EMBANKMENT PRICE PHILIPPINES, 

EMBANKMENT PRICES IN THE PHILIPPINES, PHILIPPINE


CONSTRUCTION MATERIAL PRICES

Embankment Price List Philippines


JULY 29, 2018 PHILCONPRICES5 COMMENTS
Costs stated herein are average prices in Php for Northern Mindanao (first quarter of 2018). We
hope this will also help our friends from Luzon and Visayas.

Embankment (per cubic meter)


Common Borrow        384.40
Selected Borrow        392.40
Mixed Sand & Gravel        585.11
Rock        602.56
Aggregate Subbase Course
Aggregate Subbase Course Material        818.13
Aggregate Base Course        934.89
Crushed Grading A        839.13
Uncrushed Grading A        926.00
Crushed Grading B        831.63
Uncrushed Grading B        837.00
Blended Weathered Limestone and Crush Stone        818.22
Filler Materials        401.00
Crushed Aggregate Base (per cubic meter)
Crushed Grading A        921.63
Crushed Grading B        875.43
Lime Stabilized Road Mx Base Course (per cubic meter)
Lime Stabilized Mixed Soil Aggregate Base Course Crushed Grading A        693.75
Lime Stabilized Mixed Soil Aggregate Base Course Crushed Grading B         662.78
Lime Stabilized Mixed Soil Aggregate Base Course Uncrushed Grading A        670.00
Lime Stabilized Mixed Soil Aggregate Base Course Uncrushed Grading B        641.11
Aggregate Surface Course (per cubic meter)
Crushed Grading A        878.22
Crushed Grading B        864.33
Crushed Grading C        884.75
Crushed Grading D        856.38
Uncrushed Grading A        826.13
Uncrushed Grading B        817.38
Uncrushed Grading C        812.63
Uncrushed Grading D        793.25
Construction Labor Rates
Description Unit  Rate
 Foreman hourly 70.76
 Electrician hourly 64.89
 Plumber hourly 64.89
 Leadman hourly 64.89
 Heavy Equipment Operator hourly 59.02
 Highly Skilled Worker hourly 59.02
 Light Equipment Operator hourly 55.21
 Driver hourly 51.33
 Skilled Worker hourly 51.33
 Semi-skilled Worker hourly 47.46
 Unskilled Worker hourly 39.59
Painting Works
Description / Item Unit Ave. Price
Paint Tinting Color Ltr 182.22
Paint Aluminum gal 661.27
Paint Enamel gal 666.82
Paint Latex Gloss gal 642.20
Paint Latex Semi-Gloss gal 652.00
Paint Red Lead gal 597.09
Thinner Paint gal 317.89
Thinner Lacquer gal 481.40
Paint Metal Epoxy gal 776.00
Paint Primer Solvent gal 735.60
Brush Paint (101mm) pc 77.50
Brush Roller (152mm) pc 94.45
Brush Steel (101mm) pc 36.20
Oil Paint Ltr 108.09
Spar Varnish Ltr 1286.91
Lacquer Putty Kg 655.70
Concrete neutralizer gal 429.45
Putty Knife pc 25.00
Roller paint # 9 w/ tray pc 150.00
2″paint brush pc 35.00
Putty Knife pc 25.00
Paint thinner gal 280.00
Sand paper #120 dozen 120.00

