PROCESS SAFETY MONITORING PLAN OGF – HSEQ – 035(01)

PROCESS SECTION
Gas Processing Plant UCH

Sr. Type of Parameters to be Reference Acceptable Measurement Measurement


Location Responsible Related record
No Measurement measured Standard Limit Frequency Equipment

Diesel Fire Pumps


Mine Act 1923,
Fire Engine Checklist
Diesel Fire Pumps Operability of System Mines Rule 1952, Satisfactory Fortnightly By Operation Process
1. Shed
NFPA 25
OGC/UCH-PROC-001(00)

Passive H2S Mine Act 1923, H2S Dose Checklist


Calibration & functional
dosimeter and Mines Rule 1952, Satisfactory Plant Need basis Operational Process
2. reliability
badges NFPA 25 OGC/UCH-PROC-002(00)

Mine Act 1923, Plant Stairs inspection


Physical & operational Check list
Stair cases Mines Rule 1952, Satisfactory Plant Quarterly Operational Process
3. reliability
NFPA 25 OGC/UCH-PROC-003(00)

Chemical safety and


Mine Act 1923,
Chemical Safety consumption checklist.
Operability of System Mines Rule 1952, Satisfactory Plant Daily/Need basis Laboratory Results Process
4. and Consumptions
NFPA 25
OGC/UCH-PROC-004(01)

5. Plant Parameters Operability of System Mine Act 1923, Satisfactory Plant Daily Operational Process SCADA/Dehydration Unit
monitoring Mines Rule 1952, /Laboratory Results log sheet
NFPA 25 OGC/UCH-PROC-005A(00)
H2S Removal plant log
sheet
OGC/UCH-PROC-005B(00)
Europeon Gas Turbine -
01 Monitoring Log sheet
OGC/UCH-PROC-006A(00)
Europeon Gas Turbine -
02 Monitoring Log sheet
OGC/UCH-PROC-006B(00)
Europeon Gas Turbine -
03 Monitoring Log sheet
OGC/UCH-PROC-006C(00)
Europeon Gas Turbine -
04 Monitoring Log sheet
OGC/UCH-PROC-006D(00)
Low Pressure Boiler-1
Monitoring Log Sheet
OGC/UCH-PROC-007A(00)
Low Pressure Boiler-2
Monitoring Log Sheet
OGC/UCH-PROC-007B(00)
PROCESS SAFETY MONITORING PLAN OGF – HSEQ – 035(01)
PROCESS SECTION
Gas Processing Plant UCH

Low Pressure Boiler-3


Monitoring Log Sheet
OGC/UCH-PROC-007C(00)
High Pressure Boiler-1
Monitoring Log Sheet
OGC/UCH-PROC-008A(00)
High Pressure Boiler-2
Monitoring Log Sheet
OGC/UCH-PROC-008B(00)

Mine Act 1923,


PTW Log Execution & Control Mines Rule 1952, Satisfactory CCR-1 Daily Job Activities Process OGC/UCH-PROC-031(01)
6.
NFPA 25

 
 

Prepared by Verified by Approved by


Mr. Moeen Nazir Mr. Abdul Rasheed Watto
I/C Shift (I/C Process Uch) (Field Manager UGF)