DESIGN AND CONSTRUCTION OF SEWER TUNNELS FOR THE DEEP TUNNEL SEWERAGE SYSTEM PHASE 2 PROJECT - CONTRACT T -09

Appendix I Gasket Design

Page 1619 of 1971


\\Cowi.net\subs\DAL\Hong Kong\Projects\03 JOBS\JH0044-DTSS2-T09 Detailed Design\Reports\20a. Std Seg (N3-N)\Rev. 1.4 (rev.1)\122103-TBM5-RT-SL-
0001Rev.1_20180914_(clean).docx
Appendix I March 2018

Gasket
As LCAL is current developing the type of gasket to be used, a 33 mm gasket with 66.5 kN/m peak
force has been assumed in the calculations. To ensure the adequacy of gasket and gasket groove
performance, the following checks have been carried out considering a long-term condition, with
𝛼cc,pl .= 0.6 and 𝛾c = 1.5.

 Shear failure of gasket groove


 Gasket groove edge spalling failure

Also, gasket performance has also been checked considering joint rotation and gasket gap
determined based on:

 0.20% (6.0 mm on radius) calculated maximum long-term deflection as given in Section


7.3.3 of the report;
 0.25% additional distortion induced by future development as per Section 2-3-3 of the
specification.

The joint rotation of 0.61° has been determined, which gives a gasket opening gap of
approximately 2.5 mm. As the 66.5 kN/m gasket is the ultimate force the gasket could apply, a
partial load factor of 1.1 has been considered in the calculations.

Gasket force typically relaxes by approximately more than 20% after segment installation. An
example of gasket short term relaxation is presented below. For circumferential joint shear dowels,
a 15% short term relaxation of gasket has been adopted while no further information is available
at the moment of designing this.

Page 1620 of 1971


C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\7.
Gasket\T09_Joint_Rotation_Check_for_Gasket_EC2_(flat)_20180723.xlsx
Contract Deep Tunnel Sewerage System Phase II Job ref
JH044
Contract T09
Part of structure Gasket Rotation Check Calc. sheet No.
(0.35% + 0.25%)
Calculations by Checked by Approved by Date
7/23/2018
COWI Hong Kong Ltd. RYWO

CALCULATIONS NOTES

Joint Opening and Bursting of Segmental Lining Flat Joint


Calculation according to EN 1992-1-1:2008/EN 1992-1-1:2004 and BS8110-1-1997.

wi w wo
h

1. Calculation input
1.1. Internal forces and ovalization
Maximum thrust (SLS) Q max = 0.0 kN/m
Minimum thrust (SLS) Q min = 0.0 kN/m
Maximum thrust (ULS) U max = 0.0 kN/m
Ovalization ratio Ω = 0.450%

1.2. Tunnel geometry and section properity


Outer diameter Do = 7.150 m
Inner diameter Di = 6.550 m
Segment width bs = 1.000 m
Centroid radius Rc = 3.425 m
Lining width h = 0.300 m
Second moment I = h3/12 = 0.002 m4/m

1.3. Segment joint geometry


Outer groove wo = 0.063 m
Inner groove wi = 0.025 m
Tolerance w tol = 0.005 m
Joint thickness w = h - w o - w i - w tol = 0.207 m
Longitudinal groove wL = 0.000 m
Joint contact width bc = bs - 2 wL = 1.000 m

1.4. Typical segment geometry


Typical segment angle m = 67.500 deg
Segment chord length Lc = 2R csin(m /2) = 3.806 m

1.5. Material properties


Concrete grade Grade C50
Concrete strength f ck = 50,000 kPa
Concrete strength γc = 1.50
Longterm effect coefficient α cc = 0.85
Concrete strength f cm = f ck + 8000 = 58,000 kPa
Concrete strength f cd = α cc f ck / γ c = 28,333 kPa
0.3
Concrete elastic modulus E cm = 22[(f ck + 8)/10] = 3.70E+07 kPa Table 3.1 EN 1992-1-1

Allowable stress in steel fs = 200,000 kPa

Page 1621 of 1971


Printed on 7/23/2018 6:24 PM Page 1 of 2
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\7.
Gasket\T09_Joint_Rotation_Check_for_Gasket_EC2_(flat)_20180723.xlsx
Contract Deep Tunnel Sewerage System Phase II Job ref
JH044
Contract T09
Part of structure Gasket Rotation Check Calc. sheet No.
(0.35% + 0.25%)
Calculations by Checked by Approved by Date
7/23/2018
COWI Hong Kong Ltd. RYWO

CALCULATIONS NOTES

Joint Opening and Bursting of Segmental Lining Flat Joint


Calculation according to EN 1992-1-1:2008/EN 1992-1-1:2004 and BS8110-1-1997.

2. Ring ovalization
y
A
P L

m α 𝛽
O N C B M x

2.1. Dimensions
Ovalization deflection BM = Rc Ω = 0.015 m
Deflected radius (long) OM = R c + BM = 3.440 m
Deflected radius (short) OP = R c - BM = 3.410 m
AB = Lc = 3.806 m
α = (180 - m )/2 = 56.250 deg

2.2. Equations of deformed lining shape (ellipse)


LN 2 ON 2 ON 2
2 + = 1 → LN 2 = 1 - OP 2 Eq. 2A
OP OM 2 OM 2

(OM - ON )2 + LN 2 = LM 2 Eq. 2B

AB = LM Eq. 2C

Using equations 2A, 2B and 2C:


OP 2
1 - ON 2 - 2OM ON + OM 2 + OP 2 - AB 2 = 0
OM 2
0.018 ON 2 - 6.9 ON + 9.0 = 0

ON = 1.309 m

β = cos-1[(OM - ON )/LM ] = 55.946 deg


=
Birdsmouthing angle θ = 2 (α - β ) = 0.6084 deg
= 0.0106 rad

Page 1622 of 1971


Printed on 7/23/2018 6:24 PM Page 2 of 2
Project Deep Tunnel Sewerage System Phase II By Ryan Wong
Structure Gasket Quick Check (33 mm) Date 7/23/2018

Radial joint and gasket material information


Max. ovalization 0.45% (from double ring model)
Joint rotation angle, θ 0.0106 rad
wg
w
Lining thickness 300.00 mm
Caulking groove 25.00 mm
Outer groove 63.00 mm θ δ
Joint face, w 212.00 mm
Gasket groove, w g 38.00 mm w'

Distance to gasket CL, w ' = w + w g/2 231.00 mm


Rotation opening, δ = 2 w ' sin (θ/2) 2.45 mm
Joint Rotation
Testing hydrostatic pressures (2 times) 13.00 bars
Max. gasket force 66.50 kN/m
100 year residual stress 65%
Gasket Force Fg
f ck 50 MPa
f ctk,0.05 2.9 MPa (Table 3.1 EN 1992)
f ctd,pl = 0.6 f ctk,0.05 / 1.5 1.16 MPa (Table 3.1 EN 1992)
45°

