Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

SRI DATAI-CHM JV SDN.BHD.

201701004643 (1218808-T)
FORMERLY KNOWN AS SRI DATAI-CHEC JV SDN. BHD.
PACKAGE B1: PROPOSED CONSTRUCTION OF HIGHWAY FROM SEBUYAU
TO LINGGA, SAMARAHAN AND SRI AMAN DIVISION Doc. No.: QA-18
PROJECT TITLE:
(CONTRACT NO: PWD/HO/B113/2020) Rev: 00
To: Transmittal No.:
Superintending Officer Representatives (Consultant) SSTR-SCJV-PB01-TML-01131
Unit Head, Coastal & Second Trunk Road Unit (CSTRU)
Jabatan Kerja Raya, Sarawak

From: Date:
SRI DATAI-CHM JV SDN BHD 02/03/2023

No. Reference No. Title / Description Rev. No. Qty


SSTR-SCJV-PB01-MEMO- Site Memo - Proposal for Changing Second Layer of
1 00 1
00070 Reinforcement Layer from Sand to Soil

Purpose for Issuance:


For Implementation √ For Approval For Construction For Review
For Information For Comment For Copy As Requested
Others (Please State):
Comment:

Issued by: Acknowledged and Received by:

_________________________ _________________________
(Signed and Company Seal) (Signed and Company Seal)
Name: Sharonica Diliu Name:
Date: 02/03/2023 Date:
Please sign and return this transmittal note to sender as evidence of receipt.
SRI DATAI-CHM JV SDN BHD
PACKAGE B1: PROPOSED CONSTRUCTION OF HIGHWAY FROM Doc. No: QA/022
SEBUYAU TO LINGGA, SAMARAHAN AND SRI AMAN DIVISION
Project Title:
Rev: 01
(CONTRACT NO: PWD/HO/B113/2020)

SITE MEMO
TO : Mr. Soo Chen Yong Ref: SSTR-SCJV-PB01-MEMO-00070
ATTN :- Date : 02/03/2023

SUBJECT : Proposal for Changing Second Layer of Reinforcement Layer from Sand to Soil

Reference is made to the above-mentioned matter.


Further to our RSG monitoring summary record, the actual settlement monitoring results show that the value
of the settlement in most road sections is far less than the expected settlement value of the design. For
details, please see RSG Monitoring Report.
Therefore, most sections of the originally designed upper backfill sand layer can be changed to backfill soil
to reduce the costs, we propose to change second layer of reinforcement layer from sand to soil (for detail
please see the Appendix 1).
According to the above proposal, the backfill sand will be reduced by 170,000 m3 and backfill soil will be
increased by 170,000 m3. According to the principle of Engineering Value, we are willing to share the cost
saving with you.
We are willing to share detailed geotechnical engineering calculation and evaluation report with you if you
consider this proposal.
Your consideration to the above-mentioned subject is highly appreciated.
Thank you.

Sign by: Received by:

_______________________________ ______________________________

Yuan Huiming
Project Manager

Date: 02/03/2023 Date:

CC: 1. Sri Datai – CHM JV S/B 3. KTA – RE TEAM


Attn: Mr Soo Jin Ai Atten: Mr. Chong Kok Fung
2. KTA – RE TEAM 4. Sri Datai – CHM JV S/B
Atten: Mr. Kelvin Wong Atten: Mr Jiang Yuanchao
APPENDIX 1
P1a/P2a/P3a/P5a
5000 COUNTER BERM 5000 COUNTER BERM
COMPACTED SUITABLE FILL
FRL+"X" 2000
2 2
1 1
HIGH STRENGTH GEOTEXTILE HIGH STRENGTH GEOTEXTILE
CAPPING LAYER CAPPING LAYER

0
300
STABILIZATION GEOTEXTILE STABILIZATION GEOTEXTILE
Previous Section
P1a/P2a/P3a/P5a
COUNTER BERM
COMPACTED SUITABLE FILL
COUNTER BERM
FRL+"X"
2000
2 2 1947
1 1
HIGH STRENGTH GEOTEXTILE HIGH STRENGTH GEOTEXTILE
CAPPING LAYER CAPPING LAYER

200
300
STABILIZATION GEOTEXTILE STABILIZATION GEOTEXTILE
Proposed Section
APPENDIX 1
Previous Section P6a
COMPACTED SUITABLE FILL
14000 COUNTER BERM 14000 COUNTER BERM
FRL+"X"
2 2
8000 6000 6000 8000
1 1
HIGH STRENGTH GEOTEXTILE HIGH STRENGTH GEOTEXTILE
CAPPING LAYER CAPPING LAYER
200
300
STABILIZATION GEOTEXTILE COMPACTED SUITABLE FILL STABILIZATION GEOTEXTILE
Proposed Section P6a
COMPACTED SUITABLE FILL
14000 COUNTER BERM 14000 COUNTER BERM
FRL+"X"
2 2
8000 6000 6000 8000
1 1
1947 1947
HIGH STRENGTH GEOTEXTILE
HIGH STRENGTH GEOTEXTILE

200
600/50

300
STABILIZATION GEOTEXTILE COMPACTED SUITABLE FILL STABILIZATION GEOTEXTILE
APPENDIX 1
Previous Section P9a
COMPACTED SUITABLE FILL
14000 COUNTER BERM 14000 COUNTER BERM
FRL+"X"
2 2
6000 8000 8000 6000
1 1
HIGH STRENGTH GEOTEXTILE HIGH STRENGTH GEOTEXTILE
HIGH STRENGTH GEOTEXTILE HIGH STRENGTH GEOTEXTILE
500 500

CAPPING LAYER CAPPING LAYER


STABILIZATION GEOTEXTILE STABILIZATION GEOTEXTILE
SAND FILLING
Proposed Section P9a
COMPACTED SUITABLE FILL
14000 COUNTER BERM 14000 COUNTER BERM
FRL+"X"
2 2
6000 8000 8000 6000
1 1
1947 1947 1947 1947
HIGH STRENGTH GEOTEXTILE HIGH STRENGTH GEOTEXTILE
HIGH STRENGTH GEOTEXTILE 400/50 HIGH STRENGTH GEOTEXTILE

200
300
STABILIZATION GEOTEXTILE STABILIZATION GEOTEXTILE
SAND FILLING
APPENDIX 1
Previous Section P10a
COMPACTED SUITABLE FILL
16000 COUNTER BERM 16000 COUNTER BERM
FRL+"X"
2 2
5000 6000 5000 5000 6000 5000
1 1
HIGH STRENGTH GEOTEXTILE HIGH STRENGTH GEOTEXTILE
HIGH STRENGTH GEOTEXTILE HIGH STRENGTH GEOTEXTILE
500 500

CAPPING LAYER CAPPING LAYER


STABILIZATION GEOTEXTILE STABILIZATION GEOTEXTILE
SAND FILLING
P10a
Proposed Section COMPACTED SUITABLE FILL
16000 COUNTER BERM 16000 COUNTER BERM
FRL+"X"
2 2
5000 6000 5000 5000 6000 5000
1 1
1947 1947
HIGH STRENGTH GEOTEXTILE HIGH STRENGTH GEOTEXTILE
600/50 HIGH STRENGTH GEOTEXTILE

200
CAPPING LAYER

300
STABILIZATION GEOTEXTILE STABILIZATION GEOTEXTILE
SAND FILLING

You might also like