PHILIPPINE PRODUCTIVITY RATIOS


DESCRIPTION MANHOUR/UNIT UNIT
1.STRUCTURAL EXCAVATION
Common excavation
Hand 6.00 MH/M3
Machine 0.50 MH/M3
Rock excavation 8.00 MH/M3
Hauling of spoils 1.00 MH/M3
2.STRUCTURAL BACKFILL
By hand 5.00 MH/M3
By machine 2.00 MH/M3
3.TRENCHING
By hand 6.00 MH/M3
By machine 0.50 MH/M3
EXCAVATION- MANUAL
Common earth 8.00 MH/M3
Loam of sand 1.31 MH/M3
Clay or heavy soil 1.64 MH/M3
Rock 2.63 MH/M3
EXCAVATION- MECHANICAL
Common earth 6.67 MH/M3
Rock with jack hammer 16.67 MH/M3
BACKFILLING
Common manual 0.82 MH/M3
Gravel fill manual 5.00 MH/M3
TRENCHING & BACFILLING OF UNDERGROUND PIPING USING EXCAVATION
MATLS MANUAL FROM:
0 – 2m Depth 1.25 MH/LM
2 – 3m Depth 1.67 MH/LM
3 – 4m Depth 2.50 MH/LM
4 – 5m Depth 3.33 MH/LM
Placing binder gravel 0.11 MH/M3
Escombro backfilling 0.21 MH/M3
Spreading,tamping & grading 0.48 MH/M2
Mechanical compaction, plate compaction 0.06 MH/M3
MANUAL CLEARING & GRUBBING
Clearing under growth & trees – 12″ 0.05 MH/M2
Clearing under growth & shrubs 0.03 MH/M2
Disposal of soil 1.69 MH/M3
Hauling of soil 1.00 MH/M3
Gravel fill 2.07 MH/M3
EXCAVATION – CRANE & CLAMPSHELL
With 8 men & 2 carpenters 1.07 MH/M3
5.ROOFING AND SIDING
Roofing
Metallic 0.97 MH/m2
Non-Metallic 1.51 MH/m2
Siding
Metallic 1.29 MH/m2
Non-Metallic 1.51 MH/m2
CONCRETE WORKS
4.CONCRETE WORKS
Grade members
Formworks 2.54 MH/M2
Concreting 8.54 MH/M3
Rebar 0.07 MH/kg
Finishing 0.40 MH/M2
Suspended members
Formworks 3.28 MH/M2
Concreting 16.70 MH/M3
Rebar 0.08 MH/kg
Finishing 0.80 MH/M2
Embeded metal 0.27 MH/kg
Water proofing 1.82 MH/M2
Joint filler 0.30 MH/lm
PLACING CONCRETE
Slab on Fill 5.00 MH/M3
Slip Form 25.00 MH/M3
Floor Finish Unhardened 1.00 MH/M3
Concrete finished hardened 1.43 MH/M3
REBAR WORKS
Ground floor installation 0.07 MH/M3
Upper floor installation 0.08 MH/M3
Fabrication 0.10 MH/M3
Mixing manual 16.00 MH/M3
Mixing machine 1.80 MH/M3
MORE THAN  1.8 M3 POUR
Chute from truck 7.00 MH/M3
Crane & bucket 14.00 MH/M3
Wheeling 27.00 MH/M3
Finishing 2.80 MH/M3
FORMWORKS & CARPENTRY WORKS
FORM WORKS INSTALLATION
Wall on ground 2.00 MH/M2
Wall above ground 2.35 MH/M2
Beams 3.08 MH/M2
Columns 2.35 MH/M2
Suspended slab
Suspended slab 0 – 18″ 1.67 MH/M2
Suspended slab 10 – 36″ up 3.33 MH/M2
Elevated & shored slab forming
Forming only 8.60 MH/M2
Forming & Shoring 11.00 MH/M2
Wood wall & Partition 0.50 MH/M2
FORM WORKS FABRICATION
Form works fabrication 1.00 MH/M2
STRIPPING OF FORMS
Wall on ground 0.25 MH/M2
Wall above 10″ 1.29 MH/M2
Beams 1.03 MH/M2
Columns 0.85 MH/M2
Suspended slab
Suspended slab 0 – 18″ 0.83 MH/M2
Suspended slab 10 – 36″ up 1.08 MH/M2
Elevated & shored slab forming – strip of forms 3.50 MH/M2
Floor slab at grade – strip of forms 2.80 MH/M2
INSTALLATION OF CARPENTRY WORKS
Plywood partition 1.00 MH/PC
T & G Flooring and Siding 0.14 MH/B.F.
Ceiling & frame work 0.36 MH/B.F.
Siding frame work 0.27 MH/B.F.
Flooring framing 0.97 MH/B.F.
Wooden post erection 0.43 MH/B.F.
Truss Fabrication 0.35 MH/B.F.
Truss Installation 0.80 MH/B.F.
Girt Installation 0.21 MH/B.F.
Plates Installation 0.13 MH/B.F.
Purlins Installation 0.27 MH/B.F.
Fascia board Installation 0.46 MH/B.F.
1/4″ or 3/4″ thk. plywood
Cutting by manual 1.00 MH/PC
Assembly 0.42 MH/M2
ARCHITECTURAL SPECIALTIES
DOORS
Wooden 2.37 MH/M2
Steel 7.64 MH/M2
Aluminum 8.07 MH/M2
Cyclone wire 7.64 MH/M2
WINDOWS
Glass 3.23 MH/M2
Louver 4.63 MH/M2
Steel 32.29 MH/M2
PARTITIONS
single wall 2.48 MH/M2
Wooden wall 3.44 MH/M2
Wooden Louver 3.44 MH/M2
cyclone Louver 5.38 MH/M2
PAINTING ( 3 coats )
Equipment 0.24 MH/f2
Pipes 0.30 MH/f2
Miscellaneous
0.24 MH/f2
STRUCTURAL STEEL WORKS
7. STRUCTURAL STEEL
Fabrication
Light 110-130 MH/MT
Heavy 60-90 MH/MT
Erection
Light 70-100 MH/MT
Heavy 40-60 MH/MT
WELDING ( one pass only )
1- Welder and 1- Helper ( 16 total mh ) 40-50 Lf/day
G.1 STRUCTURAL STEEL
Fabrication
Heavy weight 50-90 MH/MT
Light weight 100-125 MH/MT
Grating 1 1/4″ x 3/16″ 3.0 – 3.5 MH/SF
Star threat grating 4.0 – 5.0 MH/SF
Erection
Heavy Structural steel 30 – 60 MH/MT
Light Structural steel 60- 90 MH/MT
Stacks ( Inc. full welding ) 250 – 300 MH/MT
Tanks ( Inc. full welding ) 200 – 275 MH/MT

