Architectural Thesis - II (AR-1071)

CAMPUS
AT Newtown, Kolkata

Name: AMITESH DEBNATH


ID Number: 5 2 0 2 1 6 0 1 4

Supervisor: Prof. Partha Sarathi Mukhopadhyay


Department of Architecture Town and Regional Planning
B . A r c h 1 0 th S e m e s t e r , S e s s i o n : 2 0 2 0 - 2 0 2 1
Architectural Thesis – I (AR-1051) | B. Arch. 10th Semester

CONTENTS

TOPIC 1 ABOUT INFOSYS PAGE 3

TOPIC 2 DESIGN CONCEPT PAGE 4

TOPIC 3 DESIGN CHALLENGES PAGE 8

TOPIC 4 AREA ANALYSIS PAGE 10

TOPIC 5 BUBBLE DIAGRAM PAGE 22

TOPIC 6 ZONING PAGE 24

TOPIC 7 DESIGN TRANSLATION PAGE 26

TOPIC 8 PLANS PAGE 50

TOPIC 9 RENDERS PAGE 51

TOPIC 10 STRUCTURE PAGE 52

TOPIC 11 POST COVID LAYOUTS PAGE 110

TOPIC 12 SECTIONS PAGE 112

TOPIC 13 PLUMBING PAGE 128

TOPIC 14 REFERNCES PAGE 135


ABOUT INFOSYS Infosys provides software development, maintenance and independent validation services to
companies in finance, insurance, manufacturing and other domains. One of its known products
is Finacle which is a universal banking solution with various modules for retail and corporate
banking.

Infosys is a service and consultancy company. Whenever you have something to do, and you are
not sure how to do it the best way, you call Infosys. Its not that they will definitely do the work
for you, but they will find out the best way to do the work. More often than not, instead of just
asking them the method of how to do the given work, you also ask them to do it for you.
Information Systems
• Infosys has a plethora of clients and the work it does for them varies. Starting from
something as simple as writing a small code for turning an alarm on it can range to:
Founded: 7 July 1981, Pune
• designing/testing a complex security system for a mainframe
Headquarter: Banaluru • designing/testing a device to be used in treating a raging disease
• designing/ analyzing / simulating mechanical components of airplanes, engines etc.
Co-founded by – • providing methods to increase the revenue for some companies and cut their costs
N.r. Narayana Murthy and 7 others.
• advise companies on their production/marketing strategies
CEO : Salil Parikh • designing/creating tools to increase the productivity of their clients
• R&D in some software fields
An Indian Multi-National Company
Second Largest IT company after
• and the last but not the least, they create some products (read softwares) for use in multiple
TCS in India. industries.

SOURCE: WIKIPEDIA 3
DESIGN CONCEPT – BIOPHILIC DESIGN
DESIGN CONCEPT – BIOPHILIC DESIGN
INSPIRED FRIOM THE NATURE
BLOCKS NEED TO HAVE GREEN SPACE BLEND WITH THE INTERIOR.
SOURCE: GOOGLE
DESIGN CONCEPT

