REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Description

1
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Summary (according to EN 13201:2015)

2
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Summary (according to EN 13201:2015)

Manufacturer NIKKON P 120.1 W

Article No. MURA L ΦLuminaire 16050 lm

Article name 120W LED Street


Lantern (3000K)
(Type 3)

Fitting 1x MURA L 120W


LEDs (3000K)

3
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Summary (according to EN 13201:2015)

120W LED Street Lantern (3000K) (Type 3) (Median, 2 per pole)

Pole distance 25.000 m

(1) Light spot height 10.000 m

(2) Light point overhang 1.700 m

(3) Boom inclination 14.0°

(4) Boom length 2.733 m

Annual operating hours 4000 h: 100.0 %, 240.2 W

Consumption 9608.8 W/km

ULR / ULOR 0.01 / 0.01

Max. luminous intensities ≥ 70°: 358 cd/klm


Any direction forming the specified angle from the ≥ 80°: 257 cd/klm
downward vertical, with the luminaire installed for
≥ 90°: 65.4 cd/klm
use.

Luminous intensity class –


The luminous intensity values in [cd/klm] for
calculation of the luminous intensity class refer to the
luminaire luminous flux according to EN 13201:2015.

Glare index class D.3

MF 0.67

4
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Summary (according to EN 13201:2015)

Results for valuation fields


A maintenance factor of 0.67 was used for calculating for the installation.

Symbol Calculated Target Check

Roadway 2 (M3) Lav 1.60 cd/m² ≥ 1.00 cd/m²

Uo 0.56 ≥ 0.40

Ul 0.89 ≥ 0.60

TI 9% ≤ 15 %

REI 0.68 ≥ 0.30

Roadway 1 (M3) Lav 1.54 cd/m² ≥ 1.00 cd/m²

Uo 0.57 ≥ 0.40

Ul 0.91 ≥ 0.60

TI 9% ≤ 15 %

REI 0.68 ≥ 0.30

Results for energy efficiency indicators

Symbol Calculated Consumption

Access Road at LGDA Dp 0. 025 W/lx*m² –

120W LED Street Lantern De 2. 4 kWh/m² yr 960.9 kWh/yr


(3000K) (Type 3) (Median)

5
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 2 (M3)

Results for valuation field

Symbol Calculated Target Check

Roadway 2 (M3) Lav 1.60 cd/m² ≥ 1.00 cd/m²

Uo 0.56 ≥ 0.40

Ul 0.89 ≥ 0.60

TI 9% ≤ 15 %

REI 0.68 ≥ 0.30

Results for observer

Symbol Calculated Target Check

Observer 1 Lav 1.60 cd/m² ≥ 1.00 cd/m²


Position:
-60.000 m, 12.000 m , 1.500 m
Uo 0.56 ≥ 0.40

Ul 0.89 ≥ 0.60

TI 9% ≤ 15 %

Observer 2 Lav 1.73 cd/m² ≥ 1.00 cd/m²


Position:
-60.000 m, 16.000 m , 1.500 m
Uo 0.58 ≥ 0.40

Ul 0.94 ≥ 0.60

TI 7% ≤ 15 %

6
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 2 (M3)

Maintenance value, horizontal illuminance [lx] (Iso-illuminance curves)

7
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 2 (M3)

Maintenance value, horizontal illuminance [lx] (Value grid)

m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750

17.333 22.60 20.96 18.70 16.88 16.26 16.47 17.57 19.29 21.37 22.71

16.000 25.95 23.82 20.88 18.84 17.97 18.22 19.56 21.61 24.28 25.99

14.667 28.72 26.37 23.11 20.92 19.75 20.03 21.65 24.00 27.03 28.79

13.333 29.93 27.76 24.71 22.22 20.76 21.02 22.88 25.71 28.59 30.56

12.000 30.31 28.18 25.75 23.06 21.19 21.39 23.67 26.65 29.09 30.68

10.667 29.97 27.84 26.65 23.76 21.60 21.83 24.16 27.37 28.54 30.13

Maintenance value, horizontal illuminance [lx] (Value chart)

Eav Emin Emax g1 g2

Maintenance value, horizontal illuminance 23.8 lx 16.3 lx 30.7 lx 0.68 0.53

8
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 2 (M3)

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)

9
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 2 (M3)

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)

m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750

17.333 0.93 0.92 0.89 0.89 0.94 0.95 0.95 0.94 0.95 0.96

16.000 1.14 1.13 1.10 1.13 1.18 1.19 1.21 1.20 1.18 1.17

14.667 1.41 1.42 1.42 1.47 1.52 1.54 1.55 1.55 1.49 1.45

13.333 1.76 1.80 1.82 1.86 1.92 1.97 1.95 1.90 1.82 1.78

12.000 2.01 2.05 2.12 2.16 2.22 2.25 2.25 2.19 2.09 2.02

10.667 1.90 1.94 2.03 2.07 2.12 2.16 2.17 2.14 1.98 1.92

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)

