Cost Of Open Pit Mining Operations
Reference: 1988 cost estimation of a 4,5 Mtpa surface mine. Capital cost @10% discount
Why Is Transportation That Expensive?
𝑚
𝐸 = 𝑚𝑔ℎ = 1000 𝑘𝑔 ×9.8 ! ×1 𝑚 = 9.8 𝑘𝐽 = 2.72 𝑊ℎ
𝑠
It is not possible to use less energy to lift something up on this planet. Converted into money and
assuming that one kWh of electrical energy costs about 0,07 US$, this means lifting one tonne costs a
minimum of 0,02 $-cents per metre, assuming that any other losses are nil – which they are not.
Why Is Transportation That Expensive?
To move this mass by conveyor requires knowledge of a whole host of data including:
¡ speed,
¡ belt type,
¡ length,
¡ gradient,
¡ idler and pulley configurations,
¡ material bulk density, etc
the only extra weight it has to lift is parts of the belt itself.
Compared to this, minimum operating costs of lifting by a diesel engine driven mining truck (with its
own empty weight mass) at a fuel price of 1,1 US$/litre will be more than double that of a conveyor.
Why Is Transportation That Expensive?
Two main sources of losses in haulage can be identified: “tare” and “drag”.
Tare is the additional weight of the equipment/machinery required to move the metric tonne
vertically by one metre.
Drag is the additional force that acts against this transportation like friction, inertia …
In addition, a combustion engine can only transfer <50% of the chemical potential energy stored in
fuel into mechanical energy, with mining trucks accounting for only an estimated 25-35%.
In the case of trucks, this small amount of converted energy then has to bear further drive train
losses before moving the actual tire which then encounters the road surface drag items above.
One is to find structures or materials that are very light, the other possibility is to utilize the
transport vessel more efficiently.
In-pit Crushing And Conveying (IPCC)
Conveyors in mining make use of both solutions, as the only tare to be moved is the weight of the
belt itself in addition the mass being moved.
However, with more than obvious cost/energy benefits, why has the mining industry not adopted the
system of conveying inside the pit?
The answer: the industry is familiar with trucks; does not like change; there is no commercially
operating mine planning software for conveyors, yet packages abound for truck scheduling (e.g.
Surpac, Xpac, Vulcan, Orelogy, etc.); conveying is not taught as a mining haulage alternative at most
mining engineering universities; and lastly, conveyors are seen as an inflexible system within a changing
environment which is a disadvantage that can be overcome by an IPCC installation.
The big difference between truck haulage operations and conveyor haulage operations inside pits is
that the conveyor operation has to follow the plan or will fail whilst the truck operation can more
easily ignore the plan (e.g. chase high grade as required for altered commodity cycles).
In-pit Crushing And Conveying (IPCC)
A maximum particle size smaller than 20% of the belt width and a
maximum of 350 mm-sized grains due to the high impact energy of bigger
particles and the interlocking of larger particles at conveyor transfer points,
leading to potentially massive blockages and associated downtime if larger
than 350 mm.
Types Of In-pit Crushing And Conveying (IPCC)
Fixed crusher within the IPCC system
Semi-mobile or semi-fixed crusher within the IPCC system
Fully mobile crusher within the IPCC system
FIXED CRUSHER
Fully mobile systems can be used in different ways which have to be determined in advance
by the mining plan.
When crushing is done inside a pit, long-term strategies have to be developed as to how and where
the crushed rock exits the mine. In some mining applications this is obvious and supported by data
from similar operations, but in many cases this can be difficult due to the following factors:
Making the correct decision during the planning stage is not only a technical but also an economic challenge.
Pit-exiting Strategies
Trucking ramps – although an obvious conveying route when
adding conveyors to an existing mine – are often limited to a
gradient of 10%. This lengthens the conveying route in
comparison to a conveyor ramp that from a practical
viewpoint, be built up to 25% (consider ease of maintenance,
but theoretically can be up to 18 degrees without material
roll-back issues) and thus shortens the needed conveyor
length by at least 2,5 times.
But not only is the belt conveyor’s length shortened; the
power demand is reduced as well by this and other reasons
like the decrease in friction between conveyor belt and
idlers/frames, fewer idlers resulting in lower rolling resistance
and less belt indentation.
PIT-EXITING STRATEGIES
At 25% inclination only
about 85% of the
operational
power(cost) is needed
compared to an
inclination of 10%
A shorter conveyor
line reduces the capital
expenditure and also
the operating expenses.
Ensuring effective
Power demand for 100 m lifting at 10 000 t/h drainage control
Pit-exiting Strategies
Conveying through tunnels is a viable alternative especially for deep open-pit mines. The conveyor is
out of sight and does not consume space within the pit shell. Obviously, a tunnel is a fixed building so
the mine planning has to be very dedicated to this flexibility-reducing fact.
Near the pit shell the tunnel should be built at a horizontally steep angle towards the mining face to
ease the pushback-operation at the tunnel entry.
Pit-exiting Strategies
Aside from these conveying strategies, other aspects of surface mining include:
None of the above have been developed for high capacity demands
REFERENCE