe runs are installed
as required beneath insulation supports. Expansion joints on horizontal piping are
installed and spaced correctly.
j) The extent of insulation is correct.
k) Expansion springs are applied as required.

The QCP shall include checks to verify the following insulation finishing practices are followed:

a) The correct material type, temper, thickness, finish and moisture barrier.
b) Jacketing overlap amount and overlap position is correct. Jacketing lap arrangement
is installed to shed water.

Page 8 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

6.0 INSULATION TYPE & APPLICATION


6.1 Insulation Type and Application

Thermal insulation types are listed in Table 6-1 for external surfaces of piping and equipment.
Insulation type is based on the intended application (and type shall be confirmed as per Process
requirement) and is specified on the piping isometric drawings, P&ID, and on the equipment
insulation summary or similar project documents issued by the PURCHASER.

Table 6-1 INSULATION TYPES AND APPLICATIONS

Type Application Description/ Material & Thickness


Code

Heat Conservation, above Ambient and Process Requirement (Mineral Wool).


H
Thickness as per Table 8-5

Personnel Protection, over 65°C operating temperature and manned area


PP
(Mineral Wool). Thickness as per Table 8-6

Heat Conservation (Electric Traced), Ambient and Higher


ET
Thickness as per Table 8-7

C Cold insulation (Polyurethane Foam). Thickness as per Table 8-8

Insulation and finish requirements for piping shall be as specified herein.

Insulation types, thickness, systems and finish for equipment are noted herein and on an equipment
insulation summary or similar document issued by the PURCHASER. Conflicts between the
requirements defined herein and those indicated in the equipment insulation summary shall be
brought to the attention of PURCHASER for resolution prior to application of the insulation system.

The term "equipment" includes vessels (towers, drums, reboilers, and exchangers), machinery
(pumps, compressors, turbines) and tanks (vertical, cylindrical storage tanks).

7.0 MATERIAL REQUIREMENTS


7.1 General

All insulation and accessory materials shall be furnished in accordance with the requirements of this
specification, including the specific grade or type.

Page 9 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

All insulation materials, sealants, mastics, adhesives and other accessories shall not contain
asbestos.

All materials shall be new and previously used materials shall not be used. Sealants, mastics and
adhesives shall be supplied in factory sealed containers.

Contractor's proposals shall detail the proposed design and define the fabrication methods, including
the extent of field assembly required.

Thermal insulation products shall be qualified for use on austenitic stainless steel in accordance with
ASTM C795. The material manufacturer shall demonstrate that the material that will be furnished for
this project has passed the pre-production corrosion test in accordance with ASTM C692. The
material manufacturer shall also furnish a chemical analysis in accordance with ASTM C871.

Use of materials other than those defined herein requires the prior written approval of the
CONTRACTOR and/or COMPANY.

7.2 Mineral Wool Pipe, Slab and Mattress Insulation

Mineral wool is the considered material for heat conservation (H) and personal protection (PP).

Mineral wool insulation for pipe insulation, mattress and slab shall satisfy the following requirements:

Property Requirement

Density 120 kg/m², min.

pH 6 - 9 (when wet)

Leachable total halide content 15 ppm max.

Thermal conductivity 0.065 W/m•K, at 200°C mean

Shot content 20% max. (ASTM C1335)

Mineral wool molded pipe segments shall conform to ASTM C547, Type II, except non-fibrous (shot)
content is limited to 20% max.

Mineral wool wire mesh faced mattress shall conform to BS 3958-3. Mattress shall be furnished
faced with 25 mm stainless steel hex mesh on one side sewn to the mattress with stainless steel
wire.Mineral wool slab shall conform to BS 3958-5.

Page 10 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

7.3 Removable Insulation Covers

Removable insulation covers shall be considered in hot oil service insulation ‘only’ and the typical
insulation cover design is showed in Figure 13 in this document. Insulation Applicator/Vendor can
adopt any his own good engineering design in providing the removable insulation covers, but it
should be in two halves with locks/pins wherever applicable. The removable insulation covers should
be provided for flanges and valves in hot oil & Cold insulation services (only).

Flanges & Valves shall not be insulated other than in hot oil & Cold Insulation services.

7.4 Fabrication Adhesives

Adhesive for mineral wool and glass fiber shall be neoprene based contact cement. The following
manufacturer’s products or any other PURCHASER approved equal products are acceptable as
adhesive materials:

Foster Products Corporation Childers CP 85


Foster Products Corporation Foster 85 15

7.5 Fasteners and Miscellaneous Insulation Accessories

All metallic accessory materials (springs, bands, seals, screws, etc.) shall be austenitic stainless
steel, Type 316, unless noted otherwise.

All banding shall conform to ASTM A240 and be furnished deburred. Banding seals shall conform to
ASTM A240.

Tie wire shall conform to ASTM A240 and A580/A580M. Tie wire shall be 1.3 mm minimum
diameter.

Tensioning springs, including mounting hardware, shall conform to ASTM A240 and A313/A313M.
The manufacturer’s standard products are acceptable as fasteners and miscellaneous accessory
materials.

Sheet metal screws for fastening sheet to sheet at overlaps shall be No. 8 by 13 mm long, austenitic
stainless steel, Type "A" or "AB" point, with either slotted hex head or slotted pan head.

Sheet metal screws for fastening sheet to structure or sub-girt shall be austenitic stainless steel, 6
mm diameter, with hex drive head and integral EPDM washer.

Tape for fastening insulation shall be 25 mm wide pressure sensitive glass filament reinforced tape.

