1. The document outlines the job hazard analysis for the procurement and installation of a premixer at an open drain oil center, identifying hazards and control measures for each task.
2. Key tasks include excavation work, concrete work, installation of the premixer, fabrication such as cutting and welding, non-destructive testing, installation of instrument tubing, and painting works.
3. Common hazards across tasks include incompetent personnel, ergonomic issues, bad weather, and each task lists specific control measures like using authorized work permits, trained personnel, proper PPE, safe work procedures, and cordoning off work areas.
1. The document outlines the job hazard analysis for the procurement and installation of a premixer at an open drain oil center, identifying hazards and control measures for each task.
2. Key tasks include excavation work, concrete work, installation of the premixer, fabrication such as cutting and welding, non-destructive testing, installation of instrument tubing, and painting works.
3. Common hazards across tasks include incompetent personnel, ergonomic issues, bad weather, and each task lists specific control measures like using authorized work permits, trained personnel, proper PPE, safe work procedures, and cordoning off work areas.
1. The document outlines the job hazard analysis for the procurement and installation of a premixer at an open drain oil center, identifying hazards and control measures for each task.
2. Key tasks include excavation work, concrete work, installation of the premixer, fabrication such as cutting and welding, non-destructive testing, installation of instrument tubing, and painting works.
3. Common hazards across tasks include incompetent personnel, ergonomic issues, bad weather, and each task lists specific control measures like using authorized work permits, trained personnel, proper PPE, safe work procedures, and cordoning off work areas.
PROCUREMENT AND Date: 06/07/2023 PTW No.: RA Ref No.:
Activity : INSTALLATION OF PREMIXER AT THE OPEN DRAIN IN EBOCHA Work Site: EBOCHA OIL CENTER Contractor: BRAIN DEE OIL CENTRE MS Ref No: OPEN DRAIN TECHNIK NIG LTD
TASK STEP HAZARDS CONTROL MEASURES TO MINIMIZE RISK
COMMUNITY RELATION/ MEETINGS
Community protest Liaise with Public Affairs (PAF) and be Security conscious. WITH APPROPRIATE GROUP
1.Pre mob of equipment/trucks before use
2.Use of competent/trained drivers with valid divers licence. 1. Bad Road MOVEMENT OF PERSONS/ EQUIPMENT 3.Use of tag line 2. Bad weather 4.Adhere to company journey management plan BY ROAD 3. Long Distance 5.No night haulage. 4. Swampy 6.Adequate supervision. 5. Truck not pre-mob 7.All vehicles and fasteners are inspected before use. 8.Frequent breaks during a long distance. 1. Unskilled personnel 2. Ergonomic 1. Obtain a duly authorised PTW 3. Injury from spade and jack hammer 2. Use of competent/trained personnel. 4. Poor manual handling 3. Use of appropriate PPEs. 5. Poor house keeping 4. Use of toolbox meetings. EXCAVATION WORK 6. Awkward Posture 5. Adequate supervision 7. Unstable floor 6. Proper house keeping 8. Noise 7. Proper resting period will be ensured (Break Time) 9. Entanglement/hose whip 8. Follow safe work procedure and pre-mobilization of equipments. 10. transmission of vibration to muscle 9. Work area to be cordoned off with caution tapes and appropriate safety signs clearly 11. Bad weather condition displayed. 12. Faulty equipment 1.Obtain a duly authorised PTW 1. Incompetent personnel 2.Use of experienced, competent & trained personnel. 2. Faulty Hand tools 3.Use of appropriate PPEs. CONCRETE WORK 3. Dust 4.Use of toolbox meetings. 4. Wet cement 5.Adequate supervision 5. Cement dust 6.Follow safe work procedure and pre-mobilization of equipments. 