Professional Documents
Culture Documents
Access Road at LGDA Alternative 1 - Description - Report - DIalux Simulation
Access Road at LGDA Alternative 1 - Description - Report - DIalux Simulation
1
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
2
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
3
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
MF 0.67
4
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
Uo 0.56 ≥ 0.40
Ul 0.89 ≥ 0.60
TI 9% ≤ 15 %
Uo 0.57 ≥ 0.40
Ul 0.91 ≥ 0.60
TI 9% ≤ 15 %
5
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
Uo 0.56 ≥ 0.40
Ul 0.89 ≥ 0.60
TI 9% ≤ 15 %
Ul 0.89 ≥ 0.60
TI 9% ≤ 15 %
Ul 0.94 ≥ 0.60
TI 7% ≤ 15 %
6
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
7
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750
17.333 22.60 20.96 18.70 16.88 16.26 16.47 17.57 19.29 21.37 22.71
16.000 25.95 23.82 20.88 18.84 17.97 18.22 19.56 21.61 24.28 25.99
14.667 28.72 26.37 23.11 20.92 19.75 20.03 21.65 24.00 27.03 28.79
13.333 29.93 27.76 24.71 22.22 20.76 21.02 22.88 25.71 28.59 30.56
12.000 30.31 28.18 25.75 23.06 21.19 21.39 23.67 26.65 29.09 30.68
10.667 29.97 27.84 26.65 23.76 21.60 21.83 24.16 27.37 28.54 30.13
8
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)
9
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)
m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750
17.333 0.93 0.92 0.89 0.89 0.94 0.95 0.95 0.94 0.95 0.96
16.000 1.14 1.13 1.10 1.13 1.18 1.19 1.21 1.20 1.18 1.17
14.667 1.41 1.42 1.42 1.47 1.52 1.54 1.55 1.55 1.49 1.45
13.333 1.76 1.80 1.82 1.86 1.92 1.97 1.95 1.90 1.82 1.78
12.000 2.01 2.05 2.12 2.16 2.22 2.25 2.25 2.19 2.09 2.02
10.667 1.90 1.94 2.03 2.07 2.12 2.16 2.17 2.14 1.98 1.92
Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)
Observer 1: Maintenance value, luminance with dry 1.60 cd/m² 0.89 cd/m² 2.25 cd/m² 0.56 0.39
roadway
10
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
11
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750
17.333 1.39 1.38 1.33 1.33 1.41 1.42 1.42 1.40 1.41 1.43
16.000 1.70 1.69 1.64 1.68 1.77 1.77 1.80 1.79 1.75 1.75
14.667 2.10 2.12 2.11 2.19 2.27 2.29 2.31 2.31 2.22 2.17
13.333 2.63 2.68 2.72 2.77 2.87 2.94 2.90 2.84 2.71 2.66
12.000 3.00 3.07 3.17 3.22 3.31 3.36 3.36 3.27 3.12 3.02
10.667 2.83 2.89 3.04 3.10 3.17 3.22 3.24 3.20 2.96 2.86
Observer 1: Luminance with new installation 2.39 cd/m² 1.33 cd/m² 3.36 cd/m² 0.56 0.39
12
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)
13
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)
m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750
17.333 1.04 1.05 1.02 1.01 1.07 1.06 1.06 1.04 1.05 1.05
16.000 1.31 1.33 1.31 1.33 1.39 1.39 1.40 1.39 1.34 1.31
14.667 1.77 1.78 1.76 1.79 1.84 1.84 1.82 1.80 1.74 1.70
13.333 2.06 2.11 2.13 2.16 2.23 2.26 2.23 2.17 2.08 2.04
12.000 1.95 2.01 2.09 2.13 2.18 2.22 2.23 2.17 2.08 2.01
10.667 1.82 1.85 1.94 1.99 2.04 2.08 2.09 2.06 1.89 1.85
Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)
Observer 2: Maintenance value, luminance with dry 1.73 cd/m² 1.01 cd/m² 2.26 cd/m² 0.58 0.44
roadway
14
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
15
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750
17.333 1.55 1.56 1.52 1.50 1.60 1.58 1.59 1.56 1.57 1.57
16.000 1.96 1.99 1.95 1.99 2.07 2.07 2.09 2.07 1.99 1.96
14.667 2.64 2.66 2.63 2.67 2.75 2.75 2.72 2.69 2.59 2.54