Gasket force Check


Shear failure
Failure surface to extrados (see figure) 44.0 mm Shear Failure
Shear surface distance (45 deg) 62.2 mm
Share shrength along slip surface, S shear 72.2 kN/m

Gasket Force Fg
Spalling failure
Failure surface to extrados (see figure) 25.0 mm
Shear surface distance (45 deg) 35.4 mm
Max. possible spalling force Fg/2
Share shrength along slip surface, S spall 41.0 kN/m

Allowable gasket force


45°
Partial load factor adopted, γ g 1.1
Shear failure model: F g,allow = S shear/(γ g sin 45o) 92.8 kN/m
Shear failure model: F g,allow = 2 S spall/(γ g cos 45o) 105.5 kN/m

Maximum allowable gasket force 92.8 kN/m > 66.5 kN/m Edge Saplling Failure

Page 1623 of 1971


RADIAL JOINT ARRANGEMENT

Page 1624 of 1971


DESIGN AND CONSTRUCTION OF SEWER TUNNELS FOR THE DEEP TUNNEL SEWERAGE SYSTEM PHASE 2 PROJECT - CONTRACT T -09

Appendix J Joint Fixings Design


› J1. Radial joint bolts design

› J2. Circumferential joint shear dowels design

Page 1625 of 1971


\\Cowi.net\subs\DAL\Hong Kong\Projects\03 JOBS\JH0044-DTSS2-T09 Detailed Design\Reports\20a. Std Seg (N3-N)\Rev. 1.4 (rev.1)\122103-TBM5-RT-SL-
0001Rev.1_20180914_(clean).docx
J1. Radial joint bolts design

Page 1626 of 1971


C:\Users\niwa\COWI\Ryan Wong - 10. Bored Tunnel\04. DDA\04. Cals\8a. Bolt Design\DTSS2_T09_Bolt design_Daeyrong-gasket_20180411.xlsx

Contract Job ref.


Deep Tunnel Sewerage System Phase II JH044

Part of structure Calc. sheet No.


Design of bolt in radial joint

Originator Checked by Approved by Date


16/04/2018
COWI Hong Kong Ltd. NIWA RYWO CHHY

CALCULATIONS NOTES

Design of bolt in radial joint


ETAG 001, Annex C - Design methods for anchorages
BS 4190 - ISO metric black hexagon bolts, screws and nuts - Specification

Gasket force N Gasket

Bolt tensile
θb
NEL load Tb
Y-direction

dw Lag Lab

dnom

Pocket side Insert side


X-direction
Caulking groove
1. Segmental lining geometry
Lining thickness h = 0.300 m

2. Bolting data
Nos. of bolts Nb = 2 bolts
Bolt angle to horizontal θb = 28.0 ˚ 0.02316
Outter dia. of anchor bolt d nom = 0.02316 m (BS 4190 - Table 10)
Bolt washer diameter dw = 0.050 m 0.03
Distance to caulking groove L ab = 0.125 m

Bolt strength grade Gb = 8.8 (BS 4190 - Table 7)


Bolt char. tensile strength f uk,b = 800,000 kPa
Bolt char. yield strength f yk,b = 640,000 kPa fuk,b/1.25
2
Threaded area of bolt Ab = ϖ (d nom/2) = 0.0004 m²
Bolt washer area Aw = ϖ (d w/2)2 = 0.0020 m²

3. Bolt embedment length


Pocket side embed. length h ef,p = 0.200 m 0.274
Insert side embed. length h ef,i = 0.150 m 0.16

4. Gasket geometry and compression load in radial joint 2.0


Nominal segment width L gh = 1.600 m cos = 2/2.04-> =
Radial joint taper angle θt = 9.46 ˚ 11.36
Ring taper thickness Tr = 0.060 m 0.04
Max. gasket force Ng = 66.5 kN/m (short term force)

100kN/m
Distance to caulking groove L ag = 0.231 m 0.33
Gasket total length Lg = L gh / cosθ t + T r / 2 = 1.65 m
Total gasket compr. load N = Ng Lg = 109.9 kN

Page 1627 of 1971


Printed on 16/04/2018 at 11:19 Page 1 of 5
C:\Users\niwa\COWI\Ryan Wong - 10. Bored Tunnel\04. DDA\04. Cals\8a. Bolt Design\DTSS2_T09_Bolt design_Daeyrong-gasket_20180411.xlsx

Contract Job ref.


Deep Tunnel Sewerage System Phase II JH044

Part of structure Calc. sheet No.


Design of bolt in radial joint

Originator Checked by Approved by Date


16/04/2018
COWI Hong Kong Ltd. NIWA RYWO CHHY

CALCULATIONS NOTES

Moment ab 'O'=
Design of bolt in radial joint N*Lag = NEL * Lab
ETAG 001, Annex C - Design methods for anchorages
BS 4190 - ISO metric black hexagon bolts, screws and nuts - Specification

5. Design load of bolt


Partial load factor γL = 1.10
Bolt load X-component N EL = N L ag / L ab = 203.0 kN (moment equilibrium)
Total bolt tensile load Tb = N EL / (N b cos θ b) = 115.0 kN/bolt
Design bolt tensile load T bd = γ LT b = 126.5 kN/bolt

6. Concrete material properties


Char. cylinder strength f ck = 50,000 kPa
Char. cube strength f ck,cube = 60,000 kPa
Concrete material factor γc = 1.5
Long term effects coefficient α cc = 1.0 (Gasket force is temporary
construction load, i.e.
Design concrete strength f cd = α cc f ck / γ c = 33,333 kPa shorterm)

7. Reinforcing steel material properties


Char. yield strength of steel f yk,RF = 500,000 kPa
Partial material factor γ RF = 1.15
Shear reinforcement
8. Shear reinforcement
Nos. of reinforcement N RF = 4 bars
Reinforcement dia. d RF = 13 mm

9. Partial FOS for concrete cone failure


Partial facor for installation γ2 = 1.0 (as lining segments anchor
are cast in precisely, γ2 =
Partial factor for concrete cone resistance 1.0 is adopted)
γ Mc = γ cγ 2 = 1.5

Page 1628 of 1971


Printed on 16/04/2018 at 11:19 Page 2 of 5
C:\Users\niwa\COWI\Ryan Wong - 10. Bored Tunnel\04. DDA\04. Cals\8a. Bolt Design\DTSS2_T09_Bolt design_Daeyrong-gasket_20180411.xlsx

Contract Job ref.


Deep Tunnel Sewerage System Phase II JH044

Part of structure Calc. sheet No.