Page 11 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Weather barrier mastic shall be capable of being applied by trowel, glove or brush. It shall be a non
corrosive, heat resistant, fire retardant plastic suitable for continuous exposure to 82°C minimum.
Mastic shall be furnished in aluminum grey, unless otherwise specified. The following
manufacturer’s products or any other VENDOR recommended equal materials (subject to
CONTRACTOR approval) are acceptable:

Childers Product
H.B. Fuller/Foster Products
Vimasco Corp.

7.6 Expanded Metal Guards


Expanded metal shall be Type 316 and conform to ASTM A240, Style 3/4 #18, flattened.

Expanded metal guard support clips shall be fabricated from 38 mm wide, 18 Gage, Type 316
conforming to ASTM A240.

7.7 Aluminized Steel Jacketing

Aluminized steel cladding shall be of coating designation T2-100 (coating weight 1 oz/ft², equivalent
to 300 g/m², and 50 µm thickness on both sides of the sheet) in accordance with ASTM A463.

7.8 Metal Sealant

Metal sealant shall be a room temperature vulcanizing (RTV) silicone, aluminum or grey colour,
suitable for continuous temperatures to 400ºF (204ºC) and intermittent temperatures to 500ºF
(260ºC).

The following manufacturer’s products or any other equal products are acceptable:

General Electric RTV109


Dow Corning 732

7.9 Material Substitutions

Use of materials other than those defined in this specification requires the prior approval of the
CONTRACTOR and/or COMPANY.

Page 12 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

8.0 INSTALLATION REQUIREMENTS


8.1 General

The installation of high temperature insulation systems shall be in accordance with the requirements
of this standard. Functionally equivalent application practices, which are technically acceptable
alternates to the requirements herein, may only be used when identified in the bidder's proposal and
approved by Purchaser.

The Insulation Contractor/Applicator shall be responsible for dry cleaning of surfaces to be insulated
prior to application of insulation. Insulation shall not be applied over wet surfaces.

The Insulation Contractor/Applicator shall protect coated surfaces scheduled to be insulated. The
Contractor shall report to Purchaser any damages to coatings on surfaces scheduled for insulation.
Insulation shall not be applied until coating repairs have been completed.

Insulation shall not be started prior to satisfactory completion of all required hydrostatic or pneumatic
testing and receipt of written release to commence insulation.

Application temperature for sealants and adhesives shall be within the acceptable temperature
range recommended by the manufacturer and shall be in strict accordance with the manufacturer's
current data sheets.

Insulation adjacent to flanges shall be terminated, where space permits, to allow removal of bolts
without damage to the adjacent insulation. All terminations shall be metal finished and weather tight
regardless of whether the actual flanges are bare, covered with weather shields, or insulated with
either permanent insulation or flexible, removable and reusable insulation covers.

Each insulation layer shall be securely fastened in place in accordance with requirements defined in
Table 8-1. Tape securing insulation shall be overlapped approximately 150 mm. The ends of wire
loops used to secure insulation shall be tightly twisted together, bent over and embedded flush with
the insulation surface. Insulation and jacketing bands shall be machine tightened and sealed in
place while in tension.

The use of broken or otherwise defective insulation shall not be permitted. All insulation shall be
smooth and free from cracks, voids, gaps and depressions greater than 3 mm. All cracks, voids,
gaps and depressions in the insulation greater than 3 mm shall be refitted not filled.

Care shall be exercised in the handling and application of materials so as not to splatter concrete
foundations, paving, structural steel, equipment items, gage glasses, instruments, machined
surfaces, valve stems and packing. Contractor shall be responsible for all overspray or splatter
problems, and liabilities associated with corresponding corrective actions.

Page 13 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Extent of insulation shall be as indicated in Table 8-4.

8.2 Insulation Material Selection

Permanent insulation materials shall be mineral wool for Hot insulation & Personnel Protection &
Polyurethane for Cold Insulation.

8.3 Jacketing Material Selection

Insulation jacketing shall be aluminized steel.

Jacketing thickness shall be as follows:

Table 8-A ALUMINIZED STEEL JACKET THICKNESSES

Pipe OD, inches Minimum Sheet Thickness,


mm

≤8 0.56

>8 0.80

8.4 Insulation Layering

Unless otherwise specified, piping and equipment insulation shall be applied as a double layer for
greater than 100 mm.

8.5 Insulation System Expansion Joints

Expansion joints are needed to be considered for rigid insulation type materials. For Mineral wool
type of insulation materials, no expansion joints are envisaged, if required at higher operating
temperatures (e.g. Hot oil), the Insulation vendor recommendations should be considered for the
same.

Insulation expansion joints shall be installed in all layers of multiple layer insulation. Expansion
joints shall be staggered 100 mm between layers.

8.6 Pipe Insulation Supports

Vertical piping insulation supports may be furnished shop installed by the piping fabricator.
However, if supports are not installed or additional supports are required, Contractor shall furnish
and install bolt on supports as shown in Detail N in the end of this document sketches. Design of

Page 14 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

these supports shall be included in the Contractor's proposal, subject to review and approval by
Purchaser. Vertical piping insulation supports as recommended by Insulation applicator/vendor are
required for all insulation types.

Insulation supports shall be carbon steel for carbon and ferritic alloy steel pipe; 18Cr 8Ni steel for
austenitic alloy steel pipe; and of the same material as the pipe for non ferrous pipe.

