Application

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Annexure II

Application for Renewable Generating System Connectivity Under Net Billing Arrangement or
Net Metering Arrangement
To,
The AEN (O&M),

Application No.
Date

1 Name of Applicant
2 Address of Applicant
3 Service Connection Number
4 Service Connection Tariff
5 Telephone Number(s)
6 Email Id
7 Renewable Energy Generating System Capacity (Kilo Watts)

8 Renewable Energy Generating System Grid Inverter make


and type

9 Renewable Energy Generating System grid inverter has


automatic isolation protection (Y/N)?

10 Has a Renewable Energy Generating System Meter been


installed (Y/N)?

11 Expected Date of Commissioning of Renewable Energy


System.

12 Details of test certificates Renewable Energy Generating


System/Inverter for standards required under the
regulations

Signature of Applicant:
Date:
Acknowledgement
Received an Application from ……………………………………………. for a Renewable Energy Net Billing
or Net Metering connection/installation Renewable Energy generating System of capacity of
………………………….. Kw as per details below:

Name:
Date:
Service Connection Number:
Application Registration No.:
Renewable Energy generating system capacity:

Name of Officer:
Signature:
Designation/ (Ajmer Discom)

You might also like