Design of bolt in radial joint

Originator Checked by Approved by Date


16/04/2018
COWI Hong Kong Ltd. NIWA RYWO CHHY

CALCULATIONS NOTES

Design of bolt in radial joint


ETAG 001, Annex C - Design methods for anchorages
BS 4190 - ISO metric black hexagon bolts, screws and nuts - Specification

10. Check against steel failure

Steel failure

Bolt tensile load Tb

Pocket side

(ETAG 001 Annex C


10.1. Partial material factor for tensile failure
Y Ms>=1.4)
Partial material factor γ Ms = Max (1.2/(f yk,b/f uk,b),1.4) = 1.5

10.2. Bolt tensile capacity


Bolt char. tensile resistance N Rk,s = A b f uk,b = 337.02 kN
Bolt design tensile resistanceN Rd,s = N Rk,s / γ Ms = 224.68 kN
Okay, bolt tensile capacity sufficient.

11. Concrete bearing capacity

Washer
dnom

Bolt tensile
load, Tb

dw
Bolt

11.1. Partially loaded area (EN 1992 Section 6.7)


Concrete bearing area A cs0 = Aw- Ab = 0.0015 m² Acs0
Distribution area A cs1 = 32(A w - A b) = 0.0139 m²
Design bearing stress f cd,b = f cd min[(A cs1 / A cs0)0.5, 3] = 100,000 kPa

11.2. Bearing capacity check


Design bear capacity N Rd,cs = f cd,b A cs = 154.22 kN
Okay, concrete bearing capacity sufficient.
Acs1

Page 1629 of 1971


Printed on 16/04/2018 at 11:19 Page 3 of 5
C:\Users\niwa\COWI\Ryan Wong - 10. Bored Tunnel\04. DDA\04. Cals\8a. Bolt Design\DTSS2_T09_Bolt design_Daeyrong-gasket_20180411.xlsx

Contract Job ref.


Deep Tunnel Sewerage System Phase II JH044

Part of structure Calc. sheet No.


Design of bolt in radial joint

Originator Checked by Approved by Date


16/04/2018
COWI Hong Kong Ltd. NIWA RYWO CHHY

CALCULATIONS NOTES

Design of bolt in radial joint


ETAG 001, Annex C - Design methods for anchorages
BS 4190 - ISO metric black hexagon bolts, screws and nuts - Specification

12. Non-cracked concrete cone failure check


12.1. Concrete cone failure checking (pocket side)

Cone failure

hef,p Bolt tensile load Tb


Cmax

Pocket side

Cmin θc

Min. edge distance C min = 0.098 m


Max. edge distance C max = 0.204 m

Critical edge distance C cr,N = 3 h ef,p / 2 = 0.300 m


Angle of concrete cone θc = arc tan (h ef,p /C cr,N) = 33.7 ˚
Critical spacing S cr,N = 2 C cr,N = 0.600 m

Cone area (no edge) A cN,0 = S cr,N S cr,N = 0.360 m²


Actual cone area A cN = [(C min+min(C max,C cr,N)]S cr,N = 0.181 m²

Crack condition coefficient k1 = 10.1 (non-cracked concrete)


Initial char. tensile resist. N Rk,c0 = k 1 √(f ck,cube) h ef,p1.5 = 221.28 kN

Edge effect factor ψ s,N = 0.7+0.3C min/C cr,N = 0.80


Shear spalling factor ψ re,N = 1.00
Group effect factor ψ ec,N = 1.00 (no anchor group)

Char. tensile resistance N Rk,c = N Rk,C0(A cN/A cN,0)ψ s,Nψ re,Nψ ec,N Cone failure

= 89.04 kN

Design tensile resistance N Rd,c = N Rk,c/γ Mc = 59.36 kN


Insufficient concrete capacity. Reinforcement required.

12.2. Reinforcement requirement (pocket side)


Required rebar area A RF,req = √3 (T bd γ RF / f yk,RF) = 504 mm² Shear rebars

Provided rebar area A RF,pro = 531 mm² (shear cone failure is either
fully taken by concrete or
Okay rebars)

Page 1630 of 1971


Printed on 16/04/2018 at 11:19 Page 4 of 5
C:\Users\niwa\COWI\Ryan Wong - 10. Bored Tunnel\04. DDA\04. Cals\8a. Bolt Design\DTSS2_T09_Bolt design_Daeyrong-gasket_20180411.xlsx

Contract Job ref.


Deep Tunnel Sewerage System Phase II JH044

Part of structure Calc. sheet No.


Design of bolt in radial joint

Originator Checked by Approved by Date


16/04/2018
COWI Hong Kong Ltd. NIWA RYWO CHHY

CALCULATIONS NOTES

Design of bolt in radial joint


ETAG 001, Annex C - Design methods for anchorages
BS 4190 - ISO metric black hexagon bolts, screws and nuts - Specification

12.3. Concrete cone failure checking (insert side)

Cone failure
θc Cmin

Bolt tensile load Tb


hef,i Cmax

Insert side

Min. edge distance C min = 0.125 m


Max. edge distance C max = 0.184 m

Critical edge distance C cr,N = 3 h ef,i / 2 = 0.225 m


Angle of concrete cone θc = arc tan (h ef,i /C cr,N) = 33.7 ˚
Critical spacing S cr,N = 2 C cr,N = 0.450 m

Cone area (no edge) A cN,0 = S cr,N S cr,N = 0.203 m²


Actual cone area A cN = [(C min+min(C max,C cr,N)]S cr,N = 0.139 m²

Crack condition coefficient k1 = 10.1 (non-cracked concrete)


Initial char. tensile resist. N Rk,c0 = k 1 √(f ck,cube) h ef,i1.5 = 143.73 kN

Edge effect factor ψ s,N = 0.7+0.3C min/C cr,N = 0.87


Shear spalling factor ψ re,N = 1.00
Group effect factor ψ ec,N = 1.00 (no anchor group)

Char. tensile resistance N Rk,c = N Rk,C0(A cN/A cN,0)ψ s,Nψ re,Nψ ec,N Cone failure
= 85.69 kN

Design tensile resistance N Rd,c = N Rk,c/γ Mc = 57.12 kN


Insufficient concrete capacity. Reinforcement required.

12.4. Reinforcement requirement (insert side)


Required rebar area A RF,req = √3 (T bd γ RF / f yk,RF) = 504 mm² Shear rebars

Provided rebar area A RF,pro = 531 mm² (shear cone failure is either
fully taken by concrete or
Okay rebars)

Page 1631 of 1971


Printed on 16/04/2018 at 11:19 Page 5 of 5
J2. Circumferential joint shear dowels design
 Shear dowel design
 Shear dowel socket design
 Product references

Page 1632 of 1971


C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\TBM_shear_dowels_20180419a_RW.xlsx

Contract Deep Tunnel Sewerage Tunnel Phase II Job ref.


