SIEMENS Cone by Fedex Tracing 51 SOS es
March 13, 2012 SD-L-SEI-TCH-0006
CNS#: 0301
Termochilca S.A.C.
Ay. La Encalada 1388 Off. 601
Santiago de Surco
Lima 33, Péru
Attn: Ms. Carmen Tatiana Alegre Chaloo
Gerente General
Re: Lump Sum, Turkey, Engineering, Procurement and Construction Contract, dated as of March
24th, 2011 and any subsequent amendments ("Contract") between TERMOCHILCA S.A.C.
(‘Owner’), Scotiabank Peru S.A.A. (‘Bank’) and Siemens Energy Inc. ("Contractor") for Phase 1
of the Santo Domingo de los Olleros Power Project
Subject: _Monthly Progress Report for Period Ending February 29, 2012,
Dear Ms. Alegre:
Article 2.3.2 of the Contract requires Contractor to submit a monthly report for the progress of the Project.
Since only 22 days elapsed between the Commencement Date and the end of the reporting period, it is
impractical for Siemens to issue a report in the format stated in Appendix M. However, we do feel itis
necessary to provide a report of the major activities that occurred under the Reservation Agreement as
‘well as after the Commencement Date. To this end, attached please find an abbreviated progress report
for the Santo Domingo project. A full report will be issued in April 2012,
Ifyou have any questions, please do not hesitate to contact me.
Sincerely,
———
Richard G. Marron, PMP
General Project Manager
tachment: (4 Pages)
Electronic Delivery
Carmen Tatiana Alegre Chalco mall to: talegre@termochiica.com
José Antonio Zolla mail to: jzolla@termochilca.com
Jorge Mendoza Mujica mail to: jmendoza@termochilca.com
Document Control mail to: documentcontrol@termochilca.com
Siemens Energy In 4400 Astoya tat
rlando, #232626
sa