Professional Documents
Culture Documents
HIHO WHEEL - FACTORY - Daily Report 220912 RESANE MUROS
HIHO WHEEL - FACTORY - Daily Report 220912 RESANE MUROS
P 2.- RELLENO Y TRASPALEO DE TIERRA PARA NIVELACION DE TERRENO 2.- RELLENO Y APALEO DE TIERRA PARA NIVELACION DE TERRENO
A
C
K 3.- TOPOGRAFIA POR PARTE DE CONSTRATISTA 3.- TOPOGRAFIA POR PARTE DE CONSTRATISTA
A
G
E
MAN POWER
Up to Up to
Subcontractors Today Total Reference Subcontractors Today Total Reference
yesterday yesterday
IINGENIERIA Y PROCURA DIICA, S.A. DE C.V. INGENIERIA Y PROCURA DIICA, S.A. DE C.V.
Manager 0 1 1 fierro 0 2 2
General assistant 0 0 0 cape 0 0 0
General supervisor 0 1 1 sh&e 0 0 0
Resident 0 1 1 maneuverer 0 0 0
Surveyor 0 0 0 Concrete repair 0 0 0
Quality Inspector 0 0 0 assistant 0 2 2
Machinery Operator 0 0 0 welder 0 0 0
Carpenter 0 0 0 Assembler 0 0 0
Superintendent 0 0 0 SUB TOTAL 7 7
REMARK
Slab
683
N.P.T.
1821.77
N.P.T.
1192
1821.47
N.P.T.
1821.246
N.P.T.
1820.946
1365
3913
Slab Slab
683
N.P.T.
1820.646
N.P.T.
1820.496
341
1194 1194 N.P.T.
1820.05
1365 455
455
2275 3
9225
C
C D E
922
C
D
DAILY REPORT
C D E
HIHO WHEEL FACTORY
FELIPE DE JESUS RUIZ HERNANDEZ (9211052714 - construcciones@diica.com.mx) Date (Y-M-D) 2022-09-19
Prepared by Day of Work: MONDAY
Weather: SUNNY 26/12°C
Department: TODAY WORKS TOMORROW WORKS
CONSTRUCCION DE TRINCHERA
CONSTRUCCION DE TRINCHERA
WORK RELLENO Y TRASPALEO DE TIERRA PARA NIVELACION DE TERRENO DATE LUNES 19 DE SEPTIEMBRE 2022