Contract T-09
Part of structure Calc. sheet No.
Circumferential Shear Dowels Design

Orginator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. RYWO

CALCULATIONS NOTES

Circumferential Joint Shear Dowels


Reference OPTIMAS ANIXER data sheets of shear dowel ANIX 60 and 80

The circumferential joint shear dowels design considers the following criteria:
▪ Keeping gasket in full compression
▪ Overturning stability of segments during ring erection (to hold segment in place)
▪ Rotational stability of lining ring under TBM torque

1. Material properties
1.1. Shear dowel
No. of dowels provided Nd = 11
Ultimate tensile capacity R dt,u = see sections below
Ultimate shear capacity R dv,u = see sections below
Parital material factor γd = 1.25
Design tensile capacity R dt,d = R dt,u / γ d = see sections below
Design shear capacity R dv,d = R dv,u / γ d = see sections below
Load-displacement curve -- = (see Sec. 3.2)

1.2. Concrete
Unit weight γc = 25.0 kN/m³ (self-weight partial load
factor of 1.5 installation
Partial load factor γ L,w = 1.50 uncertainties during
consturction)

1.3. Gasket
Max. compression force F g,k = 66.5 kN/m
Short-term relaxation φg = 75% (relaxation after 5 min.
typically, provided by
Partial load factor γ L,g = 1.10 gasket manufacturer by
Ultimate gasket force F g,d = γ L φ g F g,k = 54.9 kN/m testing)

Load-gap curve -- = (see Sec. 3.1)

2. Bored tunnel geometries


2.1. General arrangements
Inner diameter Di = 6.550 m
Outer diameter Do = 7.150 m
Centroid diameter Dc = (D o + D i) / 2 = 6.850 m
Lining thickness h = (D o - D i) / 2 = 0.300 m
Segment width b = 1.600 m
Typical segment angle θ = 67.500 deg
Segment arc length L arc = ϖ D c θ / 360 = 4.035 m

2.2. Circumferential joint arrangements


Packing thickness tp = 2.0 mm
Extrados to gasket CL dist. dg = 44.0 mm
Total gasket length Lg = ϖ (D o - 2 d g) = 22.186 m

2.3. TBM geometry


Cutter head diameter D TBM = 7.560 m
Shield length L TBM = 11.000 m

Page 1633 of 1971


Printed on 4/19/2018 at 4:41 PM Page 1 of 9
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\TBM_shear_dowels_20180419a_RW.xlsx

Contract Deep Tunnel Sewerage Tunnel Phase II Job ref.


Contract T-09
Part of structure Calc. sheet No.
Circumferential Shear Dowels Design

Orginator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. RYWO

CALCULATIONS NOTES

Circumferential Joint Shear Dowels


Reference OPTIMAS ANIXER data sheets of shear dowel ANIX 60 and 80

3. Criterion 1: Keeping gasket in full compression


3.1. Gasket load-displacement relationship
This section presents gasket load-displacement relationship provided by the gasket
manufacturer. The short-term relaxation has been incorporated in evaluating the
gasket forces.

SLS dowel force -- = φ g F g,k L g / N d


ULS dowel force -- = γ L,g φ g F g,k L g / N d

Table 3.1 From gasket data sheet:


Gap (mm) F g,k (kN/m) φ g F g,k (kN/m) SLS (kN/dowel) ULS (kN/dowel)
0 66.5 49.9 100.6 110.7
1 49.9 37.4 75.4 83.0
3 34.9 26.2 52.8 58.1
5 27.4 20.6 41.5 45.6
7 22.4 16.8 34.0 37.3
9 19.1 14.3 28.9 31.8
11 15.0 11.2 22.6 24.9
13 11.6 8.7 17.6 19.4
15 5.0 3.7 7.5 8.3
17 0.0 0.0 0.0 0.0

70

Fg,k (kN/m)
60
φg Fg,k (kN/m)

50
Gasket Force (kN/m)

40

30

20

10

0
0 2 4 6 8 10 12 14 16 18
Displacement (mm)

Figure 3.1 Gasket gap-force relationship

Page 1634 of 1971


Printed on 4/19/2018 at 4:41 PM Page 2 of 9
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\TBM_shear_dowels_20180419a_RW.xlsx

Contract Deep Tunnel Sewerage Tunnel Phase II Job ref.


Contract T-09
Part of structure Calc. sheet No.
Circumferential Shear Dowels Design

Orginator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. RYWO

CALCULATIONS NOTES

Circumferential Joint Shear Dowels


Reference OPTIMAS ANIXER data sheets of shear dowel ANIX 60 and 80

3. Criterion 1: Keeping gasket in full compression (cont.)


3.2. Shear dowel load displacement relationship
This section presents shear dowel load-displacement relationship provided by the
shear dowel manufacturer. The curves are used to evaluate an equilibrium tensile
force for shear dowels design.

Table 3.2. ANIX 60 dowels.


Displacement (mm) Disp. + t p (mm) Capacity (kN) Design Cap. (kN)
0 2 0 0.0
1 3 12 9.6
2 4 40 32.0
3 5 60 48.0
4 6 72 57.6
5 7 80 64.0
6 8 88 70.4
7 9 96 76.8
8 10 100 80.0
9 11 100 80.0

Table 3.3. ANIX 80 dowels.


Displacement (mm) Disp. + t p (mm) Capacity (kN) Design Cap. (kN)
0 2 0 0.0
1 3 12 9.6
2 4 36 28.8
3 5 60 48.0
4 6 82 65.6
5 7 96 76.8
6 8 106 84.8
7 9 114 91.2
8 10 124 99.2
9 11 135 108.0

160
Dowel Force (kN/dowel)

140
120
100
80
60
40
ANIX 60
20
ANIX 80
0
0 2 4 6 8 10 12
Dowel Displacement (mm)

Figure 3.2. Dowel displacement-force diagram.


Page 1635 of 1971
Printed on 4/19/2018 at 4:41 PM Page 3 of 9
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\TBM_shear_dowels_20180419a_RW.xlsx

Contract Deep Tunnel Sewerage Tunnel Phase II Job ref.


Contract T-09
Part of structure Calc. sheet No.
Circumferential Shear Dowels Design

Orginator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. RYWO

CALCULATIONS NOTES

Circumferential Joint Shear Dowels


Reference OPTIMAS ANIXER data sheets of shear dowel ANIX 60 and 80

3. Criterion 1: Keeping gasket in full compression (cont.)


3.3. Force equilibrium
This section presents the ULS and SLS equilibrium states between the gasket forces
and mobilized tensile resistances in shear dowels.
▪ ULS forces equilibrium: to examine whether dowel tensile capacity is sufficient.
(7 mm gap consists of 2
▪ SLS forces equilibrium: to examine if gasket gap < 7 mm as per M&W spec.
mm packing and 5 mm
requirement as per M&W
2 mm joint packing has been considered in the dowel displacement as the shear spec Section 2-4-2)

dowel will not be under tension when the displacement is under 2 mm.

