No Configured Materials Selected in T-Code CK40N: Symptom

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SAP Knowledge Base Article

2023702 - No configured materials selected in T-code CK40N


Component: CO-PC-PCP (Product Cost Planning), Version: 4, Released On: 19.07.2016

Symptom
• Configured Materials are not costed in transaction CK40N.

Environment
• Controlling (CO)
• SAP R/3
• SAP R/3 Enterprise 4.7
• SAP ERP Central Component
• SAP ERP
• SAP enhancement package for SAP ERP
• SAP enhancement package for SAP ERP, version for SAP HANA

Reproducing the Issue


1. Enter transaction CK40N.
2. Enter the relevant Parameters.
3. Execute the Analysis step.
4. View the results, and you will find that Configurable Materials are not included.

Cause
• You have not selected the flag 'Select Configured Matls Only' in the parameter screen of 'Selection' step in transaction CK40N.

Resolution
1. If you want to cost configured materials in the costing run, you need to activate the flag 'Select Configured Matls Only' on the parameter screen
of step 'Selection'. If the flag is not set, the system will only select non configured materials. There is no possibility to combine the selection of
configured materials and non configured materials. You will have to create 2 costing runs in that case.

Keywords
Configurable,Configured material, costing run, cost estimate selection,configurable material

Products
Products

SAP ERP Central Component all versions

SAP ERP all versions

SAP R/3 Enterprise all versions

SAP R/3 all versions

SAP enhancement package for SAP ERP all versions

SAP enhancement package for SAP ERP, version for SAP HANA all versions

This document is referenced by


SAP Note/KBA Title

You might also like