ALSO,INTEGRATION OF
HOME ENVIRONMENT + OFFICE SPACE
IIEST-Shibpur | Arch., T& RP Dept. 13
IIEST-Shibpur | Arch., T& RP Dept. 14
Area Program of Adobe Head Quarters for 3000 Capacity Area Program of Services for 3000 Capacity
No.
Infrastructure Area Area :
Capacity of Note Infrastructure Programs Area sq.m. No. of Units Note
Programs sq.m. Capacity
Units
55 Heads divided in 3 Surface Parking - 130 ECU -
Training Centre 55 275 5 3
Rooms
Server Room Electrical Sub Station 315 Each -
85 365 4.29 1 -
Guest Rooms + 75% Guest Room + 25% Lift and Stair Lobby - - 1.8
Executive Lounge
9 + 28 365 9.86 1
Lounge LIFT 5.04 - 14 Person Lift
Atrium 116 2 -
Kitchen Storage Area 1 -
Work Staion I 4 19.78 4.95 ~ Entry Level Cubical Size
Storing Area 1 -
Work Staion II 1 10.56 10.56 ~ Executive Level Cubical Size 140
Washroom - -
Video Conference with 2 Service Lift - -
Conference Room 14 37.5 2.68 1
Screens
Conference Room 2
STP 329.8 1 200 KLD per day
8 19.78 2.47 4 Flexible
Open Collaboration 11 40 3.64 2 Studio Presentation Area Pump Room 184 1 -
Open Collaboration II 68 On Open Lobby Basement Parking - 400 ECU -
Male Washroom - 75 ~ 9 WC, 10 Basin, 8 Urinals
Control Room Utility Panel 240.96 1 -
Female Washroom - 75 ~ 10WC, 7 Basin
Cafeteri 460 740 1.61 1 - A.H.U Room for Auditorium 175.84 1 -
Kitchen - 285 1 - A/C Plant Room 537.5 1 -
1+1 Changing Room, 2+2 Basement Store 496.12 1 -
Indoor Games - 345 1
Bathroom
Fan Room 34.8 1 -
Mechanical Ser. - - 1 -
Electrical Ser. - - 1 - Fuel Storage Room 16.25 1 -
% of Gr.
Programs PRIMARY PROGRAMS
Cover
Bubble Diagram
SECONDARY PROGRAMS
Development Centers 36
Sports complex SUPPORTING PROGRAMS
Food Courts 11 SERVICE
(TENNIS COUT/BASKET
ENTRY BALL COURT/ CRICKET
GROUND/POOL)

ECC Buildings 18

Pools ~
SERVICE
Recreational Spaces 5 BUILDINGS

ECC BUILDING

BUS
Badminton Courts 2 BAY

Cricket Ground ~

Mini Footall Field ~

DEVELOPMENT
Basket Ball Court ~ FOOD
CENTERS(OFFICE) COURTS

Bus Bay ~

OAT ~ MLPL

MLPL 22
OAT

Service Buildings 6 MAIN


*MLPL - Multi-Level Parking Lot ENTRY

*ECC - Employee Care Center


Misc. Service Spaces 2
PRELIMINARY ZONING

SCALE- 1:3000
CORNER PART OF
CENTRE PART OF THE SITE WHICH
THE SITE WHICH WILL CONDUCT
WILL CONDUCT THE SERVICE AND
THE SECONDARY SUPPORTING
ACTIVITIES ACTIVITIES.

FRONT PART OF % of Gr.


Programs Qty. Area sq.m.
Cover
THE SITE WHICH
WILL IMPACT THE Development Centers ~2 36 8250
MENTAL IMAGE OF
THE PEOPLE Food Courts ~1 11 2400
PASSING Y ABOUT
THE PLACE ECC Buildings 1 18 4250

Pools 1 ~ 1250

Recreational Spaces ~ 5 1200

Badminton Courts 2 2 225

Cricket Ground 1 ~ 11300

Mini Footall Field 1 ~ 3000

Basket Ball Court 1 ~ 750

Bus Bay 1 ~ ~

THE SOUTH SIDE OF THE SITE, Amphitheatre 1 ~ 1500


THE LENGTH IS MORE THAN
AREA: 202350.27 Sq.M. 750M, SO TWO ENTRIES ARE MLPL 1 22 5000
PROVIDED.
Service Buildings ~3 6 1500

Misc. Service Spaces ~ 2 450


DESIGN CONCEPT

DESIGN TRANSLATIONS
ISO, BLOCK MODELS
N

SITE
TOTAL BUILT-UP AREA: 109390.09 Sq.M.
GROUND COVERAGE: 23050.41 Sq.M.
LOCATED IN NEWTOWN.
TOTAL AREA 20Ha.
N

TOTAL VOLUME
TOTAL BUILT-UP AREA: 109390.09 Sq.M.
GROUND COVERAGE: 23050.41 Sq.M.
F.A.R – 1.5 (ACC. TO TOTAL AREA IN SQFT)
SITE SERVICE
FOOTBALL FIELD

ACCOMODATION

PARKING
CRICKET FIELD
N

RECREATIONAL ZONE

OFFICE BLOCK

BUS BAY

ZONE DIVISION
DIVIDED BASED THE ANALYSIS OF
THE CASE STUDIES, SUITABLE ENTR POINTS,
CLIMATE FACTORS, AND INFOSYS CAMPUS
AROUND INDIA
4. 6.
2.
N

3.