120

ANIX 60
100 ANIX 80

ULS gasket force


Dowel Force (kN/dowel)

80

60

40

20

0
0 5 10 15 20
Dowel Displacement (mm)

Figure. 3.3. ULS forces equilibrium.

ULS equilibrium force -- = from Figure 3.3 = 50.0 kN/dowel

Both ANIX 60 and ANIX 80 have sufficient capacities to hold the gasket in compression.

Page 1636 of 1971


Printed on 4/19/2018 at 4:41 PM Page 4 of 9
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\TBM_shear_dowels_20180419a_RW.xlsx

Contract Deep Tunnel Sewerage Tunnel Phase II Job ref.


Contract T-09
Part of structure Calc. sheet No.
Circumferential Shear Dowels Design

Orginator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. RYWO

CALCULATIONS NOTES

Circumferential Joint Shear Dowels


Reference OPTIMAS ANIXER data sheets of shear dowel ANIX 60 and 80

3. Criterion 1: Keeping gasket in full compression (cont.)


3.3. Force equilibrium (cont.)

160

140 ANIX 60

ANIX 80
120
Dowel Force (kN/dowel)

SLS gasket force

100

80

60

40

20

0
0 5 10 15 20
Dowel Displacement (mm)

Figure. 3.4. SLS forces equilibrium.

SLS equilibrium force -- = from Figure 3.4 = 45.0 kN/dowel


SLS equilibrium displacement -- = from Figure 3.4 = 4.5 mm

Both ANIX 60 and ANIX 80 have sufficient stiffness to maintain the gasket gap below
7 mm, which is the limiting value that the gasket cannot hold the required hydrostatic
pressures after exceeding this limit.

Page 1637 of 1971


Printed on 4/19/2018 at 4:41 PM Page 5 of 9
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\TBM_shear_dowels_20180419a_RW.xlsx

Contract Deep Tunnel Sewerage Tunnel Phase II Job ref.


Contract T-09
Part of structure Calc. sheet No.
Circumferential Shear Dowels Design

Orginator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. RYWO

CALCULATIONS NOTES

Circumferential Joint Shear Dowels


Reference OPTIMAS ANIXER data sheets of shear dowel ANIX 60 and 80

4. Criterion 2: Maintaining segment overturning stability


4.1. Segment self-weight

Point of rotation

Self-weight Ws = γ c L arc h b = 48.4 kN


Design self-weight load W s,d = γ L,w W s = 72.6 kN
Design overturning moment M o1,d = W s,d b / 2 = 58.1 kNm

4.2. Gasket force at failure

Max. gasket gap δ2


(assume gasket on top is
Min. gasket gap not in contact due to
δ3
h6 displacement > 17 mm)
hg h1 + h4
Max. dowel disp. & packing δ1

Packing thickness δ0
Point of
Gasket Gasket rotation
displacemen force

Lg,comp Lg,comp

h6 h2
h3 h1 h5
h4
Gasket under
Dowel installed compression

Packing thickness δ0 = tp = 2.0 mm


Max. dowel + packing disp. δ1 = (from Table 3.2 & 3.3) = 11.0 mm
Max. gasket gap δ2 = (from Table 3.1) = 17.0 mm (gasket force = 0 kN/m
beyond this gap)

Dowel height from CL h1 = = 316.5 mm


o
CL peak and base distance h2 = D c [1 - sin(90 - θ /2)]/2 = 577.2 mm (distance between the peak
and bottom of CL is similar
Gasket height from CL h3 = (h /2 - d g) cos(θ /2) = 88.1 mm to that of gasket, thus h 2
CL height from bottom h4 = h /2 cos(θ /2) = 124.7 mm applies in calculating h 5)
Total height from bottom h5 = h2 + h3 + h4 = 790.1 mm

Height to max. gap h6 = (h 1+h 4)(δ 2-δ 0)/(δ 1-δ 0) = 735.4 mm


< h 5 ,partially closed.

Page 1638 of 1971


Printed on 4/19/2018 at 4:41 PM Page 6 of 9
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\TBM_shear_dowels_20180419a_RW.xlsx

Contract Deep Tunnel Sewerage Tunnel Phase II Job ref.


Contract T-09
Part of structure Calc. sheet No.
Circumferential Shear Dowels Design

Orginator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. RYWO

CALCULATIONS NOTES

Circumferential Joint Shear Dowels


Reference OPTIMAS ANIXER data sheets of shear dowel ANIX 60 and 80

4.2. Gasket force at failure (cont.)

Min. gasket gap δ3 = (δ 2-δ 0)(h 3+h 4)/h 6 + δ 0 = 6.3 mm

Length of gasket in segment L g,1 = L g θ / 360o = 4.2 m


Length of gasket in comp. L g,comp = L g,1 (h 6 - h 3 - h 4)/ h 2 = 3.8 m

Average gasket deflection -- = (δ 2 + δ 3) / 2 = 11.7 mm


Average gasket stress (SLS)φ gF g,k = from Table 3.1 = 11.2 kN/m
Design gasket force (ULS) F g,d = γ L,g φ g F g,k = 12.3 kN/m
Moment arm of gasket force h g = (h 6 -h 3 -h 4)/3 + h 3 + h 4 = 387.0 mm

Design overturning moment M o2,d = F g,d L g,comp h g = 18.0 kNm

4.4. Resultant overturning moment


Design overturning moment M o,d = M o1,d + M o2,d = 76.1 kNm

4.5. Shear dowel provided restoring moment

h1 + h4

Point of
rotation

ANIX 60 shear dowels (2 out of 3 dowels provided per big segment)


Design capacity (ULS) R dt,d = from Table 3.2 = 80.0 kN/dowel
Design restoring moment M r,d = 2 R dt,d (h 1 + h 4) = 70.6 kNm

ANIX 80 shear dowels (2 out of 3 dowels provided per big segment)


Design capacity (ULS) R dt,d = from Table 3.3 = 108.0 kN/dowel
Design restoring moment M r,d = 2 R dt,d (h 1 + h 4) = 95.3 kNm

Dowel M o,d (kNm) M r,d (kNm) Utilization Remark


ANIX 60 76.1 70.6 107.8% Insufficient capacity
ANIX 80 76.1 95.3 79.8% OKAY

The most critical case would be installing a large segment at the the tunnel crown
while no segment else has been installed yet. The calculations above show that
2 out of 3 ANIX 80 (or equivalent) dowels would provide sufficient tensile capacity to
keep any large segment self standing, which would ensure the stability of all
segments during ring building even when the key stone is installed in the invert.
Page 1639 of 1971
Printed on 4/19/2018 at 4:41 PM Page 7 of 9
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\TBM_shear_dowels_20180419a_RW.xlsx

Contract Deep Tunnel Sewerage Tunnel Phase II Job ref.