FINISHING AND MASONRY WORKS


H. CHB
4” CHB
Laying 8.0 – 10 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day
6” CHB
Laying 7.0 – 9.0 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day
8” CHB
Laying 6.0 – 8.0 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day
These are average productivity ratios of an average worker.

Plumbing and Sanitary Works


Sanitary Lines Unit  Price
100mm dia. PVC pc 753.50
75mm dia. PVC pc 485.00
50mm dia PVC (vp & wp) pc 330.00
PVC Clean Out w/ plug & sealing ring 100mm pc 95.00
PVC Clean Out w/ plug & sealing ring 150mm pc 114.00
PVC P-Trap w/ plug & sealing ring 50mm pc 66.00
PVC Te (150mm) pc 95.00
PVC Tee (100mm) pc 95.00
PVC WYE (100mm) pc 95.00
PVC WYE REDUCER (100mmX50mm) pc 85.00
PVC WYE REDUCER (100mmX75mm) pc 95.00
PVC ELBOW 90° (100mm) pc 95.00
PVC ELBOW 90° (75mm) pc 85.00
PVC Elbow 90° (50mm) pc 66.00
PVC Elbow 45° (100mm) pc 95.00
PVC Elbow 45° (75mm) pc 85.00
PVC Elbow 45° (50mm) pc 66.00
PVC Coupling (100mm) pc 95.00
Vulca Seal pc 440.00
Cold Water Lines Unit  Price
20mmØ Polypropylene, Type 3, PN20 pc. 250.00
20mmØ Coupling pc. 95.00
20mmØ Tee pc. 95.00
20mmØ Elbow pc. 95.00
Teflon Tape roll 27.50