5.
REQUIRED BLOCKS BASED ON
1. ZONING
1. OFFICE BLOCK
2.. ACCOMODATION BLOCK
PROVIDED BEHIND, FOR PROVACY.
3. OAT – CONNECTION THE OFFICE BLOCK AND PARK.
4. CRICKET FIELD, FOOTALL FIELD, FOOD STALL FOR
VISITORS.
5, . THE MULTI-LEVEL CAR PARKING IS POSITIONED
CLOSE TO THE MAIN ENTRY AND MAIN ENTRY OF THE
BUILDING.
6. SERVICES LIKE SUBSTATION AND DOMESTIC & FIRE’
WATER RESERVIOUR.
THE MULTI-LEVEL CAR PARKING IS POSITIONED N
CLOSE TO THE MAIN ENTRY AND MAIN ENTRY OF THE
BUILDING.

ACCOMODATION BLOCK
PROVIDED BEHIND, FOR
PROVACY.

THE BLOCK IS ORIENTED EAST-WEST TO


AVOID HEAT GAIN.

ROAD MAP
LAYING OF ROADS WITH RESPECT TO
THE BOCK ARRANGEMENT.
N

OFFICE BLOCK

DETAIL DESIGN PORTION


THE AREA DEMARCAED IN YELLOW WILL BE
DONE IN DETAIL. WHERE THE OFFICE BLOCK
IS LOCATED.
AND THE SITE PLANNING,
N

ENTRIES -
THERE ARE THREE ENTRIES TO THE SITE.
A MAIN ENTRY.
SERVICE ENTRY 1’
SERVICE ENTRY 2
N

PRE-FINAL VOLUME
A TENTATIVE VOLUMETRIC FIGURE OF THE BLOCK
KEEPING THE AXIS, CLIMATIC FACTORS FUNCTION
AND ACTIVITES IN CONSIDERATIONS.
N

LANDSCAPING-
THE FUTURE PROPOSAL PORTION OF THE SITE
FOR THE TIME BEING USED AS A RECREATIONAL
PARK FOR THE EMPLOYEES.
N

BUS ROUTE -
THE YELLOW ARROWS INDICATES THE MOVEMENT
OF THE BUS AFTER ENTERING.
THEY CAN EXIT THROUGH
SERVINCE EXIT 1 AS WELL.
N

CAR ROUTE -
THE ORRANGE ARROWS INDICATES THE MOVEMENT
OF THE CARS AFTER ENTERING.
THEY GO STRAIGHT TO THE MULTI LEVEL
CAR PARKING BLOCK. .
N

PEDESTRIAN ROUTE -
THE ORANGE ARROWS INDICATES THE MOVEMENT
OF THE PEDESTRIAN IN THE MORNING.
INDICATES THE MOVEMENT OF THOSE WHO STAY
AT THE ACCOMODATION..
SITE PLAN
SCALE – 1:2000
ACCOMODATION BUILDING

SWIMMING POOL

FOOBALL FIELD
MAIN ENTRY

CRICKET FIELD

SITE PLAN-
SITE IS ORIENTED IN NORTH SOUTH ORIENTATION.
UNDERWATER RESERVIOUR
FIRE WATER RESERVIOR

SPORTS ACTIVITY SPACE


POSITIONED SO THAT CAN BE
ACCESSED FROM BOTH
ACCOMODATIONA AND
OFFICE BLOCK.

SUBSTATIONS -
LT ROOM
HT ROOM
GENERATOR

THE CENTRAL SPACE IS FOR FUTURE EXPANSION.