The number of support clips per insulation support shall be as follows:

Pipe Size Range No. of Clips

NPS 3 - NPS 18 4

NPS 20 - NPS 24 6

NPS 30 - NPS 36 8

NPS 42 - NPS 48 10

Greater than NPS 48 One per 375 mm pipe circumference, rounded up to


even number

8.7 Piping Insulation

Sectional and segmental insulation shall be applied in one or two layers, as required by insulation
type and operating temperature, to the thickness specified. Single layer systems and the inner layer
of double layer systems shall have joints tightly butted with circumferential joints staggered. Double
layer systems shall be installed so that the outer layer is staggered with respect to the longitudinal
and circumferential joints of the inner layer. Each layer of double layer insulation shall be held in
place separately.

All insulation shall be smooth and free from cracks, voids, gaps and depressions greater than 3 mm.
All cracks, voids, gaps and depressions in the insulation greater than 3 mm shall be refitted and not
filled.

As an alternate to die-formed elbow covers, covers for insulation on piping ells may be fabricated
from jacketing material. The jacketing shall be arranged in gored segments. For this purpose, each
segment shall be fabricated with both sides parallel to the curved edge, one edge crimped for fitting
under and one edge swaged for fitting over. The cladding shall be made up in no less than one
segment for each end and one segment for each cut insulation segment.

Page 15 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

8.8 Equipment Insulation

Insulation shall be applied in one or two layers to the thicknesses specified. All joints shall be
carefully fitted. Circumferential joints shall be staggered for horizontal equipment and longitudinal
joints shall be staggered for vertical equipment. In double layer applications, all joints in the outer
layer shall be staggered with respect to inner layer joints.

Equipment with shell diameters of 750 mm or less shall have shell insulation extended to cover the
heads. Each head shall be blocked in with an insulation disc. Nominal disc thickness shall be the
thickness required for the shell.

Unless specified otherwise, all heads exceeding 750 mm diameter (except concealed bottom heads
of skirt supported vessels) shall be insulated with block insulation. Concealed heads shall be
insulated with wire mesh or metal lath faced mineral wool mattress.

Equipment with shell diameters exceeding 750 mm shall have head surfaces insulated with
fabricated insulation segments installed full thickness and fit to follow the curvature of the head.
Each insulation segment shall be retained by bands radiating from a central bridle (floating ring) to
an anchor point on a shell insulation band. Bands shall be spaced on 300 mm or less centers
around the knuckle radius of the head.

Unless otherwise specified, vertical equipment support legs and lugs and saddle supports for
horizontal equipment shall not be insulated.

Insulation on skirt supported vertical vessels shall be extended past the bottom tangent line, down
the exterior surface of the skirt to the bottom insulation support ring. Vessels having skirt inside
diameters exceeding 1200 mm shall have the corresponding inside skirt surface insulated.

Equipment nozzles connected to bare piping shall have the equipment insulation system terminated
on the nozzle and finished with a metallic cover. The insulation shall be applied to the nozzle prior
the application of insulation to the shell of the vessel. In case of double layer application, the
installation of the insulation on the nozzle shall be applied first for each consecutive layer in order to
form a staggered joint at the nozzle/shell juncture.

Sectional mineral wool pipe shall be utilized where specified for insulation of vessel shells with
outside diameters of 750 mm or less. Beveled lag cut from slab shall be utilized where specified for
insulation of vessel shells with outside diameters exceeding 750 mm.

For insulation of vessel shells, rigid pipe sections or rigid curved radius segments shall be utilized up
to the maximum commercially available size. Beveled block insulation for vessel shells shall be
used only when shell diameters exceed the commercially available size of curved radius segments.
Edge beveling of block shall be in accordance with ASTM C450 Adjunct ADJC0450. Bevels may be
applied to either one or both block edges.

Page 16 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Small voids around nozzles and other projections through the insulation on the shell and heads shall
be packed with mineral wool loose fill.

Code or other nameplates shall not be covered by insulation.

8.9 Machinery Insulation

No insulation is required for pumps and other rotating equipment. Compressor insulation shall be as
per Compressor vendor recommendations and no further insulation is recommended as per this
specification.

Unless specified otherwise on individual equipment data sheets or in an equipment insulation


summary, insulation shall not be applied to other machinery items.

8.10 Instrument Insulation

Instrument signal tubing, instrument analyzer tubing and equipment instrument bridles up to
instrument connections shall be insulated if heat traced. Insulation covers for sight glasses with heat
traced bridles shall be furnished as flexible, removable and reusable covers with plastic or tempered
glass windows.

When instrument tubing requires electrical tracing and the tubing is not furnished as pretraced and
insulated bundle, insulation may be installed as follows:

a) Wrap the tube and tracer bundle with two passes of 3 mm thick woven fiberglass tape
using a 50% overlap to provide a total insulation thickness of 13 mm.
b) Secure spiral wrapped tape to the tube/tracer bundle with wire on 150 mm centers.
c) Finish fiberglass tape with weatherproofing mastic applied sufficiently thick to result in
a minimum dry film thickness of 2 mm.

Heat traced bridles shall be insulated in accordance with the insulation requirements specified for
piping.

8.11 Insulation Finish

All insulation terminations on piping and equipment shall be metal finished and weather tight.
Jacketing shall be fitted carefully around vessel and piping attachments which pass through it. Metal
sealant shall be applied to the extent necessary to prevent the entrance of water around
penetrations through the jacketing. Jacketing shall be installed to shed water.

