This document is a final monitoring form for a NSTP2 project from July 4, 2022 to July 25, 2022. It details the schedule of activities conducted which included transporting seed bags, singing, soil transfer, seed planting, and CPR training. Photos were attached of each activity. The implementer is rated on a scale of 1 to 5 on criteria such as working with the community, critical thinking, sustainability, and documentation. The total score is 70/70. The evaluator is the implementer's group leader.
This document is a final monitoring form for a NSTP2 project from July 4, 2022 to July 25, 2022. It details the schedule of activities conducted which included transporting seed bags, singing, soil transfer, seed planting, and CPR training. Photos were attached of each activity. The implementer is rated on a scale of 1 to 5 on criteria such as working with the community, critical thinking, sustainability, and documentation. The total score is 70/70. The evaluator is the implementer's group leader.
This document is a final monitoring form for a NSTP2 project from July 4, 2022 to July 25, 2022. It details the schedule of activities conducted which included transporting seed bags, singing, soil transfer, seed planting, and CPR training. Photos were attached of each activity. The implementer is rated on a scale of 1 to 5 on criteria such as working with the community, critical thinking, sustainability, and documentation. The total score is 70/70. The evaluator is the implementer's group leader.
Program: NSTP2 Home Address: 7D Datuin Compound, Ambiong Rd., Aurora HIll Partner (if any): Start date: July 04, 2023 Completion date: July 25, 2023
Schedule/date/time Activity/accomplishment Attested by: name
(detailed narration of and signature activities) June 19-20, 2023 Transporting Seed Bags
June 26, 2023 Singing of Louisian Hymn
June 27, 2023 Transferring of soil in seed
bags July 11, 2023 Seed planting
July 14, 2023 Basic Life Support (BLS)
Training July 20, 2023 CPR Demonstration
Attach at least two (2) photos of every activities/accomplishments.
June 19-20, 2023
June 26, 2023
June 27, 2023
July 11, 2023
July 14, 2023
July 20, 2023
Rubrics for Performance and Project Rating (For monitoring form) ITEM 5 4 3 2 1 1. Work with the people (family/ community) in making the project but expected that the student worked 90% in doing the project. 2. Included community people (family members) in activities like planning and implementation. 3. Used varied techniques for the attainment of the project objectives. 4. Program is appropriate to learning objectives of the students. 5. Encouraged critical thinking to the project/ activity. 6. Sustainability of the program. 7. Materials used for demonstrations and other works were adequate. 8. Program can be maintained with minimal use of other resources. 9. Made use of local resources and personnel during project implementation. 10. Activities are cost-effective and well budgeted. 11. Alliance and partners were able to help in project implementation. 12. Communication and information are well served to the participants and partners in the projects/ activities. 13. Documentations are recorded and kept. 14. Monitoring and evaluation are continuously conducted. Total: 70/70
Evaluated by: James Aaron Pineda Castro Name and Signature of The evaluator (Attach on this page a photocopy of valid ID, if possible)
Relationship to the implementer/student: Group leader