+Risk Assessment Ref. No. SITE: Port Said terminal DEPARTMENT/LOCATION : NO. PERSONS INVOLVED
1. Excavation extending from Ware-house yard area West boundary 2-20
wall manhole the full length of the yard and beyond the plant area
boundary fence to the existing sewage plant. 2. Driveway between
training dept. sewage manhole and laboratory area.
ACTIVITY: Excavation and replacement of the existing 8” PVC underground sewage EFFECT ON ANY ADJACENT WORK ACTIVITY : Great care must be taken on each and
system pipe lines by new similar sized PVC pipes laid above - and following the existing every occasion to ensure that excavations do not impact adjacent work areas.
system contour.
بآخر جديد من البالستيك:حفر و استبدال خط الصرف الصحي
HAZARDS IDENTIFIED HAZARD EFFECT RISK CONTROL MEASURES ACTION RESIDUAL RISK
: المعرفة:المخاطر Type of injury/damage EVALUATION REQUIRED :التصرف (R)
or environmental impact Refer to evaluation (include existing & proposed) : المتبقية:المخاطرة
: الخطر:تأثير forms :ت المطلوبة:االحتياطيا
:تقييم المخاطرة
DATE
P S RR PERSON
COMPLETE
P S RR
RESPONSIBLE
Operational capability :
المقدرة على التشغيل All preparation and ongoing
Lack of competency Fatality / Serious H H 13 excavation safety maintenance GUPCO designated Prior to and L L 2
: في الكفاءة:افتقار injury / minor provisions shall be strictly controlled Area authority during task
قبل و أثناء العمل
injury / business loss. by an onsite designated competent : المكلف:مسئول جابكو
جسيمة: إصابات،وفيات person. A designated operations
: و فقدان للعمل:وثانوية person complete with a radio
SHALL be in attendance during
ALL WORK ACTIVITY
OPERATIONS.
Atmospheric Hazards : Potential for Fatality / serious Daily monitoring PRIOR to GUPCO designated
reduction of sulphates due to seawater injury / minor the commencement of work Area authority
ingress in an anaerobic condition injury/fire and activity must be carried out
leading to the presence of H2S explosion. for the presence of H2S.
Continuous gas monitoring
كبرتيد الهيدروجين: تولد لغاز:احتمال جسيمة: إصابات،وفيات must be provided inside the
: و حريق و انفجار:وثانوية excavation activity area.
كبرتيد الهيدروجين: لغاز: يومية مستمرة:قياسات
Protruding steel re-bar : Great care must be
Tripping hazards etc. Serious injury / exercised in areas where the
نتوءات حديد التسليح minor injury steel re-bar is protruding
: التعثر:مخاطر above the foundations.
Potential falling / drowning ة نتوءات: يوجد بها: بالمناطق التي: الكبيرة:العناية
hazards : عن القواعد:لحديد التسليح
Lack of sufficient effective barriers Serious injury / A substantial barrier shall Prior to and
surrounding the excavation ( fall from Minor injury. be erected around the entire during task
height ). جسيمة: إصابات،وفيات H H 13 excavation area. L L 2
قبل و أثناء العمل
)نقص في الحواجز حول الحفر(السقوط من أعلي :وثانوي : الحفر: رئيسي حول منطقة:إنشاء حاجز
Potential for excavation filling with Where applicable, the
water during inclement weather ( fall Potential for excavation shall be
into water - drowning ). drowning. adequately covered
:احتمال الغرق overnight to protect against
أثناء نوات الطقس: بالمياه: امتالء الحفر:احتمال accidental build-up of water
)الغرق:-(السقوط في الماء due to inclement weather
conditions. Any
accumulation of water
within the excavation shall
be pumped out PRIOR to
any work commencing.
حول مناطق: وضع حاجز: يراعي: المكان:بقدر
: بها: يحتمل تجمع المياه: التي:الحفر.
Prior to and
during task
GUPCO designated قبل و أثناء العمل
Also, critical to provision of stable Continuous extraction Area Authority
foundation for new PVC pipe work. Business loss. pumping must be provided
( future fluid ground movement caused to adequately remove water
by high water table ). ingress. Stable ground
foundations MUST be
لخط البالستيك الجديد: أساس ثابت:توفير. provided above the existing
sewage line for layout and
Sheet 4 of 9
H H 13 L L 2
Lack of rescue / access – egress In view of the limited
provisions Fatality/serious dimensions of the
injury/minor injury. excavation it shall be
deemed sufficient to
provide a number of
recovery lines of sufficient
length ( permanently
attached to a secure position
above ground level for
rescue purposes in the event
of an emergency.
Earth moving equipment : Fatality / Serious All powered earth moving GUPCO designated Prior to and
Mechanical digger / trailer injury ? minor equipment must be subject Area authority during task.
injury / business loss to strict formal inspection قبل و أثناء العمل
Equipment integrity ( fit for purpose ) prior to entry into the
driver competency – potential for terminal. A hazard
equipment falling into the excavation. equipment entry permit
shall be issued following
Excavations under access roadways – completion of a satisfactory
Sheet 5 of 9
Vital access roads : Where the excavations GUPCO designated Prior to and
Fatality/serious border or cross traffic areas, Area authority during task
Excavations under access roadways – injury/minor ( entrance to warehouse قبل و أثناء العمل
potential for vehicle access collapse injury/business loss. yard ) they must be covered
by steel bridging plates.
The plates must be of
adequate thickness to safely
withstand the maximum
Sheet 6 of 9
Collapse of excavation walls Fatality / serious By virtue of the existing GUPCO designated Prior to and
injury / minor high water table and Area authority during work
activity L
injury / business loss H H 13 unstable ground conditions L 2
قبل و أثناء العمل
adequate SHORING may be
required. This provision
shall be determined by the
designated GUPCO
Engineer. If provided, it
shall be MAINTAINED in a
safe condition throughout
the duration of the work
activity.
Sheet 7 of 9
Hand tools :
أدوات يدوية
Using the wrong tools Fatality / Fire M M 8 Care MUST be taken to ensure that GUPCO designated Prior to and L L 2
: سليمة: الغير:استخدام األدوات /explosion / serious all hand tools used are in good Area authority during work
activity
Tools not fit for purpose injury / minor condition and fit for purpose.
قبل و أثناء العمل
injury / business loss
Potential sparks from using steel tools
Manual handling :
باأليديNالتداول
Using incorrect techniques Serious injury / Back M M 8 Care must be exercised by all GUPCO designated During task L L 2
: خاطئ:استخدام أسلوب pain / broken – personnel when lifting loads Area authority : العمل:أثناء
Overexertion trapped fingers etc. greater than 10 Kilogram in
weight. Where possible the load
الزائد:اإلجهاد should be shared between two
people.
GENERAL COMMENTS : Pre operational toolbox talk involving all relevant personnel shall be carried out. All performing authority
personnel must sign the relevant work procedure toolbox talk document prior to work commencing.
ASSESSMENT COMPLETED BY:
EMERGENCY PROVISION REQUIRED:
NAME POSITION SIGNATURE DATE
Jack Mitchell Project HSE Advisor 27/3/06