Contract T-09
Part of structure Calc. sheet No.
Circumferential Shear Dowels Design

Orginator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. RYWO

CALCULATIONS NOTES

Circumferential Joint Shear Dowels


Reference OPTIMAS ANIXER data sheets of shear dowel ANIX 60 and 80

4.6. Shear dowel shear capacity

ANIX 60 shear dowels (2 out of 3 dowels provided per big segment)


Ult. shear capacity R dv,k = from data sheet = 145.0 kN/dowel (γ d = 1.25 applied)
Design shear capacity R v,d = 2 R dv,d / γ d = 232.0 kN

ANIX 80 shear dowels (2 out of 3 dowels provided per big segment)


Ult. shear capacity R dv,k = from data sheet = 145.0 kN/dowel (γ d = 1.25 applied)
Design shear capacity R v,d = 2 R dv,d / γ d = 232.0 kN

Dowel W s,d (kN) R v,d (kN) Utilization Remark


ANIX 60 72.6 232.0 31.3% OKAY
ANIX 80 72.6 232.0 31.3% OKAY

Page 1640 of 1971


Printed on 4/19/2018 at 4:41 PM Page 8 of 9
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\TBM_shear_dowels_20180419a_RW.xlsx

Contract Deep Tunnel Sewerage Tunnel Phase II Job ref.


Contract T-09
Part of structure Calc. sheet No.
Circumferential Shear Dowels Design

Orginator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. RYWO

CALCULATIONS NOTES

Circumferential Joint Shear Dowels


Reference OPTIMAS ANIXER data sheets of shear dowel ANIX 60 and 80

5. Criterion 3: Maintaining rotational stability of lining rings under TBM torque


This section evaluates the shear force on the shear dowel due to TBM
torque. The shear dowels have been designed to maintain the rotational
stability of lining rings.
Skin friction in
Dowel tangential tangential direction
shear force

TBM shield skin

Shear dowels

TBM torque

5.1. TBM skin friction


(friction provided
TBM shield skin friction -- = 1200.0 kN
construction team)
Resistance to torque T s,k = 1200 D TBM / 2 = 4536.0 kNm

5.2. TBM exceptional torque (provided by Herrenknecht)


Exceptional torque (max.) T 1,k = 6658.0 kNm
Partial load factor γ1 = 1.20
Design exceptional torque T 1,d = γ 1 (T 1,k - T s,k) = 2546.4 kNm

5.3. TBM breakout torque (provided by Herrenknecht)


Breakout torque (max.) T 2,k = 7254.0 kNm
Partial load factor γ2 = 1.05
Design breakout torque T 2,d = γ 2 (T 2,k - T s,k) = 2853.9 kNm

5.4. Dowel shear force


Design tangential shear F dtv,d = 2 max(T 1,d ,T 2,d)/(D c N d) = 75.8 kN

6. Required dowel ultimate capacities


This section summarizes the required ultimate tensile and shear capacities of dowels.

Req. ult. tensile capacity -- = γ d M o,d / h 1 = 107.8 kN/dowel


Req. ult. shear capacity -- = γ d max(W s,d/2, F dtv,d) = 94.7 kN/dowel

Dowel Shear capacity utilizationTensile capacity utilization Remark


ANIX 60 65.3% 107.8% Insufficient capacity
ANIX 80 65.3% 79.8% OKAY

Page 1641 of 1971


Printed on 4/19/2018 at 4:41 PM Page 9 of 9
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\DTSS2_T09_Shear
dowel_socket_design_20180419.xlsx
Contract Job ref.
Deep Tunnel Sewerage System Phase II JH044

Part of structure Calc. sheet No.


Design of dowel in circumferential joint

Originator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. NIWA RYWO

CALCULATIONS NOTES

Design of shear dowels socket in circumferential joint


ETAG 001, Annex C - Design methods for anchorages

Gasket
he
Dowel tensile load, T
Y-direction

do

Tangential shear Radial shear load, Vy


load, Vz
X-direction
Caulking groove

1. Segmental lining geometry


Lining thickness h = 0.300 m

2. Shear dowel properties


Outer dia. of dowel do = 0.057 m
Dowel embedment length h ef = 0.124 m
Dowel circum. spacing s cir = 1.345 m
Ultimate pull-out resistance N Rk,p = 86.2 kN/dowel

3. Concrete material properties


Char. cylinder strength f ck = 50,000 kPa
Char. cube strength f ck,cube = 60,000 kPa
Concrete material factor γc = 1.5
Long term effects coefficient α cc = 1.0 (Gasket force is temporary
construction load, i.e.
Design concrete strength f cd = α cc f ck / γ c = 33,333 kPa shorterm)

4. Reinforcing steel material properties


Char. yield strength of steel f yk = 500,000 kPa
Partial material factor γs = 1.15

5. Shear reinforcement
Nos. of reinforcement N RF = 3 bars
Reinforcement dia. d RF = 13 mm

6. Design load of shear dowel


Ult. radial shear load V y,u = 32.7 kN/dowel
Ult. tangential shear load V z,u = 75.8 kN/dowel
Ult. dowel tensile load Tu = N Rk,p = 86.2 kN/dowel (circumferential joint is
designed to resist the
Ult. resultant shear load Vu = √(V y,u2+V z,u2) = 82.6 kN/dowel ultimate dowel force)

7. Partial FOS for concrete cone failure / edge failure checking


Partial factor for installation γ 2 = = 1.0 (as lining segments anchor
are cast in precisely, γ 2 =
Partial factor for concrete cone resistance 1.0 is adopted)
γ Mc = γ cγ 2 = 1.5

Page 1642 of 1971


Printed on 4/19/2018 at 7:10 PM Page 1 of 4
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\DTSS2_T09_Shear
dowel_socket_design_20180419.xlsx
Contract Job ref.
Deep Tunnel Sewerage System Phase II JH044

Part of structure Calc. sheet No.


Design of dowel in circumferential joint

Originator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. NIWA RYWO

CALCULATIONS NOTES

Design of shear dowels socket in circumferential joint


ETAG 001, Annex C - Design methods for anchorages

8. Non-cracked concrete cone failure check

Cone failure

Dowel tensile load, Tu

c θc

8.1. Concrete cone failure check


Actual edge distance c = h /2 = 0.150 m
Critical edge distance c cr,N = 3 h ef / 2 = 0.186 m
Angle of concrete cone θc = tan-1 (h ef /c cr,N) = 33.7 ˚
Critical spacing s cr,N = 2 c cr,N = 0.371 m
Cone area (no edge) A cN,0 = s cr,N2 = 0.14 m²
Actual cone area A cN = min(c , c cr,N) s cr,N = 0.056 m²

Crack condition coefficient k1 = 10.1


1.5 (for non-cracked concrete,
Characteristic resistance N Rk,c0 = k 1 √(f ck,cube) h ef = 107.70 kN
5.2.2.4a of ETAG001)

Edge effect factor ψ s,N = 0.7 + 0.3 c / c cr,N = 0.94 (reinforcement provided
around anchor)
Shear spalling factor ψ re,N = 1.00
Group effect factor ψ ec,N = 1.00 (no group)

Characteristic resistance N Rk,c = N Rk,c0 (A cN/A cN,0) ψ s,N = 41.01 kN


Design resistance N Rd,c = N Rk,c/γ Mc = 27.34 kN Cone failure

Insufficient concrete capacity, reinforcement required.