METAL STRUCTURES
Region II – (4th Quarter of 2018)
Material Description Unit  Ave. Price (Php)
Milled Steel Plates Checked FY36 kg                     60.00
Milled Steel Plates FY36 kg                     60.27
Steel Sheet Stainless kg                   120.09
Bridge Rollers and Rockers pc               4,575.00
Pins and Pin Holes FY60 kg                     83.55
Sliding Bearing pc               5,025.00
Structural Steel Angular Bar (A36) kg                     70.30
Structural Steel Channel Bar (A36) kg                     70.30
Structural Steel Square Bar (A36) kg                     73.00
Structural Steel I-Beam Bar (A36) kg                     73.00
Strutural Steel Wide Flange (A36) kg                     73.45
Rivets High Tension kg                     73.45
Washers high Tension kg                     74.36
Cork Expansion Joint Filler (.019m x 1.2m x 2.44m) pc                   718.82
Bolts High Tension kg                   144.27

Masonry Works
Concrete Hollow Blocks (CHB) 4″ pc          10.00
Concrete Hollow Blocks (CHB) 6″ pc          16.00
Portland Cement, 40 kg. bag        265.95
Washed sand cu.m.     1,165.00
10 mm. Dia. x 6.0 M. DSB pc.        156.20
Tie Wire #16 kg.          65.00
Stone Masonry
Cement bag 260.00
Sand cu.m. 1,232.05
Q Fill cu.m. 1,207.05
Weep Holes (PVC) Lm. 228.33
Filter Cloth sq.m. 280.00
Boulders cu.m. 1,282.05
Screened Sand cu.m. 1,521.00
Screened Gravel cu.m. 1,581.00

Concreting Works
Concrete
Soil Poisoning – Termicide Liter        325.00
Gravel cu.m     1,010.00
Wash Sand cu.m     1,035.00
Portland Cement, 40kg Bag        260.00
Pozzolan Cement, 40kg Bag        260.00
Steel Bars
 10mm Diameter Deformed Bars pc        156.00
 12mm Diameter Deformed Bars pc        223.00
 16mm Diameter Deformed Bars pc        394.00
 20mm Diameter Deformed Bars pc        645.00
 #16 G.I. Tie Wire kg          16.00
Formworks
 2 x 3 x 10′ Coco lumber pc        280.00
 2 x 4 x 10 Coco lumber pc        280.00
 1/2″ x 4′ x 8′ Plywood pc        660.00
 6mm thk. Lawanit board pc        209.00
 6mm thk. Ordinary Plywood pc        330.00
 1″x2″x8′ Hard wood or its equivalent pc          65.00
 2″x2″x8′ Hard wood or its equivalent pc          65.00
 2″x2″x8’Hardwood or its equivalent pc          65.00
 2″x24″x8′ Hard wood or its equivalent pc          65.00

DESCRIPTION  HOURLY RATE (PHP)


