*For best view enlarge to 150% of normal view* OASIS Methodology

A p p l i c a t i o n s KPIT Cummins Oracle Applications implementation methodology is ISO 9001 certified


and assessed at SEI CMM Level 5. The methodology has been extensively used on the KPIT Cummins OASIS Methodology
projects executed by KPIT Cummins and has been refined over time. Our Process
Improvement Process ensures that the OASIS methodology is upgraded regularly to
incorporate the learning from the projects we execute.

OASIS is a methodology developed by KPIT Cummins and embodies: The main steps in OASIS are

• Quality • Preliminary Study


The methodology and processes of Oracle Applications implementations are ISO 9001 • Requirement Analysis
certified and assessed at SEI CMM Level 5. Our learnings from over 30 projects have • GAP Analysis
been incorporated into OASIS making it, a robust and proven methodology. • Conference Room Pilot (CRP)
• User Training and User acceptance Test
• Content • Production Setup
Pre-built document formats-templates, data migration interfaces, etc. developed over • Hand Over
time and tested on multiple projects.

• Flexibility
The issues, concerns and specific requirements of each project require the
methodology to be flexible enough without loss of controls. Our OASIS methodology has
been designed keeping these requirements in time and perfected through practice. Be
it module-by-module implementations, big-bang implementations or combinations in
between, the methodology has been tried and proven in a variety of situations
successfully.

• Delivery tools
O r a c l e

Project Management & tracking using MS Project, communication & review



mechanisms, escalation mechanisms, version control using MS VSS, etc. Expertise on
Autosys, Appworx and Kintana Object Migrator gives us that extra advantage for large
multi-location sites.

• People
Experienced consultants, working side by side with client team members, to provide
hands-on validation of the system, training, and knowledge transfer throughout the
implementation process. The Oracle Applications Implementations Methodology
*For best view enlarge to 150% of normal view* OASIS Methodology

A p p l i c a t i o n s
OASIS-Preliminary Study

Start Criteria: Start of Project

Objectives: Obtain overview of the project and prepare detailed project plan

Participants: KPIT Team and Client Team

Deliverable: Detailed Project Plan

Completion Criteria: Detail Project Plan signed-off

• OASIS-Requirement Analysis

Start Criteria: Signed-off Detail Project Plan

Objectives:
y Study requirements and existing business processes.
y Identify ‘AS IS’ and ‘TO BE’
y Document findings

Participants: KPIT Team and Client Team

Deliverable: Requirement Analysis (RA) Document


O r a c l e

Completion Criteria: RA Document signed-off


*For best view enlarge to 150% of normal view* OASIS Methodology

A p p l i c a t i o n s
• OASIS-GAP Analysis

Start Criteria: Signed-off RA Document


y Map required business processes to Oracle Applications functionality
Objectives:
y Identify gaps
y Provide workarounds
y Identify Interfaces and customizations
y Write High level Specifications for customizations and interfaces

Participants: KPIT Team and Client Team

Deliverable: Gap analysis document containing


y Documented workarounds
y Interfaces required and Customizations needed
y Module Test Plans
y System Test Plan

Completion Criteria: GAP Analysis Document signed-off

• OASIS-CRP (Conference Room Pilot)

Start Criteria: Signed-off Gap Analysis

Objectives:
y Set up Pilot or (CRP) Database
y Test the Pilot Database using module test plan
y Test the Data conversion scripts.
y Perform System Test.
O r a c l e

Participants:
y KPIT Team
y Key users from client side
y Set up documents
Deliverable:
y Module Test Plan results.
y System Test plan Results.
y Data conversion scripts results.

Completion Criteria: Configured Test Database Acceptance sign-off


*For best view enlarge to 150% of normal view* OASIS Methodology

A p p l i c a t i o n s
• OASIS-User Training and User Acceptance Test

Start Criteria: Signed-off Configured Test Database Acceptance

Objectives:
y Transfer Apps knowledge to Key users and End users
y System testing by the Key users and End Users
y Test Interfaces and customizations, if applicable

Participants: KPIT Team and Client Team

Deliverable:
y Training
y Tested interfaces and customizations, if applicable.

Completion Criteria:
y Key user Signoff for set ups
y User Signoff for interfaces and customizations

• OASIS-Production Setup

Start Criteria: Signed-off Set ups.

Objectives: Install & configure Production Database

Participants: KPIT Team and Client Team


O r a c l e

Deliverable: Configured Production Database

Completion Criteria: Signoff for module setups on Production Database


*For best view enlarge to 150% of normal view* OASIS Methodology

A p p l i c a t i o n s
• OASIS-Hand Over

Start Criteria: Configured Production Database

y Data Migration on Production Database


Objectives:
y One Complete Business Cycle run with Maximum five predetermined
transactions per business process.

Participants: KPIT Team and Client Team

Deliverable: Successful Business cycle Run

Completion Criteria: User Signoff for the Production Run

• OASIS-Warranty / Production Support

KPIT Cummins implementations come with a standard 30 day Warranty as described in the Warranty
clause in the proposal.

KPIT Cummins offers a wide array of Production Support services for Oracle Applications as independent
services with or without the implementation.
O r a c l e

KPIT Cummins are a focused, and experienced IT consulting partner for industry leaders across the globe. Our core competencies Contact
across industry verticals include e-Business solutions, enterprise applications, business intelligence and data warehousing, UK: +44 118 9519400
application integration and embedded systems. Benefits of working with KPIT Cummins accrue from: US: +1 732 321 0921
• Solution experts helping companies succeed Asia Pacific +91 20 5652 5138
• Applying best industry practices Mail: query@kpitcummins.com
• Realizing the advantages of the Global Delivery Model (GDM)
Webfront: http://www.kpitcummins.com/sap.htm