Lav Lmin Lmax g1 g2

Observer 1: Maintenance value, luminance with dry 1.60 cd/m² 0.89 cd/m² 2.25 cd/m² 0.56 0.39
roadway

10
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 2 (M3)

Observer 1: Luminance with new installation [cd/m²] (Iso-illuminance curves)

11
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 2 (M3)

Observer 1: Luminance with new installation [cd/m²] (Value grid)

m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750

17.333 1.39 1.38 1.33 1.33 1.41 1.42 1.42 1.40 1.41 1.43

16.000 1.70 1.69 1.64 1.68 1.77 1.77 1.80 1.79 1.75 1.75

14.667 2.10 2.12 2.11 2.19 2.27 2.29 2.31 2.31 2.22 2.17

13.333 2.63 2.68 2.72 2.77 2.87 2.94 2.90 2.84 2.71 2.66

12.000 3.00 3.07 3.17 3.22 3.31 3.36 3.36 3.27 3.12 3.02

10.667 2.83 2.89 3.04 3.10 3.17 3.22 3.24 3.20 2.96 2.86

Observer 1: Luminance with new installation [cd/m²] (Value chart)

Lav Lmin Lmax g1 g2

Observer 1: Luminance with new installation 2.39 cd/m² 1.33 cd/m² 3.36 cd/m² 0.56 0.39

12
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 2 (M3)

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)

13
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 2 (M3)

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)

m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750

17.333 1.04 1.05 1.02 1.01 1.07 1.06 1.06 1.04 1.05 1.05

16.000 1.31 1.33 1.31 1.33 1.39 1.39 1.40 1.39 1.34 1.31

14.667 1.77 1.78 1.76 1.79 1.84 1.84 1.82 1.80 1.74 1.70

13.333 2.06 2.11 2.13 2.16 2.23 2.26 2.23 2.17 2.08 2.04

12.000 1.95 2.01 2.09 2.13 2.18 2.22 2.23 2.17 2.08 2.01

10.667 1.82 1.85 1.94 1.99 2.04 2.08 2.09 2.06 1.89 1.85

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)

Lav Lmin Lmax g1 g2

Observer 2: Maintenance value, luminance with dry 1.73 cd/m² 1.01 cd/m² 2.26 cd/m² 0.58 0.44
roadway

14
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 2 (M3)

Observer 2: Luminance with new installation [cd/m²] (Iso-illuminance curves)

15
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 2 (M3)

Observer 2: Luminance with new installation [cd/m²] (Value grid)

m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750

17.333 1.55 1.56 1.52 1.50 1.60 1.58 1.59 1.56 1.57 1.57

16.000 1.96 1.99 1.95 1.99 2.07 2.07 2.09 2.07 1.99 1.96

14.667 2.64 2.66 2.63 2.67 2.75 2.75 2.72 2.69 2.59 2.54

13.333 3.07 3.15 3.18 3.22 3.33 3.37 3.32 3.24 3.10 3.05

12.000 2.91 3.01 3.12 3.18 3.25 3.32 3.33 3.25 3.10 2.99

10.667 2.72 2.77 2.90 2.97 3.04 3.10 3.12 3.07 2.82 2.76

Observer 2: Luminance with new installation [cd/m²] (Value chart)

Lav Lmin Lmax g1 g2

Observer 2: Luminance with new installation 2.59 cd/m² 1.50 cd/m² 3.37 cd/m² 0.58 0.44

16
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 1 (M3)

Results for valuation field

Symbol Calculated Target Check

Roadway 1 (M3) Lav 1.54 cd/m² ≥ 1.00 cd/m²

Uo 0.57 ≥ 0.40

Ul 0.91 ≥ 0.60

TI 9% ≤ 15 %

REI 0.68 ≥ 0.30

Results for observer

Symbol Calculated Target Check

Observer 1 Lav 1.66 cd/m² ≥ 1.00 cd/m²


Position:
-60.000 m, 2.000 m, 1.500 m
Uo 0.59 ≥ 0.40

Ul 0.96 ≥ 0.60

TI 7% ≤ 15 %

Observer 2 Lav 1.54 cd/m² ≥ 1.00 cd/m²


Position:
-60.000 m, 6.000 m, 1.500 m
Uo 0.57 ≥ 0.40

Ul 0.91 ≥ 0.60

TI 9% ≤ 15 %

17
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 1 (M3)

Maintenance value, horizontal illuminance [lx] (Iso-illuminance curves)

18
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 1 (M3)