Earthmoving Equipment
Bulldozer            3,379.00
Payloader            1,733.00
Motorized Road Grader            2,173.00
Compaction Equipent+
Plate Compactor               123.00
Lifting Equipment
Crawler Crane            1,522.00
Crawler Crane            1,902.00
Crawler Crane            2,151.00
Truck Mounted Crane            1,631.00
Truck Mounted Crane            1,861.00
Truck Mounted Crane            2,606.00
Truck Mounted, Scissor Lift, Terrain            1,386.00
Excavating Equipment
Backhoe            1,537.00
Backhoe w/ Breaker            1,998.10
Backhoe, Wheel Mounted               922.00
Portable Breaker               129.38
Foundation Equipment
Diesel Hammer            1,286.00
Vibro Hammer            2,123.00
Vibro Hammer w/ Hydraulic Power Pack            4,118.00
Vibro Hammer            3,069.00
Drilling Rig            3,932.00
Concreting Equipment
Concrete Screeder               545.00
Concrete Paver            6,765.00
One Bagger Mixer               172.00
Transit Mixer            1,318.00
Hauling Equipment
Dump Truck            1,420.00
Cargo/Service Truck               783.00
Boom Truck            1,017.90
Cargo/Service Truck            1,212.00
Water Truck/Pump            2,450.00
Air Equipment
Air Compressor               965.00
Air Compressor               502.00
Air Compressor, Portable               450.00
Air Compressor               205.00
Diamond Drill               201.25
Jackhammer               150.00
Pneumatic Drilling Machine               170.00
Pumping Equipment
Water Pump, 100 mm suction Ø               266.25
Water Pump, 100 mm suction Ø               123.38
Pumpcrete            2,076.00
Power Generating Equipment
Generator Set               872.87
Generator Set            2,147.27
Shop Equipment
Welding Machine               391.00
Welding Machine               371.00
Special Support Equipment
Chainsaw                 75.36
Miscellaneous Equipment
Concrete Vibrator                 91.25
Bar Cutter               219.75
Bar Bender               351.50
Others
Drop Hammer w/ accessories            5,000.00
1 Air Compressor w/ 2 Jack Hammer            1,265.00
Cutting Outfit                 45.45
Pile Integrity Testing (Sonic) & accessories
(includes professional fee of Strcutural Engineer and reports)          65,000.00
Pile Integrity Testing & accessories
(includes professional fee of Strcutural Engineer and reports)          37,000.00
Dynamic Pile Testing
(includes professional fee of Structural Engineer)        103,000.00
Lighting System/Tower Lights               543.50
Bentonite Bin               280.00
Bentonite Mixer               173.00
SPT & Desanding Machine               559.00
Tremie Pipe Set               320.00

Reinforced Concrete Pipe Prices


RCP 1200mm x 1m pc     4,116.00
RCP 910mm x 1m pc     2,860.00
RCP 750mm x 1m pc     1,607.00
RCP 600mm x 1m pc     1,250.00
RCP 450mm x 1m pc        803.00
RCP 375mm x 1m pc        714.00
RCP 300mm x 1m pc        625.00
Ready Mixed Concrete Prices
Ready Mixed Concrete 3000psi @ 28 Days cu.m     4,503.00
Ready Mixed Concrete 3000psi @ 14 Days cu.m     4,766.00
Ready Mixed Concrete 3000psi @ 7 Days cu.m     4,911.00
Ready Mixed Concrete 3500psi @ 28 Days cu.m     4,754.00
Ready Mixed Concrete 3500psi @ 14 Days cu.m     4,948.00
Ready Mixed Concrete 3500psi @ 7 Days cu.m     5,244.00
Ready Mixed Concrete 4000psi @ 28 Days cu.m     5,151.00
Ready Mixed Concrete 4000psi @ 14 Days cu.m     5,347.00
Ready Mixed Concrete 5000psi @ 28 Days cu.m     5,707.00

Construction Heavy
Equipment and Tools
Rates in the
Philippines
JULY 13, 201813 COMMENTS

Revised July 13, 2018 with respect to second


quarter of 2018 average rates.

These construction heavy equipment prices should


help you do your own estimate. Everything is in
Philippine Peso currency. These prices are taken
from “Association of Carriers and Equipment
Lessors, (ACEL) Inc.” presently 2014 ACEL Rates
as used in most projects of the government.