8.2. Reinforcement requirement


Required rebar area A RF,req = √3 (T u γ RF / f yk,RF) = 343 mm² Helix

Provided steel area A RF,pro = N RF (ϖ (d RF / 2)2) = 398 mm²


Okay (shear cone failure is either
fully taken by concrete or
rebars)

Page 1643 of 1971


Printed on 4/19/2018 at 7:10 PM Page 2 of 4
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\DTSS2_T09_Shear
dowel_socket_design_20180419.xlsx
Contract Job ref.
Deep Tunnel Sewerage System Phase II JH044

Part of structure Calc. sheet No.


Design of dowel in circumferential joint

Originator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. NIWA RYWO

CALCULATIONS NOTES

Design of shear dowels socket in circumferential joint


ETAG 001, Annex C - Design methods for anchorages

9. Concrete pry-out failure


Concrete cone

NRk,c

VRk,cp

9.1. Concrete pry-out failure checking


Pry-out factor k = 1 if h ef < 60 mm, 2 if not = 2.0 (As per Sec 5.2.3.3 of
ETAG 001 - Annex C)
Pry-out resistance V Rk,cp = k N Rk,c = 82.02 kN
Design pry-out resistance V Rd,cp = V Rk,cp / γ Mc = 54.68 kN
Concrete cone
Insufficient concrete capacity, reinforcement required.

9.2. Reinforcement requirement


Required rebar area A RF,req = √3 (V u γ RF / f yk,RF) = 329 mm²
Helix
2
Provided steel area A RF,pro = N RF (ϖ (d RF / 2) ) = 398 mm²
Okay (pry-out failure is either
fully taken by concrete or
rebars)

Page 1644 of 1971


Printed on 4/19/2018 at 7:10 PM Page 3 of 4
C:\Users\RYWO\OneDrive - COWI\JH044_DTSS2\10. Bored Tunnel\04. DDA\04. Cals\8b. Shear Dowels Design\02 Shear Dowel Design\DTSS2_T09_Shear
dowel_socket_design_20180419.xlsx
Contract Job ref.
Deep Tunnel Sewerage System Phase II JH044

Part of structure Calc. sheet No.


Design of dowel in circumferential joint

Originator Checked by Approved by Date


4/19/2018
COWI Hong Kong Ltd. NIWA RYWO

CALCULATIONS NOTES

Design of shear dowels socket in circumferential joint


ETAG 001, Annex C - Design methods for anchorages

10. Non-cracked concrete edge failure check

Dowel shear load, V

h
c1
X-direction

Y
1.5c1 1.5c1 1.5c1
W Edge failure V
αV

Z-direction A0c,V c2
10.1. Concrete edge failure checking Z
Shear load direction angle αV = tan-1 (V z,u /V y,u) = 66.7 ˚ free edge

Edge distance c1 = h / (2 cos α v) = 0.379 m


Edge distance c2 = min(1.5 c 1, s cir /2) = 0.568 m
2
Cone area (no edge) A cV,0 = 4.5 c 1 = 0.645 m²
Actual cone area A cV = (1.5 c 1)(2 c 2) = 0.645 m²

Crack condition coefficient k1 = 2.4 (for non-cracked concrete)

Effective length of dowel lf = h ef = 0.124 m


0.5
Factor α α = 0.1 (l f / c 1) = 0.057
Factor β β = 0.1 (d o / c 1)0.2 = 0.069
Edge resistance V Rk,c0 = k 1 d oα h efβ √(f ck,cube) c 11.5
= 100.81 kN

Edge effect factor ψ s,V = min[0.7 + 0.2 c 2/c 1, 1] = 1.00


0.5
Member thickness factor ψ h,V = max[(1.5 c 1 / W ) , 1] = 1.00 (1.5 c 1 << W )

Shear force angle α V factor ψ α,V = max([(cos α V)2 + (sin α V / 2.5)2]-0.5,1)


= 1.85

Group effect factor ψ ec,V = 1.00 (no group)

Cracked concrete factor ψ re,V = 1.00 (non-cracked concrete w/o


edge reinforcement or
stirrups)
Characteristic resistance V Rk,c = V Rk,c0 (A cV / A cV,0) ψ s,V ψ h,V ψ α,V ψ ec,V ψ re,V
= 186.62 kN

Design resistance V Rd,c = V Rk,c/γ Mc = 124.41 kN


Okay, concrete edge capacity sufficient, reinforcement not requried.

10.2. Reinforcement requirement (NOT REQUIRED) Helix


Required rebar area A RF,req = √3 (V u γ RF / f yk,RF) = 329 mm²
Edge failure
2 (edge failure is either fully
Provided steel area A RF,pro = N RF (ϖ (d RF / 2) ) = 398 mm²
taken by concrete or
Okay rebars)

Page 1645 of 1971


Printed on 4/19/2018 at 7:10 PM Page 4 of 4
Helix rebar arrangement
for concrete cone failure
Helix reinforcement
350
B10 bars at 50 mm
Ladder reinforcement 3B13 bars 57 DIA. c/c spacing

300

34o 250

50 TYP.

MIN. 130
200
From Appendix J2, 343 mm2
Depth (mm)

reinforcing steel required.


Ladder provides 398 mm2, and
B10 helix provides
150 confinements to the dowel
under tension.

100150 DIA.

Lining
Dowel
50
Cone failure
Helix
Ladder bar
0
-200 -150 -100 -50 0 50 100 150 200
Width (mm)

Page 1646 of 1971


Helix rebar arrangement
for concrete cone failure
Helix reinforcement
350
B10 bars at 50 mm
Ladder reinforcement 3B13 bars 57 DIA. c/c spacing

300

34o 250

50 TYP.
From Appendix J2, 329 mm2

MIN. 130
reinforcing steel required.
200
Depth (mm)

Ladder provides 265 mm2, and


B10 helix provides >78 mm2.
Total provided steel area
150 343 mm2 > 329 mm2.

100150 DIA.
Lining
Dowel
50
Pry-out failure
Helix
Ladder bar
0
-200 -150 -100 -50 0 50 100 150 200
Width (mm)

Page 1647 of 1971


Product Sheet - SOF FIX ANIX 60 HSR

Page 1648 of 1971


1

Page 1649 of 1971


2

Page 1650 of 1971


3

Page 1651 of 1971


4

Page 1652 of 1971


Product Sheet - SOF FIX ANIX 80

Page 1653 of 1971


SOFRASAR TUNNEL PRODUCTS

SOF FIX ANIX 80


DOWEL SYSTEM

ANIXTER FRANCE - 9, rue Gutenberg - Z.I. - BP 50535 F-57205 SARREGUEMINES CEDEX - Tél. +33 (0)3 87 98 07 50 - Fax. +33 (0)3 87 98 90 45
Siège social : ANIXTER FRANCE SARL au capital de 25.510.000 € - Paris Nord 2 - 22 Avenue des Nations - 93420 VILLEPINTE - France - SIREN 349 968 388
RCS BOBIGNY - Code APE 4669B
Site internet : www.anixterfasteners.com Page 1654 of 1971
SOF FIX ANIX 80
LAST UPDATE : 13/02/2014

TECHNICAL FEATURES

Dowel: SOF FIX ANIX 80


(1 dowel + 2 sockets)
- Length: 247,5 mm

- Diameter : 68 mm

- Material : Polyamide 6.6 +


Core insert steel M16
- Pull-out Resistance : Yield 80 kN
Ultimate 140kN
- Shear Resistance: Ultimate 160kN

Socket

- Length : 112,2 mm

- External diameter : 57,3 mm

- Material : Polyamide

OUR REFERENCES

Reference Country Outer Ø Year


SAN FRANCISCO USA 2012
MOSCOW METRO LINE RUSSIA 2012
HONG KONG C823A HONG-KONG 2011

ANIXTER FRANCE - 9, rue Gutenberg - Z.I. - BP 50535 F-57205 SARREGUEMINES CEDEX - Tél. +33 (0)3 87 98 07 50 - Fax. +33 (0)3 87 98 90 45
Siège social : ANIXTER FRANCE SARL au capital de 25.510.000 € - Paris Nord 2 - 22 Avenue des Nations - 93420 VILLEPINTE - France - SIREN 349 968 388 1
RCS BOBIGNY - Code APE 4669B
Site internet : www.anixterfasteners.com Page 1655 of 1971
SOF FIX ANIX 80
LAST UPDATE : 13/02/2014

PULL-OUT TEST

PULL-OUT DIAGRAM of SOF FIX ANIX 80


160

140

120

100
Load (kN)

80

60

40

20

0
0 2 4 6 8 10 12
Displacement (mm)

SHEAR RESISTANCE TEST

SHEAR DIAGRAM of SOF FIX ANIX 80


180
160
140
120
Load (kN)

100
80
60
40
20
0
0 2 4 6 8 10 12 14 16
Displacement (mm)

ANIXTER FRANCE - 9, rue Gutenberg - Z.I. - BP 50535 F-57205 SARREGUEMINES CEDEX - Tél. +33 (0)3 87 98 07 50 - Fax. +33 (0)3 87 98 90 45
Siège social : ANIXTER FRANCE SARL au capital de 25.510.000 € - Paris Nord 2 - 22 Avenue des Nations - 93420 VILLEPINTE - France - SIREN 349 968 388 2
RCS BOBIGNY - Code APE 4669B
Site internet : www.anixterfasteners.com Page 1656 of 1971
SOF FIX ANIX 80
LAST UPDATE : 13/02/2014

MATERIEL DATA SHEET

Socket - Polyamide 6.6

Features Test specification Method Values


Tensile modulus MPa 1mm/min ISO 527-2 3000
Elongation at break % 50mm/min ISO 527-2 30
Flexural modulus MPa 2mm/min ISO 178 2850
Charpy impact strength kJ/m² 23°C ISO 178/1eU n.b.
Melting Point °C DSC, 10K/min DIN EN 11357-1 263
Density g/cm3 23°C ISO 1183 1.1
Water absorption % 23°C, 50% r.h. ISO 62 2.1

Dowel - Polyamide 6

Features Test specification Method Values


Tensile modulus MPa 1mm/min 527-1+2 3000
Elongation at break % 50mm/min 178 >30
Flexural modulus MPa 2mm/min 178 2600
Charpy impact strength kJ/m² 23°C 179/1eU n.b.
Melting Point °C DSC, 10K/min 11357 222
Density g/cm3 23°C 1183 1.06
Water absorption % 23°C, 100% r.h. 1110 2.6

ANIXTER FRANCE - 9, rue Gutenberg - Z.I. - BP 50535 F-57205 SARREGUEMINES CEDEX - Tél. +33 (0)3 87 98 07 50 - Fax. +33 (0)3 87 98 90 45
Siège social : ANIXTER FRANCE SARL au capital de 25.510.000 € - Paris Nord 2 - 22 Avenue des Nations - 93420 VILLEPINTE - France - SIREN 349 968 388 3
RCS BOBIGNY - Code APE 4669B
Site internet : www.anixterfasteners.com Page 1657 of 1971
SOF FIX ANIX 80
LAST UPDATE : 13/02/2014

OUR OTHER RANGE OF PRODUCTS

SOF FIX ANIX 60


Ø 68 Ø 59 Ø 88

Shear
Ultimate 160kN Ultimate 145kN Ultimate 200kN
Resistance
Pull-out Yield 60kN Yield 60kN Yield 60kN
resistance (Ultimate 110kN) (Ultimate 110kN) (Ultimate 110kN)

SOF FIX ANIX 80


Ø 68 Ø 68 TP Ø 68 HSR Ø 59 Ø 88 Ø 88 HSR

Ultimate
Shear Ultimate Ultimate Ultimate Ultimate Ultimate
145kN
Resistance 160kN 160kN 300kN 200kN 300kN
Yield 80kN Yield 50kN Yield 80kN Yield 80kN Yield 80kN Yield 80kN
Pull-out
(Ultimate (Ultimate (Ultimate (Ultimate (Ultimate (Ultimate
resistance 140kN) 80kN) 140kN) 140kN) 140kN) 140kN)

SOF FIX ANIX 110


Ø 76 Ø 100

Shear
Ultimate 200kN Ultimate 250kN
Resistance
Pull-out Yield 110kN Yield 110kN
resistance (Ultimate 170kN) (Ultimate 170kN)

ANIXTER FRANCE - 9, rue Gutenberg - Z.I. - BP 50535 F-57205 SARREGUEMINES CEDEX - Tél. +33 (0)3 87 98 07 50 - Fax. +33 (0)3 87 98 90 45
Siège social : ANIXTER FRANCE SARL au capital de 25.510.000 € - Paris Nord 2 - 22 Avenue des Nations - 93420 VILLEPINTE - France - SIREN 349 968 388 4
RCS BOBIGNY - Code APE 4669B
Site internet : www.anixterfasteners.com Page 1658 of 1971

You might also like