This document lists 16 pending tasks and assigns responsible individuals to complete them by target dates. The tasks include developing a control plan and welding procedure specifications, implementing a routing card and tag system, conducting equipment inspections and personnel training, and arranging for third party audits and certification of welding and inspection documents and processes. Most tasks are targeted to be completed by July 19th or 20th of 2023.
This document lists 16 pending tasks and assigns responsible individuals to complete them by target dates. The tasks include developing a control plan and welding procedure specifications, implementing a routing card and tag system, conducting equipment inspections and personnel training, and arranging for third party audits and certification of welding and inspection documents and processes. Most tasks are targeted to be completed by July 19th or 20th of 2023.
This document lists 16 pending tasks and assigns responsible individuals to complete them by target dates. The tasks include developing a control plan and welding procedure specifications, implementing a routing card and tag system, conducting equipment inspections and personnel training, and arranging for third party audits and certification of welding and inspection documents and processes. Most tasks are targeted to be completed by July 19th or 20th of 2023.