Hav Ext DC FRM XXXX
Hav Ext DC FRM XXXX
TRAIN OF KM500
GAS TREATMENT
PLANT
HAV-EXT-DC-FRM-XXXX
Due to incorrect manufacturing, manhole opening direction are different in the field.
It opens in the opposite direction of the orientation plan. (See Sketch Drawing)
Documents 141-059-ME-DET-0039-001-0C
141-059-ME-DET-0043-002-0B
Sketch
Deviation: Query: Effect: Urgent:
Proposed Action (Define all attachments):
Upon your approval, it will be welded according to the change in the sketch drawing.
Section 3 (Decision)
Accept: Accept: (with comments) Reject: Clarify
Sign Off Name: Signature: Date:
Responsible Engineer
Construction Manager
Site Manager
Project Director
NOTE: Only the applicable signatures are required