Page 17 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

8.12 Requirements for Insulation Type PP

Personnel protection shall be provided if normal temperature of a surface exceeds 65ºC and if the
surface is in an area that is accessible to personnel. Accessible area is defined as an area in which
personnel regularly perform duties, including maintenance, during plant operation. Personnel
protection shall be provided to 2100 mm above grade or platforms and 600 mm horizontally from the
periphery of platforms, walkways, or ladders.

8.13 Additional Requirements for Insulation Type ET

Jacketing for insulation type ET (electrical traced) piping shall be installed with bands only. Screws
and rivets may damage the electrical tracing and are not acceptable fasteners for any jacketing
installed to finish insulation on electrically traced piping.

8.14 Requirements for COLD Insulation

The insulation shall be performed, and to the correct size. All voids must be filled with pieces of the
insulating material and sealed with waterproofing mastic. The insulation shall be held in place with
3/4" filament tape or with 1/2" stainless steel bands (maximum 12" centers).

(a) For services down to and including -30oF. (operating temperature): The insulation
joints shall be completely sealed with waterproofing mastic (Childers CP-30 or equal)
and a vapor barrier of FSK or ASJ jacket will be installed with all joints being sealed
with mastic (not tape).

(b) For services below -30oF. (Operating temperature): The insulation joints shall be
completely sealed with waterproofing mastic (Childers CP-30 or equal). The vapor
barrier shall consist of one of the two following methods:

(1) A coat of mastic, a layer of fab cloth (Childers Chill-Glass or equal) and another coat of mastic.

(2) A layer of Polyguard Insulrap 50 (or equal with Company approval), applied per manufacturer's
recommended procedure. Provide a minimum of 2" overlap width on all joints. Protect from sunlight.

All pipe fittings and flanges shall be completely insulated. All valves shall be insulated up to but not
including the packing gland or nut except for control valves with extended bonnets, these shall be
insulated to the bonnet flange. Insulation is to be sealed.

The insulation shall be covered with a 0.020" stucco embossed aluminum sheet with moisture barrier
facing. The covering for lines with an insulation diameter less than or equal to 6" is to be held in
place with 1/2" wide stainless steel bands on not more than 9" centers. The covering for lines greater
than 6" diameter is to be held in place with 1/2" stainless steel bands on not more than 12" centers.

Page 18 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

No screws are allowed in cold insulation. All joints in the covering should be lapped 2" minimum
(longitudinal and circumferential). The longitudinal joints of horizontal pipe and equipment shall be
within 45o of the bottom lapped top over bottom to shed water. All cut-outs are to be sealed with
caulking (Benjamin-Foster 95-44 or equal).

Insulation, barriers, metal, and mastic for 6" and larger handholes and Manways will be shipped
loose for field installation. The insulation and metal shall be pre-cut, assembled, and packed in a
tagged box for shipment.

For services above -50°F use standard T-type steel supports. Where the steel support penetrates
the protective covering shall be sealed with silicone caulking.

Minimum density of Polyurethane shall be 60kg/m3.

Equipment Saddles on horizontal vessels are to be insulated with 1" thick Armaflex (or equal) for a
distance below the insulation that is equal to four (4) times the thickness of the vessel insulation.

8.15 Protection of Materials and Work

Insulation materials subject to damage from dampness and harmful temperature extremes shall be
protected from time of delivery until weather protection is applied. Additionally, the following
conditions shall be observed:

a) Temporary warehouse facilities will be considered adequate protection during working


hours provided the materials are off the ground and are not subjected to damage due
to insufficient drainage and condensation.
b) Decking and covering tarps shall not be allowed except in extreme emergencies and
then only for short periods.
c) Adhesives, sealers and other materials furnished in a liquid state shall be stored
indoors and within temperature ranges required by the material manufacturer.

Insulation removed from storage shall be applied the same day and no unprotected insulation shall
remain on the job site overnight.

Every precaution shall be taken to see that each day's work has permanent weather protection
applied before the conclusion of work. Where this is impractical, temporary weather protection shall
be provided. Adequacy of such protection shall be the responsibility of the Contractor. The
Contractor shall submit proposed protection methods for Purchaser's review.

Insulation which becomes wet due to lack of or inadequate weather protection, either temporary or
permanent, shall be removed and replaced with dry insulation. Wet insulation shall be discarded
and not reused.

Page 19 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Table 8-1 INSULATION ATTACHMENT METHODS AND MATERIALS

INSULATION EQUIPMENT METHOD OF ATTACHMENT

Size Type Spacing


Form Material Type (Note 2 & 6
(Note 1) ) (Note 5)

300 mm on centers for


Pipe and
single/ outer layers and
equipment Over 750 mm Band "B"
450 mm on centers for all
shells
inner layers
Segments
Mineral 750 mm and
, Block (Note 4) (Note 4)
Wool under
and Lags
Equipment 300 mm maximum space
heads at knuckle
Over 750 mm Band "B"
radius - minimum 1 per
block
225 mm on centers for
Mineral Equipment single/ outer layers and
Slab Over 1800 mm Band "B"
wool shells 450 mm on centers for all
inner layers
Irregular
equipment
Mineral surfaces - botto
Mattress All Band "B" (Note 3)
wool m heads of
skirt supported
vessels

NOTES TO TABLE 8-1:


1. Size is the nominal pipe size or vessel outside diameter.
2. Materials are as follows:

Band "A": 13 mm by 0.50 mm fully annealed 18% Cr 8% Ni steel band.


Band "B": 19 mm by 0.50 mm fully annealed 18% Cr 8% Ni steel band.
Wire: 1.3 mm diameter fully annealed 18% Cr 8% Ni steel wire.
3. Attachment of high temperature insulation over irregular surfaces may be with wire if the use of
bands is impractical.
4. Adhesive bond outer circumference of disc to corresponding inner surface of pipe insulation.
Tape, wire or band (as required) pipe sections/segments to hold disc in place.

