The document outlines dredging volumes for different areas including CRB, CTB, and the current interim area. It shows the designed volume, actual volume dredged to date according to section measurements, and the remaining volume to be dredged for each area and in total. The total designed volume was 3,190,669 cubic meters, the total actual volume dredged so far is 3,120,603 cubic meters, leaving a total remaining volume of 70,066 cubic meters to be dredged.
The document outlines dredging volumes for different areas including CRB, CTB, and the current interim area. It shows the designed volume, actual volume dredged to date according to section measurements, and the remaining volume to be dredged for each area and in total. The total designed volume was 3,190,669 cubic meters, the total actual volume dredged so far is 3,120,603 cubic meters, leaving a total remaining volume of 70,066 cubic meters to be dredged.
The document outlines dredging volumes for different areas including CRB, CTB, and the current interim area. It shows the designed volume, actual volume dredged to date according to section measurements, and the remaining volume to be dredged for each area and in total. The total designed volume was 3,190,669 cubic meters, the total actual volume dredged so far is 3,120,603 cubic meters, leaving a total remaining volume of 70,066 cubic meters to be dredged.