RO#66 GR-TCL Indent For Depth Coorelation 26.07.2023

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

OIL AND NATURAL GAS CORPORATION LIMITED

SUB-SURFACE TEAM, TRIPURA ASSET,TRIPURA ASSET

Internal Service Requisition for Logging Services


Indent No. LG00053950 Date & Time of Indent 25.07.2023 6:52:35 PM

Well No. RO#66 Lateral Number Well Id RODQ PEL-ML/ Non PEL ML ML

Tentative
Well Ready Date 26.07.2023 11:00:00 AM Rig Name HH-100-01 Rig Type
Time

Location, Near by Land Mark & Directions

Water Tentative /
Well Data KB 43.61
Depth
GL 35.79 Lat Long
Confirmed
Onshore /
Well Category D Well Type Directional Well Profile Job Type CH for TTP Onshore
Offshore

Objective of the Well ZONE TRANSFER FROM KP-65B TO KP-60A

Drillers
Max Deviation@Depth Kick off depth
Depth
Casing Float Collar
Bit Dia Shoe Depth PPF Type
Size/ Type Depth
Cementation Type of Qty of Cem Sp. Gravity of Expected
Date Cement Pumped Cement Slurry Cement Rise
Bore hole Sp. Gravity
Viscocity PH Salinity
fluid Type of B H fluid

Sand% Barytes% CaCO3% Water Loss

Circulation Start Circulation End Tight Pull if Mud Loss if any


Date &Time Date &Time any at depth Yes/No

Details of Service Required


Sl No. Service Name Depth/ Depth Interval Remarks
5 1/2" CSG, DEPTH COORELATION
0001 CCL-GR-CH 2,200 - 2,711
FOR TAGGING C/PLUG TOP
OIL AND NATURAL GAS CORPORATION LIMITED
SUB-SURFACE TEAM, TRIPURA ASSET,TRIPURA ASSET

Indent No. LG00053950 Well No. RO#66 Additional data in case of Production Logging/TTP Job
Objective of PLT
Tubing Size Tubing Shoe Well Clear Depth
0 0
(inches) (meters) (meter)

Inclination Data Date of Probing by BHS Probe Size


0
(Degrees) party (Inches)

FBHP SBHT

THP CHP Bean Size Qw Qo Qg Water Cut % GOR V/v Injection Rate

0.000

GLV Depth

Zone Opened

Zone Squeezed

Indent Indent Indent


Created/ JAGANATH ADHIKARI Approved JAGANATH ADHIKARI Accepted
Changed By By By

Installation Manager : CPF No. :

Disclaimer : The information provided in this indent is to facilitate preparation for the job and is indicative only. Actuals may vary.

Certificate
Adequate Parking place for Logging unit is available.

Catwalk and and Rotary floor will be cleared of tubing/drill pipes for Logging Operation.

Power Lines lines in and around the rig will be deactivated.

Power generator and State Electricity Board power (if <30m from rig mast and unit) will
be switched off during the jobs involving explosives.

Approach Road condition to drill site for Heavy vehicles is Good/Bad.

All vehicular movements in well premises will be stopped during jobs involving
explosives.

Signature of Rig Representative Signature of Logging Representative


Contact No- Contact No-
OIL AND NATURAL GAS CORPORATION LIMITED
SUB-SURFACE TEAM, TRIPURA ASSET,TRIPURA ASSET

Acceptor Remarks

Acceptor Name Accepted on Indent status APPROVED

You might also like