BUT CAN BE USED AS A PARK TILL THEN.

BUS BAY
LANDSCAPE-
Designed as a V-shaped configuration of
blocks, delineating a central court. The ‘V’
opened to the north, letting in breezes
that first, skim the surface. To tap into this
natural airflow, the envelope of the
buildings.
had to calibrate permeability and shade. .
The significant amount of space dedicated to
living nature and the preference for organic
over hard-edged forms creates a visual oasis
within Singapore's dense city center. Views
of nature have been shown to lower blood
pressure and heart rate, improve mental
engagement and awareness and positively
impact attitude and overall happiness. These
implicit reactions may translate into a desire
to
spend more time in the hotel’s public spaces,
and to plan return visits to the hotel in the
future. In addition, the high exterior visibility
of the hotel’s natural forms and gardens
provide local residents with an opportunity to
experience the same positive health effects.
SHADOW ANALYSIS
TO RECOGNISE THE POTENTIAL LANDSCAPE DESIGN

MORNING(@9AM) AFTERNOON (@12PM) EVENING (@5PM)


Bubble Diagram – Development Centers
PRIVATE ZONE
MEETING
ROOM
(4-6)
MEETING SEMI-PRIVATE ZONE
ROOM WORK
(2-4)
STATIONS

SEMI PUBLIC ZONE


WORK
STATIONS
TRAINING Conference PUBLIC ZONE
ROOM Room

PHOTOCOPY
COFFEE Wash
AREA Room
PHOTOCOPY
Wash
MEDIA ROOM
Room

CLOSET

OFFICE
MANAGER

RESOURCE
CENTER
Human SERVER
Resource
Manager
ROOM

LOBBY/
INFRASTRUCTURE STAFF
SUPPORT STORAE
LOUNGE

RECEPTION

VISITORS
ROOM
Electrical
Room
N

MAIN OFFICE BLOCK- BASE


THE MAIN OFFICE BLOCK NEEDS TO BE
LOCATED CONVINIENT TO THE EMPLOYESS
FOR THE APPPROACH. WITH APPROPRIATE
NUMBEROF ENTRANCE FOR 6000 EMPLOYEES.
N

ENTRY TO THE SITE


LIFT
N
WASHROOMS

STAIRS

SERVICE CORES -
SEVICE CORES ARE SITUATED AT THE
PERIPHERY OF THE BLOCK.
LIFT
N
WASHROOMS

STAIRS

CORRIDORS

FIRE EXIT MAPS -


EVERY CORENER OF THE BLOCK IS CONNECTED WITH CORRIDORS
WHICH COCNNECTS THE PERSON TO THE FIRE STAIRCASE FOR ESCAPE IN CASE OF A FIRE.
N

TYPICAL BLOCK FLOORS -


13000 SQM TOTALGROUND COVERAGE THE BLOCK.
N

WEATHER PARAMETER -
THE ABOVE SHAPE WILL BE WITH RESPECT OF THE
CLIMATIC PARAMETERS AND INSPIRED BY THE NATURE.
FOR THE EAST WEST ORIENTATION HEAT GAIN IS REDUCED.
PUBLIC RLATIONS

CUSTOMER SERVICE

LOUNGE

CAFEE

INFOSYS RETAIL

INTERNAL BLOCK ZONES -


MARKETING

ADMINISTRATIVE

INTERNAL BLOCK ZONES -


CREATIVE DEPARTMENT

ACCOUNTS

BUSINESS

INTERNAL BLOCK ZONES -


PURCHASING AND OPERATIONS

SALES

INTERNAL BLOCK ZONES -


DATA SCIENCE

FINANCE

INTERNAL BLOCK ZONES -


MEETING AND
CONFERENCE ROOMS

INTERNAL BLOCK ZONES -


SOFTWARE
DEVELOPMENT
ENGINEERS

INTERNAL BLOCK ZONES -


SOFTWARE DEVELOPMENT CONSULTANTS

COMPUTER PROGRAMMERS
SND CO-ORDINATORS

INTERNAL BLOCK ZONES -


GREEN TERRACES -
A SET OD INTERLOCKING ELEMENTS CREATE GREEN COMMUNAL
SPACES AT VARIOUS LEVELS.
EXTENDING THE POSSIBILITIES OF EMPLOYEE INTERACTION AND
DAY LIGHT INCERTION.
INFOTAINMENT
CENTRE

