CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION

TRAIN 3 OF WARA PRESSURE MAINTENANCE PROJECT (NSK)


Project-EF/1945

MONTHLY LIFTING TOOLS & TACKLES INSPECTION CHECKLIST (VISUAL INSPECTION)

SI. No. Name Of Lifting Tools/ Tackles Tag No./ ID. No. SWL Condition Area / Location Inspected By

10

11

12

13

14

15
Inspected by: Name: Signature: Date: