TUTORIAL 3: PENGEKOSAN BERASASKAN AKTIVITI (ABC)

SOALAN 1

CD Express, Inc., provides CD duplicating services to software companies. The customer


provides a master CD from which CD Express makes copies. An order from a customer can
be for a single copy or for thousands of copies. Most jobs are broken down into batches to
allow smaller jobs, with higher priorities, to have access to the machines.

A number of activities carried out at CD Express are listed below.

a. Sales representatives' periodic visits to customers to keep them informed about the
services provided by CD Express.
b. Ordering labels from the printer for a particular CD.
c. Setting up the CD duplicating machine to make copies from a particular master CD.
d. Loading the automatic labeling machine with labels for a particular CD.
e. Visually inspecting CDs and placing them by hand into protective plastic cases prior
to shipping.
f. Preparation of the shipping documents for the order.
g. Periodic maintenance of equipment.
h. Lighting and heating the company's production facility.
i. Preparation of quarterly financial reports.

Required:

Classify each of the activities above as either a unit-level, batch-level, product-level,


customer-level, or organization-sustaining activity. An order to duplicate a particular CD is a
product-level activity. Assume the order is large enough that it must be broken down into
batches.

SOALAN 2
Syarikat Ramli telah mengenal pasti aktiviti overhed, kos aktiviti dan penggerak aktiviti
untuk tahun akan datang seperti berikut:

Aktiviti Kos anggaran Penggerak Aktiviti Penggunaan


Aktiviti
Penyediaan peralatan RM 120,000 Bilangan penyediaan 300
Kos pesanan 90,000 Bilangan tempahan 9,000
Kos pemesinan 210,000 Jam mesin 21,000
Penerimaan 100,000 Jam penerimaan 5,000
Jum. Kos OH RM520,000

Ramli mengeluarkan dua model mesin pencuci kain dengan kos prima dan permintaan
aktiviti berikut:
Model A Model B
Bahan langsung RM 150,000 RM 200,000
Buruh langsung RM 120,000 RM 120,000
Unit siap 8,000 4,000
Jam buruh langsung 3,000 1,000
Bilangan penyediaan 200 100
Bilangan tempahan 3,000 6,000
Jam mesin 12,000 9,000
Jam penerimaan 1,500 3,500

Aktiviti normal syarikat ialah 4,000 jam buruh langsung.

Dikehendaki:
a) Tentukan kos seunit setiap model menggunakan jam buruh langsung sebagai asas
alokasi overhed (kadar tunggal /kadar kilang menyeluruh)

b) Tentukan kos seunit setiap model menggunakan ABC.

c) Manakah satu kaedah yang menghasilkan peruntukan kos yang lebih tepat? Kenapa?

SOALAN 3

2
Machine Trade Incorporated is a manufacturer of printing machine. Presently the company
produces two model which are Unique and Standard model. Unique model is produced to
meet small and targeted customers meanwhile standard model is produced for general market
and normally it is sold at shooping malls. Following are production data and activities for
January 2020.

Model Unique Model Standard


Unit 5,000 25,000
No of batch 50 10
No of transfered 250 20
Direct material cost RM25,000 RM75,000
Direct labour cost RM8,400 RM19,000

The detail of support activities as follows:

Aktivities Cost Cost Driven


Material acquisition and RM20,000 Direct material cost
inspection
Material transfer 10,800 No of transfered
Scheduling 24,000 No of batch
54,800

Required:

a. Based on traditional method (on the direct labour cost basis),


(i) Total cost for both model
(ii) Cost per unit for both model

b. Based on ABC method, calculate


(i) Total cost for both model
(ii) Cost per unit for both model

SOALAN OBJEKTIF

Maklumat digunakan untuk soalan 1 - 3

Syarikat Galaxy mengeluarkan tiga jenis peranti kawalan jauh: Ekonomi, Standard, dan
Deluxe. Syarikat itu, yang menggunakan kos berasaskan aktiviti, telah mengenal pasti lima
aktiviti (dan penggerak kos yang berkaitan). Setiap aktiviti, kos belanjawan, dan penggerak
kos berkaitan seperti di bawah:

Aktiviti Kos Penggerak Kos

3
Pengendalian bahan RM 225,000 Bilangan bahagian
Kemasukan bahan 2,475,000 Bilangan bahagian
Mesin automatik 840,000 Jam mesin
Penamat 170,000 Jam buruh langsung
Pembungkusan 170,000 Pesanan dihantar
Jumlah RM 3,880,000

Maklumat berikut adalah berkaitan dengan tiga lini produk untuk tahun hadapan:
Ekonomi Standard Deluxe
Unit akan dikeluarkan 10,000 5,000 2,000
Pesanan yang akan dihantar 1,000 500 200
Bilangan bahagian per unit 10 15 25
Jam mesin per unit 1 3 5
Jam buruh langsung per unit 2 2 2

1. Apakah kadar kelompok/kadar aktiviti Syarikat Galaxy bagi aktiviti bahan pengendalian?

A. RM1.00 per bahagian.


B. RM2.25 per bahagian.
C. RM6.62 per jam buruh.
D. RM13.23 per bahagian.
E. Kadar selain senarai di atas.

2. Apakah kadar kelompok Syarikat Galaxy untuk aktiviti mesin automatik?

A. RM24.00 per jam mesin.


B. RM24.50 per jam buruh.
C. RM49.42 per unit
D. RM50.00 per jam mesin.
E. Kadar selain senarai di atas.
3. Di bawah sistem pengekosan berasaskan aktiviti, apakah kos overhead seunit produk
Ekonomi?