DESCRIPTION  HOURLY RATE (PHP)


Earthmoving Equipment
Bulldozer            3,379.00
Payloader            1,733.00
Motorized Road Grader            2,173.00
Compaction Equipment
Plate Compactor               123.00
Lifting Equipment
Crawler Crane            1,522.00
Crawler Crane            1,902.00
Crawler Crane            2,151.00
Truck Mounted Crane            1,631.00
Truck Mounted Crane            1,861.00
Truck Mounted Crane            2,606.00
Truck Mounted, Scissor Lift,            1,386.00
Terrain
Excavating Equipment
Backhoe            1,537.00
Backhoe w/ Breaker            1,998.10
Backhoe, Wheel Mounted               922.00
Portable Breaker               129.38
Foundation Equipment
Diesel Hammer            1,286.00
Vibro Hammer            2,123.00
Vibro Hammer w/ Hydraulic Power            4,118.00
Pack
Vibro Hammer            3,069.00
Drilling Rig            3,932.00
Concreting Equipment
Concrete Screeder               545.00
Concrete Paver            6,765.00
One Bagger Mixer               172.00
Transit Mixer            1,318.00
Hauling Equipment
Dump Truck            1,420.00
Cargo/Service Truck               783.00
Boom Truck            1,017.90
Cargo/Service Truck            1,212.00
Water Truck/Pump            2,450.00
Air Equipment
Air Compressor               965.00
Air Compressor               502.00
Air Compressor, Portable               450.00
Air Compressor               205.00
Diamond Drill               201.25
Jackhammer               150.00
Pneumatic Drilling Machine               170.00
Pumping Equipment
Water Pump, 100 mm suction Ø               266.25
Water Pump, 100 mm suction Ø               123.38
Pumpcrete            2,076.00
Power Generating Equipment
Generator Set               872.87
Generator Set            2,147.27
Shop Equipment

Welding Machine               391.00


Welding Machine               371.00
Special Support Equipment
Chainsaw                 75.36
Miscellaneous Equipment
Concrete Vibrator                 91.25
Bar Cutter               219.75
Bar Bender               351.50
Others

Drop Hammer w/ accessories            5,000.00


1 Air Compressor w/ 2 Jack Hammer            1,265.00
Cutting Outfit                 45.45
Pile Integrity Testing (Sonic) &          65,000.00
accessories
(includes professional fee of
Strcutural Engineer and reports)
Pile Integrity Testing &          37,000.00
accessories
(includes professional fee of
Strcutural Engineer and reports)
Dynamic Pile Testing        103,000.00
(includes professional fee of
Structural Engineer)
Lighting System/Tower Lights               543.50
Bentonite Bin               280.00
Bentonite Mixer               173.00
SPT & Desanding Machine               559.00
Tremie Pipe Set               320.00