Page 20 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

5. Band or wire spacing specified as "300 mm maximum all layers" or "450 mm maximum all
layers" applies to 900 mm long insulation segments. Shorter lengths, such as 600 mm long V
grooved mineral wool slab requires two (2) bands or wires per section on all layers.
6. Unless noted otherwise, equipment insulated with fibrous type insulation does not require
insulation springs for bands securing insulation to the shell of equipment. For equipment
insulated with rigid block insulation, 100 mm long, flat springs are required for each band in
accordance with the following schedule:

Page 21 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Table 8-2 INSULATION FINISH REQUIREMENTS

OUTSIDE
EQUIPMENT OR PIPING DIAMETER INSULATION FINISH END LAP (Note 2)
(Note 7)

75 mm - longitudinal and
750 mm or less Flat metallic sheet
circumferential
Shells 76 mm pitch x 18 mm 2 corrugations - longitudinal
Over 750 mm depth corrugated
Vertical metallic sheet 75 mm - circumferential
Vessels
Gored flat metallic
Gores require a -75 mm lap at
Exposed Heads sheet, same thickness
All shell junction
as shell
Concealed Heads None Not applicable

Horizontal Shells and 75 mm - longitudinal and


All Flat metallic sheet
Vessels and Channels circumferential
Heat Gored flat metallic Gores require a 75 mm lap at
Exchangers Heads All
sheet shell junction
50 mm - longitudinal and
Straight Pipe, Tees NPS 24 or less Flat metallic sheet
circumferential
and Piping Branch
Connections Flat metallic sheet 75 mm - longitudinal and
Over NPS 24
(Note 4) circumferential
Gored cover End laps same as above for
fabricated from flat straight pipe - lap individual
Bent Pipe All
metallic sheet - same gores 50 mm along inside
thickness as pipe radius
Piping
Gored cover
fabricated from flat End laps as above for straight
Elbows All
metallic sheet - same pipe, etc.
thickness as pipe
NPS 24 or less Flat metallic sheet or 50 mm - all directions
Valves, Flanges and removable and
Reducers Over NPS 24 reusable insulation 75 mm - all directions
covers

Page 22 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Table 8-3 INSULATION FINISH REQUIREMENTS (CONT'D)


METHOD OF ATTACHMENT
LOCATION OF OUTSIDE
ITEM FINISH DIAMETER SECUREMENT
(Note 2) (Note 7) TYPE SPACING
(Note 1)
Less than
300 mm maximum centers (Notes 3, 4, 5)
1200 mm
Band "B"
Shells 300 mm maximum centers supported
1200 mm (Note 8)
radially with belt loops on 4.5 m centers
Vertical and larger
minimum 2 per band (Notes 3, 4 5)
Vessels
Screws
Exposed Heads 150 mm centers along gore laps
All (Notes 5 & 6)
Concealed Heads Not applicable
Horizontal Shells All Band "B" 225 mm maximum centers (Note 3)
Vessels
and Heat Heads and Screws
150 mm centers along gore laps
Exchangers Channels (Notes 5 & 6)

Straight Pipe, NPS 24 and


Band "A"
Piping Tees and branch less 225 mm maximum centers (Note 3)
connections Over NPS 24 Band "B"
Band fasten die-formed and gored elbow
covers at each circumferential end lap
over (or under) the adjacent weather
jacket. Fasten longitudinal heel and
throat laps on die-formed covers with
screws on 100 to 125 mm
Piping Elbows, Bent Band "A", centers - minimum 1 screw for the throat
Fittings, Pipe Screws lap and 3 screws for the heel lap. Fasten
Valves All both longitudinal and circumferential laps
and in the throat area of each gored segment
using a single screw. Fasten all gored
Flanges segment circumferential laps with 1 screw
per lap along the outside radius or heel of
the gored cover. (Note 9)

Band "A", 300 mm maximum centers, minimum


Valves, Flanges
2 per cylindrical section - screws on
and Reducers Screws 100 mm maximum centers along seams.

Page 23 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

NOTES TO TABLE 8-3:


1. Band material shall be as follows:

Band "A" - 13 mm x 0.5 mm annealed austenitic stainless steel


Band "B" - 19 mm x 0.5 mm annealed austenitic stainless steel
Belt loops shall be fabricated from the same material as the bands and shall be riveted to high
points of corrugations on 450 mm maximum centers.
2. Laps shall be oriented to shed water.
3. All circumferential laps shall be banded.
4. Vertical sheathing support shall be provided on all vertical vessels and vertical piping having
insulation outside diameters of 450 mm or more with the application of 13 mm by 0.5 mm
austenitic stainless steel "S-clips" installed on 450 mm maximum centers (minimum 2 clips per
sheet regardless of diameter).
5. Longitudinal laps in jacketing on vertical vessels shall be screw fastened on 150 mm centers.
Circumferential laps on all vessels shall not be screw fastened except at the head gore/shell
finish lap which requires circumferentially placed screws on staggered 150 mm nominal centers
and at the bottom of the shell jacketing which requires circumferentially placed screws on 150
mm nominal centers.
6. Convex equipment heads that have been insulated with a flat disc shall have the lapping
surfaces of the blind cover coated with silicone sealant prior to installation of the cover. Covers
on horizontal equipment shall have the lapped seam oriented to shed water.
7. Outside diameter refers to nominal pipe or equipment diameter.
8. Unless noted otherwise for individual equipment items, approximately 100 mm long jacket
banding springs (either double expansion spring units or compression spring assemblies) are
required for each band in accordance with the following schedule, regardless of insulation
material used on equipment shells:

9. Screws are not allowed for Insulation Type H3, N1 through N4, and NA through ND. Band shall
be used with a minimum of one band per gored segment.

