CHINA PETROLEUM ENGINEERING & FORMAT NO

REV NO. 0
CONSTRUCTION CORPORATION
SITE CLOSE OUT CHECKLIST DATE
PAGE NO Page 1 of 1

PROJECT NAME TRAIN 3 OF WARA PRESSURE MAINTENANCE PROJECT (NSK) PROJECT-EF/1945


PURPOSE FIRE PREVENTION DATE:
SITE ENGINEER / AREA/ LOCATION:
FOREMEN

GENERAL REQUIREMENTS YES NO N/A NOTES


1. Is there ANY flammable or combustible substance
evident in the containers, piping system, scaffolding
platforms or other equipment which may lead to Fire?

2. Fire extinguishers placed in the prominent areas?

3. Has all combustible material located within 30 feet of


the hot work area been removed? If possible or a fire
resistant shield employed?

4. The work area is properly isolated?

5. Inspect the job site for indication of ignition source

6. All electrically operated equipment’s disconnected from


source?

7. Generator shutdown properly?

8. Access area free from obstructions?

9. Is Housekeeping done around the worksite?

10. Is work permit properly closed?

OTHER REQUIREMENTS / PRECAUTIONS

ENGINEER/FOREMAN NAME & SIGNATURE DATE:


OF

VERIFIED BY NAME & SIGNATURE DATE:


HSE Officer OF DESIGNATION
PERSON