DAILY MAINTENANCE JOB ASSIGNMENT REPORT (ELECTRICAL SECTION)

DATE : Monday, July 24, 2023 MONTH: JULY 2023 AVAILABLE ELECTRICAL STAFF: (5) TECHNICIANS + 2GW/2SS

Staff OT
Notification / Time Frame Total Manpower Hours Helper OT
Assigned Hrs
No P Back log Unit Defect/Task Description Finding Action Taken PTW No Technician
Status Remark
Work Order Start Finish MPG UE Buruj Plan Actual Actual Actual

96000132335
Sluicing pump A cannot stat from switch
Lay new control cables with proper way &
1 C remote and local & (Sub-Job From C&I) Spray Group of common cable short circuits A011495 All Technicians 0800 1700 5 2 2 64
commissioning + Testing
69000124157
Pump A Cannot start from Remote

96000133451
XX Coal Handling System C2 cannot start by Awang Roslan &
2 CH Checking and troubleshooting
Naong
0800 1200 2 8
local and remote.
69000125142

7 ,

Remarks GENERAL WORKERS(Buruuj) SEMI- SKILLED(UE) STATUS STATUS

Annual Leave: OB OB OB OBSERVATION OHOT ON HOLD OTHERS


Mohd.Arif (√) Joshua Achai (√)
Sick leave: JT JT JT JOB TRANSFER OHSD ON HOLD SHUTDOWN
Boniface (√) Mohd Ekhfhan Syafiq (√)
Emergency leave: C C C CLEAR OHOSP ON HOLD SPARE PART

Course: PM PM PM PREVENTIVE MAINTENANCE IP IN PROGRESS

Others

Prepared By: Verified By:

NYIKOH MAMBANG ANTAU GANING (E&I ENGINEER)