Page 24 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Table 8-4 EXTENT OF INSULATION FOR PIPING AND EQUIPMENT


INSULATION TYPE IH PP ET
Heat Personnel
Application Description Heat Trace
Conservation Protection
Straight or Bent Pipe, YES YES YES
Pipe Unions, Expansion or Rotation Joints,
Slide Valves or Other Items Where
NO NO YES
Insulation Would Interfere with Normal
Operation
Flanged Pipe Fittings, Flanged Valves
(Excluding Relief and Control Valves),
NO NO
Flanged Orifice Sets, Piping Flanges YES
[Note 1] [Note 1]
Connected to Equipment Nozzles and
Flanged Special Items (i.e., Strainers)
Primary Piping for Instrument Connections,
NO NO YES
Sample Piping, Vent and Drain Piping
Relief Valves NO NO YES
Control Valves NO NO YES
Tower and Drum Shell and Head Surfaces YES NO YES
Heat Exchanger Shell and Fixed Rear
YES YES NA
Bonnet Surfaces
Heat Exchanger Channel, Channel Cover,
Channel Bonnet and Channel/Body Flange NO NO YES
Joints
Pump Casings NO NO NO
Compressors [Note 2] [Note 2] NO

NOTES TO TABLE 8-4:


[1] In Hot Oil Service & Cold insulation (only), Provide removable insulation covers for flanged
valves and flanges.
[2] Insulation shall be furnished in accordance with the equipment supplier's recommendations.

Page 25 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Table 8-5 INSULATION THICKNESSES (mm) FOR PIPING AND EQUIPMENT


HEAT CONSERVATION - TYPE H
{PRIVATE NORMAL/MAXIMUM OPERATING TEMPERATURE, ºC
}NOMINAL
PIPE SIZE
61- 101- 151- 201- 251- 301- 351- 401-
100 150 200 250 300 350 400 450
0.50 25.0 25.0 25.0 40.0 50.0 50.0 65.0 75.0
0.75 25.0 25.0 40.0 40.0 50.0 65.0 65.0 80.0
1.00 25.0 25.0 40.0 40.0 50.0 65.0 80.0 85.0
1.50 25.0 25.0 40.0 40.0 50.0 65.0 80.0 90.0
2.00 25.0 25.0 40.0 40.0 50.0 65.0 90.0 95.0
2.50 25.0 25.0 40.0 40.0 50.0 65.0 90.0 100.0
3.00 25.0 25.0 40.0 50.0 65.0 80.0 90.0 105.0
4.00 25.0 25.0 40.0 50.0 65.0 80.0 90.0 110.0
5.00 25.0 25.0 40.0 50.0 65.0 80.0 100.0 115.0
6.00 25.0 25.0 40.0 50.0 65.0 90.0 100.0 120.0
8.00 25.0 25.0 40.0 50.0 65.0 90.0 100.0 125.0
10.00 25.0 25.0 40.0 50.0 65.0 90.0 115.0 130.0
12.00 25.0 25.0 40.0 50.0 80.0 90.0 115.0 135.0
14.00 30.0 30.0 40.0 50.0 80.0 100.0 115.0 140.0
16.00 30.0 30.0 40.0 65.0 80.0 100.0 130.0 140.0
18.00 30.0 30.0 40.0 65.0 80.0 100.0 130.0 145.0
20.00 30.0 30.0 40.0 65.0 80.0 100.0 130.0 145.0
24.00 40.0 30.0 40.0 65.0 80.0 100.0 140.0 150.0
30.00 40.0 30.0 40.0 65.0 90.0 115.0 140.0 155.0
36.00 40.0 30.0 50.0 65.0 90.0 115.0 140.0 160.0
42.00 40.0 50.0 65.0 65.0 90.0 115.0 155.0 160.0
48.00 40.0 50.0 65.0 80.0 90.0 130.0 155.0 165.0
54.00 40.0 50.0 65.0 80.0 90.0 130.0 155.0 165.0
60.00 40.0 50.0 65.0 80.0 100.0 130.0 165.0 165.0
72.00 40.0 50.0 65.0 80.0 100.0 130.0 165.0 170.0
84.00 40.0 50.0 65.0 80.0 100.0 140.0 180.0 180.0
96.00 40.0 50.0 65.0 80.0 100.0 140.0 180.0 180.0
108.00 40.0 50.0 65.0 80.0 100.0 140.0 180.0 180.0
120.00 40.0 50.0 65.0 80.0 115.0 140.0 190.0 190.0
*144.00 40.0 50.0 65.0 80.0 115.0 155.0 190.0 190.0
* Insulation thickness for items having diameters above 144 inches (3,560 mm) shall be identical to the
thickness required for 144 inch diameter.