13.333 3.07 3.15 3.18 3.22 3.33 3.37 3.32 3.24 3.10 3.05
12.000 2.91 3.01 3.12 3.18 3.25 3.32 3.33 3.25 3.10 2.99
10.667 2.72 2.77 2.90 2.97 3.04 3.10 3.12 3.07 2.82 2.76
Observer 2: Luminance with new installation 2.59 cd/m² 1.50 cd/m² 3.37 cd/m² 0.58 0.44
16
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
Uo 0.57 ≥ 0.40
Ul 0.91 ≥ 0.60
TI 9% ≤ 15 %
Ul 0.96 ≥ 0.60
TI 7% ≤ 15 %
Ul 0.91 ≥ 0.60
TI 9% ≤ 15 %
17
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
18
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750
7.333 30.13 28.54 27.37 24.16 21.83 21.60 23.76 26.65 27.84 29.97
6.000 30.68 29.09 26.65 23.67 21.39 21.19 23.06 25.75 28.18 30.31
4.667 30.56 28.59 25.71 22.88 21.02 20.76 22.22 24.71 27.76 29.93
3.333 28.79 27.03 24.00 21.65 20.03 19.75 20.92 23.11 26.37 28.72
2.000 25.99 24.28 21.61 19.56 18.22 17.97 18.84 20.88 23.82 25.95
0.667 22.71 21.37 19.29 17.57 16.47 16.26 16.88 18.70 20.96 22.60
19
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)
20
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)
m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750
7.333 1.82 1.85 1.93 1.95 1.99 2.01 2.03 1.99 1.84 1.83
6.000 1.91 1.97 2.02 2.04 2.07 2.10 2.10 2.04 1.95 1.92
4.667 1.99 2.03 2.03 2.04 2.09 2.10 2.06 2.00 1.93 1.93
3.333 1.70 1.72 1.68 1.70 1.73 1.71 1.69 1.67 1.64 1.64
2.000 1.27 1.30 1.27 1.28 1.32 1.30 1.30 1.31 1.28 1.28
0.667 1.02 1.03 1.00 0.99 1.03 1.01 1.00 0.99 1.02 1.03
Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)
Observer 1: Maintenance value, luminance with dry 1.66 cd/m² 0.99 cd/m² 2.10 cd/m² 0.59 0.47
roadway
21
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
22
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750
7.333 2.72 2.76 2.87 2.92 2.98 3.00 3.03 2.97 2.74 2.73
6.000 2.85 2.94 3.02 3.04 3.09 3.14 3.13 3.05 2.92 2.87
4.667 2.97 3.03 3.03 3.05 3.12 3.14 3.08 2.98 2.89 2.88
3.333 2.53 2.56 2.51 2.54 2.58 2.56 2.52 2.49 2.44 2.44
2.000 1.90 1.94 1.89 1.92 1.97 1.94 1.94 1.95 1.91 1.91
0.667 1.52 1.54 1.49 1.47 1.53 1.50 1.49 1.48 1.52 1.54
Observer 1: Luminance with new installation 2.47 cd/m² 1.47 cd/m² 3.14 cd/m² 0.59 0.47
23
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)
24
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)
m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750
7.333 1.87 1.91 2.00 2.02 2.06 2.07 2.09 2.05 1.90 1.86
6.000 1.96 2.00 2.05 2.06 2.10 2.12 2.11 2.04 1.95 1.93
4.667 1.71 1.74 1.75 1.76 1.81 1.84 1.81 1.76 1.70 1.69
3.333 1.36 1.39 1.37 1.41 1.44 1.44 1.45 1.45 1.42 1.41
2.000 1.11 1.11 1.07 1.10 1.13 1.12 1.13 1.13 1.14 1.15
0.667 0.92 0.92 0.88 0.88 0.91 0.91 0.90 0.90 0.92 0.94
Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)
Observer 2: Maintenance value, luminance with dry 1.54 cd/m² 0.88 cd/m² 2.12 cd/m² 0.57 0.42
roadway
25
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
26
REPAIR AND IMPROVEMENT OF ACCESS ROAD AT LGDA
m 1.250 3.750 6.250 8.750 11.250 13.750 16.250 18.750 21.250 23.750
7.333 2.79 2.86 2.98 3.01 3.07 3.09 3.11 3.06 2.83 2.78
6.000 2.92 2.98 3.06 3.08 3.13 3.17 3.15 3.05 2.91 2.88
4.667 2.56 2.60 2.61 2.63 2.70 2.74 2.70 2.63 2.54 2.53
3.333 2.04 2.07 2.04 2.10 2.15 2.15 2.16 2.16 2.11 2.10
2.000 1.66 1.66 1.60 1.64 1.69 1.68 1.69 1.69 1.69 1.71
0.667 1.38 1.37 1.32 1.32 1.36 1.36 1.34 1.34 1.38 1.40
Observer 2: Luminance with new installation 2.29 cd/m² 1.32 cd/m² 3.17 cd/m² 0.57 0.42
27