Painting Works

Description / Item Unit Ave. Price

Paint Tinting Color Ltr 182.22

Paint Aluminum gal 661.27

Paint Enamel gal 666.82

Paint Latex Gloss gal 642.20

Paint Latex Semi-Gloss gal 652.00

Paint Red Lead gal 597.09

Thinner Paint gal 317.89


Thinner Lacquer gal 481.40

Paint Metal Epoxy gal 776.00

Paint Primer Solvent gal 735.60

Brush Paint (101mm) pc 77.50

Brush Roller (152mm) pc 94.45

Brush Steel (101mm) pc 36.20

Oil Paint Ltr 108.09

Spar Varnish Ltr 1286.91

Lacquer Putty Kg 655.70

Concrete neutralizer gal 429.45

Putty Knife pc 25.00

pc 150.00

2″paint brush pc 35.00

Putty Knife pc 25.00

Paint thinner gal 280.00

Sand paper #120 dozen 120.00

Truss Works
Item Name Unit Price
6mm thk.x 65mm x 65mm x 6.0 pc   2,248.70
Angle bar(T & B Chord)
6mm thk. x 50mm x 50mm x 6.0 pc   1,704.66
Angle bar(Web Member)
10mm thk. Gusset plate welded sq.m.   4,245.52
to truss
150mm x 65mm x 20mm x pcs.   1,089.00
2mm LC-Purlins
255mm x 90mm x 25mm x pcs.   4,057.57
5mm thk.  LC- Channel beam
300mmx12mm dia. Plain Bar w/ pcs.       74.12
standard nuts & washers @
both ends: Sagrod
350mmx12mm dia. Plain Bar w/ pcs.       76.74
standard nuts & washers @
both ends: Sagrod
380mmx12mm dia. Plain Bar w/ pcs.       78.31
standard nuts & washers @
both ends: Sagrod
465mmx12mm dia. Plain Bar w/ pcs.       82.76
standard nuts & washers @
both ends: Sagrod
550mmx12mm dia. Plain Bar w/ pcs.       87.22
standard nuts & washers @
both ends: Sagrod
12mm. Thk. Buckle Plate sq.m.   5,100.44
16mm dia. Plain Bar cross pc.      419.10
bracing
16 mm dia. Turn buckle pc.      137.50
12mm x 250mm x 300mm Base sq.m.   5,100.44
Plate
100 x 100 x 6mm thk. Angular pc.   1,880.00
base plate
50 x 50 x 5mm Angular Bar pc.   1,392.12
75 x 75 x 6mm x 130mm Clip pc.   2,611.40
Angle to Purlins
Welding Rod (Fuji) box   2,330.00
Oxygen(content only) tank   1,575.00
Acetylene(content only) tank   2,000.00
Hacksaw Blade pc.       65.00
Paint brush # 4 pc.       65.00
Paint brush # 2 pc.       35.00
Red Lead Primer gal.      429.45
Paint Thiner gal.      551.25
Curtain Walls and Glazing Works Prices

Material Description Unit Price


8mm thk Reflective Tempered sq.m.      33,600.00
Glass Door
12mm thk Frameless Glass sq.m.      33,000.00
Door
12mm thk Reflective Tempered sq.m.      37,000.00
Glass Door
12mm thk Clear Tempered sq.m.        6,700.00
Glass Wall
Light Blue Light Reflective sq.m.        7,400.00
Tempered Glass Curtain Wall
Aluminum Wall Cladding sq.m.        4,200.00

Aluminum Canopy sq.m.        4,400.00

Railing with 12mm thk Clear l.m.      27,000.00


Tempered Glass

THHN #14 – 2.0MM2- ₱2,700.00 (150 METERS PER BOX)


THHN #12 – 3.5MM2 – ₱3,960.00  (150 METERS PER BOX)
THHN #10 – 5.5MM2 – ₱6,060.00  (150 METERS PER BOX)
THHN #8 – 8.0MM2 – ₱no stock (100 METERS PER BOX)
THHN #6 – 14.0MM2 – ₱no stock (150 METERS PER BOX)
THHN #4 – 22.0MM2 – ₱no stock (150 METERS PER BOX)

THHN #2 – 30.0mm2 – ₱no stock (150 meters per box)

thhn #1/19 – 38.0mm2 – ₱no stock (300meters per box)

Thhn Wire 14mm2 #6 AWG ——– 125.79 per meter (150meters per roll)

Thhn Wire 22mm2 #4 AWG ———— 197.50 per meter (150meters per roll)

Thhn Wire 30mm2 #2 AWG ————– 287.75 per meter (150meters per roll)

Thhn Wire 38mm2 #1 AWG ————– 418.00 per meter (300meters per roll)

Thhn Wire 50mm2 1/0 AWG ————– 469.50 per meter (300meters per roll)
Thhn Wire 60mm2 2/0 AWG ————– 577.75 per meter (300meters per roll)

Thhn Wire 80mm2 3/0 AWG   —————- 716 per meter (300meters per roll)

Thhn Wire 100mm2 4/0 AWG  —————- 882.66 per meter (300meters per roll)

Thhn Wire 125mm2 – 250 MCM ——– 1,125.00 per meter (300meters per roll)

Thhn Wire 150mm2 – 300 MCM ——– 1,342.50 per meter (300meters per roll)

Thhn Wire 200mm2 – 400 MCM ——– 1,691.68 per meter (300meters per roll)

Thhn Wire 250mm2 – 500 MCM ——– 2,175.00 per meter (300meters per roll)