Page 26 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Table 8-6 INSULATION THICKNESSES (mm) FOR PIPING AND EQUIPMENT


PERSONNEL PROTECTION - TYPE PP
NOMINAL NORMAL/MAXIMUM OPERATING TEMPERATURE, ºC
PIPE SIZE 61- 101- 151- 201- 251- 301- 351- 401-
100 150 200 250 300 350 400 450
0.50 25.0 25.0 25.0 25.0 40.0 40.0 50.0 75.0
0.75 25.0 25.0 25.0 40.0 40.0 50.0 65.0 80.0
1.00 25.0 25.0 25.0 40.0 40.0 50.0 65.0 85.0
1.50 25.0 25.0 25.0 40.0 40.0 50.0 65.0 90.0
2.00 25.0 25.0 25.0 40.0 50.0 65.0 80.0 95.0
2.50 25.0 25.0 25.0 40.0 50.0 65.0 80.0 100.0
3.00 25.0 25.0 25.0 40.0 50.0 65.0 80.0 105.0
4.00 25.0 25.0 25.0 40.0 50.0 65.0 90.0 110.0
5.00 25.0 25.0 40.0 40.0 65.0 80.0 90.0 115.0
6.00 25.0 25.0 40.0 50.0 65.0 80.0 90.0 120.0
8.00 25.0 25.0 40.0 50.0 65.0 80.0 100.0 125.0
10.00 25.0 25.0 40.0 50.0 65.0 90.0 100.0 130.0
12.00 25.0 25.0 40.0 50.0 65.0 90.0 115.0 135.0
14.00 30.0 30.0 40.0 50.0 80.0 90.0 115.0 140.0
16.00 30.0 30.0 40.0 50.0 80.0 100.0 130.0 140.0
18.00 30.0 30.0 40.0 50.0 80.0 100.0 130.0 145.0
20.00 30.0 30.0 40.0 65.0 80.0 100.0 130.0 145.0
24.00 40.0 30.0 40.0 65.0 80.0 100.0 140.0 150.0
30.00 40.0 30.0 40.0 65.0 90.0 115.0 140.0 155.0
36.00 40.0 30.0 50.0 65.0 90.0 115.0 140.0 160.0
42.00 40.0 50.0 65.0 65.0 90.0 115.0 155.0 160.0
48.00 40.0 50.0 65.0 80.0 90.0 130.0 155.0 165.0
54.00 40.0 50.0 65.0 80.0 90.0 130.0 155.0 165.0
60.00 40.0 50.0 65.0 80.0 100.0 130.0 165.0 165.0
72.00 40.0 50.0 65.0 80.0 100.0 130.0 165.0 170.0
84.00 40.0 50.0 65.0 80.0 100.0 140.0 180.0 180.0
96.00 40.0 50.0 65.0 80.0 100.0 140.0 180.0 180.0
108.00 40.0 50.0 65.0 80.0 100.0 140.0 180.0 180.0
120.00 40.0 50.0 65.0 80.0 115.0 140.0 190.0 190.0
*144.00 40.0 50.0 65.0 80.0 115.0 155.0 190.0 190.0
* Insulation thickness for items having diameters above 144 inches (3,560 mm) shall be identical to the
thickness required for 144 inch diameter.

Page 27 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Table 8-7 INSULATION THICKNESSES (mm) ELECTRICAL HEAT TRACING (ET)-


MINERAL WOOL

{PRIVATE NORMAL/MAXIMUM OPERATING TEMPERATURE, C


}NOMINA
L PIPE
SIZE
38- 101- 151- 201-
100 150 200 250
0.50 30.0 30.0 30.0 40.0
0.75 30.0 30.0 40.0 40.0
1.00 30.0 30.0 40.0 40.0
1.50 30.0 30.0 40.0 40.0
2.00 30.0 30.0 40.0 40.0
2.50 30.0 30.0 40.0 40.0
3.00 30.0 30.0 40.0 50.0
4.00 30.0 30.0 40.0 50.0
5.00 30.0 30.0 40.0 50.0
6.00 30.0 30.0 40.0 50.0
8.00 30.0 30.0 40.0 50.0
10.00 30.0 30.0 40.0 50.0
12.00 30.0 30.0 40.0 50.0
14.00 30.0 30.0 40.0 50.0
16.00 30.0 30.0 40.0 65.0
18.00 30.0 30.0 40.0 65.0
20.00 30.0 30.0 40.0 65.0
24.00 30.0 30.0 40.0 65.0
30.00 30.0 30.0 40.0 65.0
36.00 30.0 30.0 50.0 65.0
42.00 30.0 30.0 50.0 65.0
48.00 30.0 30.0 50.0 65.0
54.00 30.0 30.0 50.0 65.0
60.00 30.0 30.0 50.0 80.0
72.00 30.0 40.0 50.0 80.0
84.00 30.0 40.0 50.0 80.0
96.00 30.0 40.0 50.0 80.0
108.00 30.0 40.0 50.0 80.0
120.00 30.0 40.0 50.0 80.0
*144.00 30.0 40.0 50.0 80.0

Page 28 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

* Insulation thickness for items having diameters above 144 inches (3,560 mm) shall be identical to the
thickness required for 144 inch diameter.
Table 8-8 INSULATION THICKNESSES (mm) FOR PIPING AND EQUIPMENT
COLD INSULATION- TYPE C (POLY URETHANE FOAM)