TRAINING CENTRE

BRIDGING THE GAP-


THIS IS THE CENTER IF THE STRUCURE, WHICH GOT FUNCTIONAL
ACTIVITIES AND AMBIENCE THAT PULLS THE CROWD FOR MORE
INTERACTION AND CREATES DIVERSITY.
OAT-
STAIR FROM THE 1ST FLOOR DIRECTLY CONNECTS TO THE OAT,
THE CENTER IS MAINLY OF FRESHERS ACTIVITY AND THIS SPACE DIRECTLY
PULLS THE TOWARDS IT FOR RECREAIONAL PURPOSES.
BLOCK PLAN LAYOUTS
SITE LEVEL AND BUILDING LEVEL
(MOVEMENT EXPLANATION
DETAILED MAGNIFIED PLAN IN
PAGE 101 ONWARDS)

MAIN ENTRANCE
PLAZZA OF THE
EMPLOYEES AND
ANYONEVISITING

SCALE – 1:1600
(MOVEMENT EXPLANATION
DETAILED MAGNIFIED PLAN IN
PAGE 101 ONWARDS)

LIFT LOCATIONS

THE GRAND ENTRANCE


AND THE CORRIDORS
SPECIES THE
MOVEMENT OF THE
EMPLOYEES AFTER
ENTERING.

SCALE – 1:1600
(MOVEMENT
EXPLANATION
DETAILED MAGNIFIED
PLAN IN PAGE 101

V
ONWARDS)

V
BUS MOVEMENT

ACCESS FLOORS
FROM 1ST FLOOR
AND CORNER ENTRY

BUS DROP POINTS


V

V
V SCALE – 1:1600
V
(MOVEMENT EXPLANATION
DETAILED MAGNIFIED PLAN IN
PAGE 101 ONWARDS)

TYPICAL FLOOR PLAN


LAYOUT OF LEFT
BLOCK ANF RIGHT
BLOCK. (CENTER
BLOCK IS DISTINCT)

SCALE – 1:1600
CENTER BLOCK GROUND FLOOR PLAN
SCALE – 1:425
KEY PLAN
CENTER BLOCK FIRST FLOOR PLAN
SCALE – 1:425
KEY PLAN
CENTER BLOCK SECOND FLOOR PLAN
SCALE – 1:425
KEY PLAN
RIGHT BLOCK FIRST FLOOR LAYOUT(RIGHT BLOCK AND LEFT BLOCK
ARE SYMMETRICAL)
SCALE – 1:425
KEY PLAN
RIGHT BLOCK SECOND FLOOR LAYOUT(RIGHT BLOCK AND LEFT BLOCK
ARE SYMMETRICAL)
SCALE – 1:425
KEY PLAN
RIGHT BLOCK 3RD,4TH, 5TH LAYOUT(RIGHT BLOCK AND LEFT BLOCK ARE
SYMMETRICAL)
SCALE – 1:425
KEY PLAN
RIGHT BLOCK 6TH FLOOR LAYOUT(RIGHT BLOCK AND LEFT BLOCK ARE
SYMMETRICAL)
SCALE – 1:425
KEY PLAN
RIGHT BLOCK 7TH FLOOR LAYOUT(RIGHT BLOCK AND LEFT BLOCK ARE
SYMMETRICAL)
SCALE – 1:425
KEY PLAN
RIGHT BLOCK TYPICAL FLOOR FURNITURE LAYOUT(RIGHT BLOCK AND
LEFT BLOCK ARE SYMMETRICAL)

