Download as pdf
Download as pdf
You are on page 1of 1
SIEMENS Cone by Fedex Tracing 51 SOS es March 13, 2012 SD-L-SEI-TCH-0006 CNS#: 0301 Termochilca S.A.C. Ay. La Encalada 1388 Off. 601 Santiago de Surco Lima 33, Péru Attn: Ms. Carmen Tatiana Alegre Chaloo Gerente General Re: Lump Sum, Turkey, Engineering, Procurement and Construction Contract, dated as of March 24th, 2011 and any subsequent amendments ("Contract") between TERMOCHILCA S.A.C. (‘Owner’), Scotiabank Peru S.A.A. (‘Bank’) and Siemens Energy Inc. ("Contractor") for Phase 1 of the Santo Domingo de los Olleros Power Project Subject: _Monthly Progress Report for Period Ending February 29, 2012, Dear Ms. Alegre: Article 2.3.2 of the Contract requires Contractor to submit a monthly report for the progress of the Project. Since only 22 days elapsed between the Commencement Date and the end of the reporting period, it is impractical for Siemens to issue a report in the format stated in Appendix M. However, we do feel itis necessary to provide a report of the major activities that occurred under the Reservation Agreement as ‘well as after the Commencement Date. To this end, attached please find an abbreviated progress report for the Santo Domingo project. A full report will be issued in April 2012, Ifyou have any questions, please do not hesitate to contact me. Sincerely, ——— Richard G. Marron, PMP General Project Manager tachment: (4 Pages) Electronic Delivery Carmen Tatiana Alegre Chalco mall to: talegre@termochiica.com José Antonio Zolla mail to: jzolla@termochilca.com Jorge Mendoza Mujica mail to: jmendoza@termochilca.com Document Control mail to: documentcontrol@termochilca.com Siemens Energy In 4400 Astoya tat rlando, #232626 sa

You might also like