{PRIVATE }NOMINAL NORMAL OPERATING TEMPERATURE, C


PIPE SIZE
20- 9- -1 - -11 - -21 - -31 - -41 - -51 - -61 - -71 - -81 - -91 - -101 -
10 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110
0.50 25.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 60.0 65.0 70.0 75.0
0.75 25.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0 70.0 75.0 75.0
1.00 25.0 25.0 30.0 40.0 45.0 50.0 55.0 60.0 65.0 70.0 75.0 75.0 80.0
1.50 25.0 30.0 35.0 40.0 45.0 55.0 60.0 65.0 70.0 75.0 80.0 85.0 90.0
2.00 25.0 30.0 35.0 45.0 50.0 55.0 60.0 65.0 75.0 80.0 85.0 90.0 90.0
2.50 25.0 30.0 35.0 45.0 50.0 60.0 65.0 70.0 75.0 80.0 85.0 90.0 95.0
3.00 25.0 30.0 40.0 45.0 55.0 60.0 65.0 75.0 80.0 85.0 90.0 95.0 100.0
4.00 25.0 30.0 40.0 50.0 55.0 60.0 70.0 75.0 85.0 90.0 95.0 100.0 105.0
5.00 25.0 30.0 40.0 50.0 55.0 65.0 70.0 80.0 85.0 95.0 100.0 105.0 110.0
6.00 25.0 35.0 40.0 50.0 60.0 65.0 75.0 80.0 90.0 95.0 100.0 110.0 115.0
8.00 25.0 35.0 45.0 50.0 60.0 70.0 80.0 85.0 95.0 100.0 105.0 115.0 120.0
10.00 25.0 35.0 45.0 55.0 60.0 70.0 80.0 90.0 95.0 105.0 110.0 120.0 125.0
12.00 25.0 35.0 45.0 55.0 65.0 75.0 80.0 90.0 100.0 105.0 115.0 120.0 130.0
14.00 25.0 35.0 45.0 55.0 65.0 75.0 85.0 90.0 100.0 110.0 115.0 125.0 130.0
16.00 25.0 35.0 45.0 55.0 65.0 75.0 85.0 95.0 100.0 110.0 120.0 125.0 130.0
18.00 25.0 35.0 45.0 55.0 65.0 75.0 85.0 95.0 105.0 110.0 120.0 125.0 135.0
20.00 25.0 35.0 45.0 55.0 65.0 75.0 85.0 95.0 105.0 115.0 120.0 130.0 135.0
24.00 25.0 35.0 45.0 55.0 65.0 80.0 90.0 95.0 105.0 115.0 125.0 130.0 140.0
30.00 25.0 35.0 45.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 125.0 135.0 145.0
36.00 25.0 35.0 45.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 145.0
42.00 25.0 35.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0
48.00 25.0 35.0 50.0 60.0 70.0 80.0 90.0 105.0 115.0 125.0 135.0 140.0 150.0
54.00 25.0 35.0 50.0 60.0 70.0 80.0 95.0 105.0 115.0 125.0 135.0 145.0 150.0
60.00 25.0 35.0 50.0 60.0 70.0 80.0 95.0 105.0 115.0 125.0 135.0 145.0 155.0
72.00 25.0 35.0 50.0 60.0 70.0 85.0 95.0 105.0 115.0 125.0 135.0 145.0 155.0
84.00 25.0 35.0 50.0 60.0 70.0 85.0 95.0 105.0 115.0 125.0 135.0 145.0 155.0
96.00 25.0 35.0 50.0 60.0 70.0 85.0 95.0 105.0 120.0 130.0 140.0 150.0 155.0
108.00 25.0 35.0 50.0 60.0 70.0 85.0 95.0 105.0 120.0 130.0 140.0 150.0 160.0
120.00 25.0 35.0 50.0 60.0 70.0 85.0 95.0 105.0 120.0 130.0 140.0 150.0 160.0
144.00 25.0 35.0 50.0 60.0 70.0 85.0 95.0 110.0 120.0 130.0 140.0 150.0 160.0

SINGLE LAYER DOUBLE LAYER TRIPLE LAYER

Page 29 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

9. FIGURE

9.0 FIGURE

Page 30 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE 1 - TYPICAL BLOCK OR SLAB INSULATION


ON VERTICAL VESSELS WITH OUTSIDE
DIAMETERS OVER 750 mm

Page 31 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE 2 - TYPICAL PIPE & BLOCK OR SLAB


INSULATION ON VERTICAL VESSELS WITH
OUTSIDE DIA 750 mm & LESS

Page 32 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE 3 - BLOCK INSULATION ON HORIZONTAL VESSELS WITH OUTSIDE


DIAMETERS OVER 750 mm

Page 33 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE 4 - PIPE COVERING AND BLOCK INSULATION ON DOUBLE PIPE HEAT


EXCHANGERS

Page 34 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE 5 - PIPE COVERING OR BEVELED LAGS ON SHELL AND TUBE HEAT


EXCHANGERS

Page 35 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE 6 - SECTIONAL OR SEGMENTAL PIPE INSULATION

Page 36 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE 7 - INSULATED LINES WITH PIPE SHOES

Page 37 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE 8 - BUTT WELDING TEE

FIGURE 9 - WELDING CAP

Page 38 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE 10 -TYPICAL SUPPORT LOCATIONS AT FLANGES

Page 39 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE 11- TYPICAL SUPPORT LOCATIONS AT ELBOWS

L
(TABLE 3-3)

FIGURE 12-
TYPICAL SUPPORT LOCATIONS AT BRANCH CONNECTIONS OR TEE OUTLETS

Page 40 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Page 41 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Page 42 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

HEAD INSULATION DETAIL FOR


VESSELS OVER 750 mm OD

Page 43 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

Page 44 of 45
CLIENT: PAKISTAN PETROLEUM LIMITED DOC. NO. 32618-195-05-SP-003
REV. A
PROJECT: GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-1 (GPF-II)
TITLE : SPECIFICATION FOR INSULATION

FIGURE -13 TYPICAL INSULATION COVER DESIGN

Page 45 of 45