Heavy Equipment Loading For PLTU 1 NTB - Bima 2 X 10 MW: Pekerjaan Existing Material Installation

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

PEKERJAAN EXISTING MATERIAL INSTALLATION

Heavy Equipment Loading


For
PLTU 1 NTB – Bima 2 x 10 MW

PLTU 1 Bima, NTB


End User:

Supplier:

Vendor:

PT RAJA VOLTAMA ELECTRIC


Consultant:

Doc. No : -
Bidding No:

Project No.: PO No.:


- -
Pkg No.: Unit Plant No.:
Boiler Unit UNIT 1
Document Title.:
Heavy Equipment Loading
Vendor Document No.:
A 20-05-23 Issued For Approval DA SS DK
F-RVE-HEL-002
Revision Page No.:
Rev. Date Description Prepared Checked Approved No.: A 1 of 2
TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
THE OWNER
Equipment Loading
Pekerjaan Existing Material Installation
Proyek PLTU Bima 2x10 MW, Bima Nusa Benggara Barat
PT Raja Voltama Electric

Document No : F-RVE-HEL-002 Date : 20/05/2023


Revision : A Page : 2 of 2
Prepared by : DA

Qty Capacity Project Time Line (Day)


No. Equipment List
No Unit No Unit

100
105
110
115
120
125
130
135
140
145
150
155
160
165
170
175
180
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
1

1 Crane 1 Ea 75/100 Ton 5

2 Truck Crane 1 Ea 3 Ton

3 Forklift 1 Ea 3 Ton

4 Winches 2 Ea 15 Ton

5 Small Hoist 1 Ea 1 Ton