Maintenance value, horizontal illuminance [lx] (Value grid)

m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750

7.333 30.13 28.54 27.37 24.16 21.83 21.60 23.76 26.65 27.84 29.97

6.000 30.68 29.09 26.65 23.67 21.39 21.19 23.06 25.75 28.18 30.31

4.667 30.56 28.59 25.71 22.88 21.02 20.76 22.22 24.71 27.76 29.93

3.333 28.79 27.03 24.00 21.65 20.03 19.75 20.92 23.11 26.37 28.72

2.000 25.99 24.28 21.61 19.56 18.22 17.97 18.84 20.88 23.82 25.95

0.667 22.71 21.37 19.29 17.57 16.47 16.26 16.88 18.70 20.96 22.60

Maintenance value, horizontal illuminance [lx] (Value chart)

Eav Emin Emax g1 g2

Maintenance value, horizontal illuminance 23.8 lx 16.3 lx 30.7 lx 0.68 0.53

19
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 1 (M3)

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)

20
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 1 (M3)

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)

m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750

7.333 1.82 1.85 1.93 1.95 1.99 2.01 2.03 1.99 1.84 1.83

6.000 1.91 1.97 2.02 2.04 2.07 2.10 2.10 2.04 1.95 1.92

4.667 1.99 2.03 2.03 2.04 2.09 2.10 2.06 2.00 1.93 1.93

3.333 1.70 1.72 1.68 1.70 1.73 1.71 1.69 1.67 1.64 1.64

2.000 1.27 1.30 1.27 1.28 1.32 1.30 1.30 1.31 1.28 1.28

0.667 1.02 1.03 1.00 0.99 1.03 1.01 1.00 0.99 1.02 1.03

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)

Lav Lmin Lmax g1 g2

Observer 1: Maintenance value, luminance with dry 1.66 cd/m² 0.99 cd/m² 2.10 cd/m² 0.59 0.47
roadway

21
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 1 (M3)

Observer 1: Luminance with new installation [cd/m²] (Iso-illuminance curves)

22
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 1 (M3)

Observer 1: Luminance with new installation [cd/m²] (Value grid)

m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750

7.333 2.72 2.76 2.87 2.92 2.98 3.00 3.03 2.97 2.74 2.73

6.000 2.85 2.94 3.02 3.04 3.09 3.14 3.13 3.05 2.92 2.87

4.667 2.97 3.03 3.03 3.05 3.12 3.14 3.08 2.98 2.89 2.88

3.333 2.53 2.56 2.51 2.54 2.58 2.56 2.52 2.49 2.44 2.44

2.000 1.90 1.94 1.89 1.92 1.97 1.94 1.94 1.95 1.91 1.91

0.667 1.52 1.54 1.49 1.47 1.53 1.50 1.49 1.48 1.52 1.54

Observer 1: Luminance with new installation [cd/m²] (Value chart)

Lav Lmin Lmax g1 g2

Observer 1: Luminance with new installation 2.47 cd/m² 1.47 cd/m² 3.14 cd/m² 0.59 0.47

23
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 1 (M3)

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)

24
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 1 (M3)

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)

m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750

7.333 1.87 1.91 2.00 2.02 2.06 2.07 2.09 2.05 1.90 1.86

6.000 1.96 2.00 2.05 2.06 2.10 2.12 2.11 2.04 1.95 1.93

4.667 1.71 1.74 1.75 1.76 1.81 1.84 1.81 1.76 1.70 1.69

3.333 1.36 1.39 1.37 1.41 1.44 1.44 1.45 1.45 1.42 1.41

2.000 1.11 1.11 1.07 1.10 1.13 1.12 1.13 1.13 1.14 1.15

0.667 0.92 0.92 0.88 0.88 0.91 0.91 0.90 0.90 0.92 0.94

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)

Lav Lmin Lmax g1 g2

Observer 2: Maintenance value, luminance with dry 1.54 cd/m² 0.88 cd/m² 2.12 cd/m² 0.57 0.42
roadway

25
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 1 (M3)

Observer 2: Luminance with new installation [cd/m²] (Iso-illuminance curves)

26
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA

Access Road at LGDA


Roadway 1 (M3)

Observer 2: Luminance with new installation [cd/m²] (Value grid)

m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750

7.333 2.79 2.86 2.98 3.01 3.07 3.09 3.11 3.06 2.83 2.78

6.000 2.92 2.98 3.06 3.08 3.13 3.17 3.15 3.05 2.91 2.88

4.667 2.56 2.60 2.61 2.63 2.70 2.74 2.70 2.63 2.54 2.53

3.333 2.04 2.07 2.04 2.10 2.15 2.15 2.16 2.16 2.11 2.10

2.000 1.66 1.66 1.60 1.64 1.69 1.68 1.69 1.69 1.69 1.71

0.667 1.38 1.37 1.32 1.32 1.36 1.36 1.34 1.34 1.38 1.40

Observer 2: Luminance with new installation [cd/m²] (Value chart)

Lav Lmin Lmax g1 g2

Observer 2: Luminance with new installation 2.29 cd/m² 1.32 cd/m² 3.17 cd/m² 0.57 0.42

27