KEY PLAN
FLOOR LEVEL DIFFERENCE
FOR INCREASE INTERACTION

STEP 1 STEP 2 STEP 3


FLOOR LEVEL DIFFERENCE
FOR INCREASE INTERACTION

STEP 4 STEP 5
FLOOR LEVEL DIFFERENCE
TENTATIVE FURNITURE LAYOUT

FOLLOWING THE 2M DIAMETER OF AN INDIVITUAL(POST COVID REGULATIONS)


SECTION CUT @A-A
B B

SECTION CUT @B-B


NORTH SIDE FRONT ELEVATION
RENDER IMAGES
SITE MODEL
SERVICES
SITE LEVEL AND BUILDING LEVEL
LIFT
N
WASHROOMS

STAIRS

CORRIDORS

FIRE EXIT MAPS -


EVERY CORENER OF THE BLOCK IS CONNECTED WITH CORRIDORS
WHICH COCNNECTS THE PERSON TO THE FIRE STAIRCASE FOR ESCAPE IN CASE OF A FIRE.
SITE LEVEL SERVICES
FIRE SPRINKLER LAYOUT IN RIGHT
BLOCK(LEFT BLOCK AND RIGHT
BLOCK ARE SYMMETRICAL)
FIRE – REFERENCE FROM CODES
FIRE – REFERENCE FROM CODES
INSPECTION PIT @30M INTERVALS
STRUCTURAL
BUILDING LEVEL
BEAM LAYOUT OF CENTER BLOCK AND RIGHT
BLOCK(RIGHT BLOCK AND LEFT BLOCK ARE
SYMMETRICAL),

COLUMN DIMENSION –

COLUMN 1 -350X600

COLUMN 2 600X600

COLUMN TO COLUMN INTERVAL – 6500MM &


7000MM

SLAB THICKNESS – 150MM

SHEAR WALLS ARE USED FOR LIFTS.

SHORTCRETE IS USED FOR PARTITIONS THICKNESS


USED 200MM.

KEY PLAN
REASONS FOR USIN SHOTCRETE
CONSIDERING LEED CERTIFICATIONS
LEED - 2011 (CS 2009)

1. VEGETATION -
Sites with Zoning Ordinances but No Open Space Requirements
Provide vegetated open space equal to 20% of the project site area.

Development Density and Community Connectivity, vegetated


roof areas can contribute to credit compliance. (PG-35)

2. STORMWATER -
Design the project site to maintain natural stormwater flows by promoting infiltration.
Specify vegetated roofs,
pervious paving and other measures to minimise impervious surfaces. Reuse stormwater for non-potable uses
such as landscape irrigation, toilet and urinal flushing, and custodial uses. (PG-36)

Potential Technologies & Strategies


Use alternative surfaces (e.g., vegetated roofs, pervious pavement, grid pavers) and nonstructural techniques
(e.g., rain gardens, vegetated swales, disconnection of imperviousness, rainwater recycling) to reduce
imperviousness and promote infiltration and thereby reduce pollutant loadings.
Use sustainable design strategies (e.g., low-impact development, environmentally sensitive design) to create
integrated natural and mechanical treatment systems such as constructed wetlands, vegetated filters and open
channels to treat stormwater runoff. (PG-37)

3. HEAT ISLANDS - Heat islands are defined as thermal gradient differences between developed and undeveloped
areas.

Consider replacing constructed surfaces (e.g., roof, roads, sidewalks, etc.) with vegetated surfaces such
as vegetated roofs and open grid paving or specify high-albedo materials, such as concrete, to reduce heat
absorption. (PG-38)

Install a vegetated roof that covers at least 50% of the roof area.

CONSIDERING LEED CERTIFICATIONS


USING GLASS LIFT DETAILS
PLUMING CONSIDERATIONS
PLUMING CONSIDERATIONS
GREEN TERECCING
SOLAR POWER
Architectural Thesis – I (AR-1051) | B. Arch. 10th Semester

THANK YOU
AMITESH DEBNATH | 520216014