This job completion report documents work performed at Dandot Cement Factory from April 14-17. A team led by Shahid, Ammar, and Shehzad performed an AC 200kV voltage withstand test of a 132kV transformer for 60 seconds. The client, Dandot Cement Factory, was satisfied with the work and would use the services again.
This job completion report documents work performed at Dandot Cement Factory from April 14-17. A team led by Shahid, Ammar, and Shehzad performed an AC 200kV voltage withstand test of a 132kV transformer for 60 seconds. The client, Dandot Cement Factory, was satisfied with the work and would use the services again.
This job completion report documents work performed at Dandot Cement Factory from April 14-17. A team led by Shahid, Ammar, and Shehzad performed an AC 200kV voltage withstand test of a 132kV transformer for 60 seconds. The client, Dandot Cement Factory, was satisfied with the work and would use the services again.
This job completion report documents work performed at Dandot Cement Factory from April 14-17. A team led by Shahid, Ammar, and Shehzad performed an AC 200kV voltage withstand test of a 132kV transformer for 60 seconds. The client, Dandot Cement Factory, was satisfied with the work and would use the services again.
This Form is for Instrumentation Department to report Work Completion & only can be filled after job is completed. Job Number Complaint Service ☐ ☒ To be filled by the Work Team Lead Mr. Irfan/ Mr. Amir Baig Dandot Cement Factory Client Name Site name Dandot Cement Factory, Khewra 14-04-23 To 17-04-23 Client Address Inspection Date Mr. Irfan/Mr. Amir Baig Shahid, Ammar, Shehzad Work Site Inspected By Work Team Brief Description of All Work Completed • AC 200KV Voltage Withstand Test of 132kv Transformer for 60 Sec.
Comment Section for Customer
Would you like to use our Services again? ☒YES ☐NO Have all issues been resolved to your complete satisfaction? ☒YES ☐NO If NO, Explain?
Additional Comments or Suggestions:
Overall Rating: ☆☆☆☆☆
☐Excellent ☐Very Good ☒Satisfactory ☐Needs improvement ☐Unsatisfactory
Mr. Shahid 14-04-23 to 17-04-23
Application Engr. Name Application Engr. Signature Date