A. RM141.
B. RM164.
C. RM225.
D. RM228.
E. Nilai selain senarai di atas.

4. Rajendran Corporation telah menyediakan data berikut dari sistem pengekosan aktiviti:  

Kelompok kos aktiviti Jumlah kos Jumlah aktiviti


Pemasangan……………… RM689,720 44,000 Jam mesin
Pemprosesan RM90,763 1,900 Pesanan
pesanan………
Pemeriksaan……………… RM119,535 1,950 Pemeriksaan
 
Syarikat mengeluarkan 340 unit keluaran P23F setahun, yang memerlukan sejumlah 710 jam
mesin, 80 pesanan, dan 40 jam pemeriksaan setahun. Kos bahan langsung keluaran adalah

4
RM40.05 se unit dan kos buruh langsung adalah RM14.35 se unit. Keluaran dijual pada
RM121.90 se unit .

Dikehendaki:

Kirakan margin keluaran (i.e untung) bagi keluaran P23F mengikut sistem pengekosan
berdasarkan aktiviti.

A. RM9,223.20
B. RM7,853.60
C. RM5,401.60
D. RM22,950.00

Maklumat berikut digunakan untuk menjawab soalan 5 dan 6

Syarikat Bintang telah menyediakan maklumat berikut tentang kos overhednya untuk tahun
hadapan:
Upah dan gaji RM340,000
Susut nilai 120,000
Sewa 140,000
Jumlah RM600,000

Syarikat mempunyai sistem pengekosan berasaskan aktiviti dengan tiga kumpulan kos
aktiviti berikut serta jangkaan aktiviti untuk tahun akan datang:

Kumpulan Kos Aktiviti Jumlah Aktiviti


Pemasangan 30,000 jam buruh
Tempahan pesanan 500 tempahan
Lain-lain Tidak berkaitan

Aktiviti lain-lain tidak mempunyai ukuran aktiviti; ia digunakan untuk mengumpul kos
kapasiti idle dan kos pengekalan organisasi. Pengagihan penggunaan sumber untuk kumpulan
kos aktiviti adalah seperti berikut:

Kumpulan Kos Aktiviti


Pemasangan Tempahan Lain-lain Jumlah
Pesanan
Upah dan gaji 40% 35% 25% 100%
Susut nilai 15% 45% 40% 100%
Sewa 35% 30% 35% 100%

5. Jumlah kos overhed bagi kumpulan kos tempahan pesanan ialah

A) RM203,000
B) RM215,000
C) RM182,000
D) Tidak dapat ditentukan.

5
6. Kadar aktiviti untuk kumpulan kos tempahan pesanan ialah
A) RM430 se tempahan
B) RM420 se tempahan
C) RM360 se tempahan
D) RM440 se tempahan

7. Hierarki kos bagi aktiviti keselamatan kilang dan pemasangan sesuai dikategorikan
sebagai tahap unit, tahap kelompok, tahap keluaran atau pengekalan organisasi?
Keselamatan Pemasangan
A) Keluaran Unit
B) Kelompok Kelompok
C) Organisasi Unit
D) Organisasi Keluaran

8. Kesemua aktiviti berikut boleh dikategorikan sebagai aktiviti tahap kelompok dalam
sistem pengekosan berasaskan aktiviti (ABC) KECUALI
A) Penghantaran – tahap kelompok
B) Penerimaan dan pemeriksaan – tahap kelompok
C) Penyediaan pengeluaran – tahap kelompok
D) Cukai harta - pengekalan organisasi

9. Maklumat tentang kumpulan kos aktiviti Syarikat Salute, sebuah syarikat guaman, diberikan
seperti berikut:

Kumpulan Kos Aktiviti Jumlah Kos Jumlah Penggerak


Kos/Aktiviti
Pencarian isu perundangan RM30,480 640 jam kajian
Pertemuan dengan pelanggan RM1,182,239 7,253 jam pertemuan
Penyediaan dokumen RM92,840 5,740 dokumen

Kadar aktiviti untuk kumpulan kos “pertemuan dengan pelanggan” ialah


A) RM95 sejam pertemuan
B) RM61 sejam pertemuan
C) RM163 sejam pertemuan
D) RM1,182,29 sejam pertemuan

10. Maklumat berkaitan dengan sistem pengekosan berasaskan aktiviti (ABC) Syarikat Mak Cun

6
Kumpulan Kos Aktiviti Jumlah Kos Jumlah Penggerak
Kos/Aktiviti
Pemasangan RM228,060 18,000 jam mesin
Pemprosesan tempahan RM 34,068 1,200 tempahan
Pemeriksaan RM125,560 1,720 jam pemeriksaan

Syarikat Mak Cun mengeluarkan 420 unit produk D28K setahun, yang memerlukan secara
jumlah 460 jam mesin, 80 tempahan dan 10 jam pemeriksaan. Kos bahan langsung seunit
produk ialah RM48.96 dan kos buruh langsung seunit produk ialah RM25.36. Berasaskan
kaedah ABC, kos purata seunit D28K hampir kepada:
A) RM95.34 seunit
B) RM93.60 seunit
C) RM74.32 seunit
D) RM89.93 seunit