6. Slippery environment 7.Proper resting period will be ensured (Break Time 7. Bad Weather 8.Work area to be cordoned off with caution tapes and appropriate safety signs clearly displayed. INSTALLATION OF 10,000 LITERS PRE- 1. Incompetent personnel 1.Obtain a duly authorised PTW MIXER 2. Ergonomic 2.Use of experienced, competent & trained personnel. 3. Bad weather condition 3.Use of appropriate PPEs. 4. Heavy Load 4.Use of toolbox meetings. 5. Use of non-premob equipment 5.Adequate supervision 6. Working at Height 6.Follow safe work procedure and pre-mobilization of equipments to ensure the correct 7. Poor Manual Handling tonnage is employed. 8. Poor Lifting Technique 7.Work area to be cordoned off with caution tapes and appropriate safety signs clearly 9. Faulty Hand tools displayed. 1.Incompetent personnel 2.Ergonomic 1.Obtain a duly authorised PTW 3.Electric currents 2.Use of experienced and competent personnel. 4.Bright light 3.Use of appropriate PPEs. FABRICATION (CUTTING, GRINDING, 5.Ultraviolent radiation 4.Use of welding mask and face shield 6.Toxic fumes and gases WELDING) 5.Use of toolbox meetings. 7.Heat 6.Adequate supervision 8.Fire 7.Follow safe work procedure and pre-mobilization of equipments. 9.Noise 8.Work area to be cordoned off with caution tapes and appropriate safety signs clearly 10. Sparkly light displayed. 11. Flying particles 12. Bad weather condition 1.Obtain a duly authorised PTW 2.Use of experienced, competent & trained personnel. 1. Bad weather condition 3.Use of appropriate PPEs. NDT (RADIOGRAPHY) 2. Gamma energy 4.Use of toolbox meetings. 3. Use of incompetent personnel. 5.Adequate supervision 4. X-ray 6.Follow safe work procedure and pre-mobilization of equipments. 7.Work area to be cordoned off with caution tapes and appropriate safety signs clearly displayed. 1.Obtain a duly authorised PTW 2.Use of experienced, competent & trained personnel. 3.Use of appropriate PPEs. 1.Incompetent personnel 4.Use of LOTO System INSTALLATION OF INSTUMENT TUBING 2.Use of wrong tools 5.Use of toolbox meetings. 3.Ergonomic 6.Adequate supervision 4.Bad weather condition 7.Follow safe work procedure and pre-mobilization of equipments to ensure the correct tonnage is employed. 8.Work area to be cordoned off with caution tapes and appropriate safety signs clearly displayed. 1. In competent personnel 1.Obtain a duly authorised PTW 2. Slippery environment 2.Use of experienced, competent & trained personnel. 3. Bad weather 3.Use of appropriate PPEs PAINTING WORKS 4. Prolong standing 4.Use of toolbox meetings 5. Exposure to paint chemical 5.Adequate supervision 6.Follow safe work procedure and pre-mobilization of equipment 7.Work area to be cordoned off with caution tapes and appropriate safety signs clearly displayed. ELECTRICAL / INSTRUMENTATION 1.In competent personnel 1. Obtain a duly authorised PTW WORK 2.Electrical current 2. Use of experienced, competent & trained personnel. 3.Water 3. Use of appropriate PPEs 4.Exposed Energized Part 4. Avoid water at all time when working 5.Prolong standing 5. Avoid working with damage insulation equipment 6.Adverse Weather Condition 6. Use of circuit breaker 7. Use of LOTO System 8. Use of toolbox 9. Adequate supervision 10. Follow safe work procedure and pre-mobilization of equipment 11. Work area to be cordoned off with caution tapes and appropriate safety signs clearly displayed. 1. Obtain a duly authorised PTW 2. Use of experienced, competent & trained personnel. 3. Use of appropriate PPEs. SITE RESTORATION/ HOUSE KEEPING & 1. Heavy load 4. Use of toolbox meetings. 2. Use of in-experienced personnel 5. Use of tag line PRE-COMMISSIONING 3. Bad Weather 6. Adequate supervision 4. Dust 7. Follow safe work procedure and pre-mobilization of equipments to ensure the correct tonnage is employed. 8. Work area to be cordoned off with caution tapes and appropriate safety signs clearly displayed Following company journey management Community protest Use of pre-mobbed vehicles only DEMOBILIZATION Vehicle break down Adequate supervision Use of competent personnel